HAM-US 22-04.80
HAM County · est $3.9M
Bid dateThursday, March 27—
HAM County · est $3.9M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 74 more items below.
| Item | Quantity | R1John R Jurgensen Company | R2Barrett Paving Materials INC | % of bid |
|---|---|---|---|---|
| 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 3,443 CY | $217 | $258 | 25% |
| 442E20100 ASPHALT CONCRETE INTERMEDIATE COURSE, 9.5 MM, TYPE | 3,443 CY | $197 | $248 | 23% |
| 253E02000 PAVEMENT REPAIR | 567.3 CY | $543 | $525 | 10% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3" DEPTH | 82,629 SY | $2.66 | $3.90 | 7% |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 276 EACH | $744 | $500 | 7% |
| 624E10000 MOBILIZATION | 1 LS | $150,000 | $75,000 | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $113,363 | $177,000 | 4% |
| 608E52000 CURB RAMP | 3,399 SF | $22.00 | $32.00 | 3% |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 127 EACH | $542 | $500 | 2% |
| 253E02001 PAVEMENT REPAIR, AS PER PLAN | 67 CY | $903 | $800 | 2% |
| 202E30000 WALK REMOVED | 5,654 SF | $10.01 | $5.00 | 2% |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 67 EACH | $744 | $950 | 2% |
| 407E20000 NON-TRACKING TACK COAT | 9,502 GAL | $5.00 | $3.00 | 2% |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 21 EACH | $2,100 | $2,100 | 1% |
| 611E04400 12" CONDUIT, TYPE B, RCP | 95 FT | $355 | $200 | 1% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 300 HOUR | $106 | $90.00 | 1% |
| 608E12000 5" CONCRETE WALK | 2,322 SF | $11.71 | $11.00 | 1% |
| 644E00630 CROSSWALK LINE, 24" | 5,627 FT | $4.60 | $4.60 | 1% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 2 EACH | $11,305 | $11,305 | 1% |
| 621E00100 RPM | 536 EACH | $32.45 | $32.45 | 1% |
| Item | Quantity | R1John R Jurgensen Company | R2Barrett Paving Materials INC |
|---|---|---|---|
| 202E32000 CURB REMOVED | 842 FT | $16.