ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 55 more items below.
| Item | Quantity | R1John R Jurgensen Company | R2Fillmore Construction | R3Kokosing Construction Company INC | R4Shelly Company | % of bid |
|---|---|---|---|---|---|---|
| 441E10000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG | 2,679 CY | $185 | $210 | $204 | $214 | 45% |
| 251E01043 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 521 CY | $321 | $300 | $320 | $400 | 15% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" | 65,866 SY | $1.41 | $1.00 | $2.15 | $2.10 | 8% |
| 251E01041 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 995 SY | $52.38 | $32.00 | $57.00 | $50.00 | 5% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 107 CY | $375 | $210 | $360 | $320 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $50,000 | $65,000 |
| Item | Quantity | R1John R Jurgensen Company | R2Fillmore Construction | R3Kokosing Construction Company INC | R4Shelly Company |
|---|---|---|---|---|---|
| 202E32000 CURB REMOVED | 51 FT | $17.00 | $50.00 | $26.00 | $50.00 |
| 202E38001 GUARDRAIL REMOVED, AS PER PLAN | 306.75 FT | $2.50 | $2.50 | $2.40 | $2.40 |
| 202E42001 ANCHOR ASSEMBLY REMOVED, TYPE A, AS PER PLAN | 2 EACH | $425 | $425 | $385 | $385 |
| 202E42011 ANCHOR ASSEMBLY REMOVED, TYPE E, AS PER PLAN | 1 EACH | $175 | $175 | $165 | $165 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $83,000 |
| 4% |
| 608E52000 CURB RAMP | 1,782 SF | $20.00 | $43.00 | $20.00 | $43.00 | 3% |
| 202E30001 WALK REMOVED, AS PER PLAN | 2,689 SF | $12.00 | $10.00 | $6.00 | $10.00 | 3% |
| 407E20000 NON-TRACKING TACK COAT | 5,679 GAL | $5.00 | $3.00 | $2.65 | $3.00 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $18,394 | $33,500 | $50,005 | $100,000 | 2% |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 5.43 MILE | $2,700 | $2,700 | $2,080 | $2,700 | 1% |
| 251E01043 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 24 CY | $506 | $300 | $375 | $1,100 | 1% |
| 644E00105 EDGE LINE, 6", AS PER PLAN | 3.42 MILE | $3,535 | $3,535 | $3,470 | $3,535 | 1% |
| 644E00301 CENTER LINE, AS PER PLAN | 2.12 MILE | $5,209 | $5,209 | $5,340 | $5,209 | 1% |
| 621E00100 RPM | 226 EACH | $42.51 | $42.51 | $43.00 | $42.51 | 1% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 8 SNMT | $1,050 | $1,500 | $900 | $1,050 | 1% |
| 606E26151 ANCHOR ASSEMBLY, MGS TYPE E, AS PER PLAN (MASH 201 | 3 EACH | $2,500 | $2,500 | $2,825 | $2,825 | 1% |
| 608E10000 4" CONCRETE WALK | 810 SF | $9.00 | $16.00 | $8.70 | $16.00 | 1% |
| 606E15050 GUARDRAIL, TYPE MGS | 312.5 FT | $21.00 | $21.00 | $21.60 | $21.60 | 1% |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 4 EACH | $1,575 | $1,000 | $750 | $1,500 | 1% |
| 202E47001 BRIDGE TERMINAL ASSEMBLY REMOVED, AS PER PLAN | 1 EACH | $125 | $125 | $100 | $100 |
| 203E20001 EMBANKMENT, AS PER PLAN | 25 CY | $68.00 | $68.00 | $78.00 | $78.00 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 2 EACH | $1,100 | $1,100 | $1,320 | $1,320 |
| 606E35141 BRIDGE TERMINAL ASSEMBLY, TYPE 4, AS PER PLAN | 2 EACH | $1,250 | $1,250 | $1,450 | $1,450 |
| 606E98000 GUARDRAIL, MISC.: ALTERNATIVE GUARDRAIL PLACEMENT | 25 FT | $7.50 | $7.50 | $12.00 | $12.00 |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 84 FT | $40.00 | $110 | $57.00 | $110 |
| 609E24510 CURB, TYPE 4-C | 106 FT | $35.00 | $110 | $36.50 | $110 |
| 659E00300 TOPSOIL | 41 CY | $140 | $80.00 | $30.00 | $250 |
| 659E10000 SEEDING AND MULCHING | 395 SY | $10.00 | $3.00 | $9.80 | $9.80 |
| 659E14000 REPAIR SEEDING AND MULCHING | 20 SY | $1.00 | $3.00 | $2.00 | $2.00 |
| 659E15000 INTER-SEEDING | 20 SY | $0.01 | $3.00 | $0.10 | $0.10 |
| 659E20000 COMMERCIAL FERTILIZER | 0.14 TON | $1,500 | $1,000 | $650 | $650 |
| 659E31000 LIME | 0.15 ACRE | $200 | $1,000 | $60.00 | $60.00 |
| 659E35000 WATER | 2 MGAL | $1.00 | $10.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 4 EACH | $649 | $1,000 | $850 | $1,500 |
| 617E10100 COMPACTED AGGREGATE | 11 CY | $282 | $300 | $150 | $220 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 4 EACH | $561 | $500 | $750 | $50.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 226 EACH | $10.62 | $10.00 | $1.00 | $4.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 16 EACH | $12.00 | $12.00 | $11.80 | $11.80 |
| 642E00105 EDGE LINE, 6", TYPE 1, AS PER PLAN | 1.87 MILE | $1,495 | $1,495 | $2,100 | $1,495 |
| 642E00301 CENTER LINE, TYPE 1, AS PER PLAN | 1.19 MILE | $2,244 | $2,244 | $2,280 | $2,244 |
| 644E00205 LANE LINE, 6", AS PER PLAN | 0.11 MILE | $7,709 | $7,709 | $1,470 | $7,709 |
| 644E00400 CHANNELIZING LINE, 8" | 1,417 FT | $1.75 | $1.75 | $2.00 | $1.75 |
| 644E00501 STOP LINE, AS PER PLAN | 303 FT | $7.00 | $7.00 | $6.70 | $7.00 |
| 644E00621 CROSSWALK LINE, 12", AS PER PLAN | 1,636 FT | $3.50 | $3.50 | $3.30 | $3.50 |
| 644E00701 TRANSVERSE/DIAGONAL LINE, AS PER PLAN | 259 FT | $6.00 | $6.00 | $6.70 | $6.00 |
| 644E00901 ISLAND MARKING, AS PER PLAN | 60 SF | $3.00 | $3.00 | $4.00 | $3.00 |
| 644E01001 RAILROAD SYMBOL MARKING, AS PER PLAN | 4 EACH | $575 | $575 | $422 | $575 |
| 644E01301 LANE ARROW, AS PER PLAN | 16 EACH | $80.00 | $80.00 | $105 | $80.00 |
| 644E01511 DOTTED LINE, 6", AS PER PLAN | 113 FT | $2.50 | $2.50 | $2.65 | $2.50 |
| 646E10010 EDGE LINE, 6" | 0.18 MILE | $16,400 | $16,400 | $14,350 | $16,400 |
| 646E10200 CENTER LINE | 0.13 MILE | $32,000 | $32,000 | $22,080 | $32,000 |
| 646E10300 CHANNELIZING LINE, 8" | 40 FT | $15.00 | $15.00 | $8.30 | $15.00 |
| 646E10600 TRANSVERSE/DIAGONAL LINE | 58 FT | $15.00 | $15.00 | $27.50 | $15.00 |
| 646E20300 LANE ARROW | 1 EACH | $405 | $405 | $445 | $405 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 20 FT | $12.00 | $12.00 | $40.00 | $16.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 14 FT | $25.00 | $25.00 | $42.50 | $16.50 |
| 630E80100 SIGN, FLAT SHEET | 2 SF | $35.00 | $35.00 | $45.00 | $19.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 48 HOUR | $106 | $100 | $85.00 | $80.00 |
| 614E12460 WORK ZONE MARKING SIGN | 32 EACH | $115 | $150 | $150 | $115 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 0.22 MILE | $750 | $750 | $925 | $750 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 3.42 MILE | $1,350 | $1,350 | $1,385 | $1,350 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 2,834 FT | $0.90 | $0.90 | $1.70 | $0.90 |
| 614E24610 WORK ZONE DOTTED LINE, CLASS III, 4", 642 PAINT | 113 FT | $1.00 | $1.00 | $2.30 | $1.00 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 174 FT | $3.00 | $3.00 | $5.75 | $3.00 |
| 614E27250 WORK ZONE CROSSWALK LINE, CLASS III, 12", 642 PAIN | 660 FT | $1.50 | $1.50 | $2.85 | $1.50 |
| 614E32210 WORK ZONE RAILROAD SYMBOL MARKING, CLASS III, 642 | 2 EACH | $245 | $245 | $405 | $245 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,029 | $28,000 | $5,500 | $10,000 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $4,537 | $7,500 | $1,000 | $6,500 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $5,000 | $10,000 | $3,150 | $2,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E10000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG | 2,679 CY | $184.79 | $495k | 41% |
| 251E01043 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 521 CY | $321.05 | $167k | 14% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" | 65,866 SY | $1.41 | $93k | 8% |
| 251E01041 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 995 SY | $52.38 | $52k | 4% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 107 CY | $375.4 | $40k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 3% |
| 608E52000 CURB RAMP | 1,782 SF | $20 | $36k | 3% |
| 202E30001 WALK REMOVED, AS PER PLAN | 2,689 SF | $12 | $32k | 3% |
| 407E20000 NON-TRACKING TACK COAT | 5,679 GAL | $5 | $28k | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $18,394 | $18k | 2% |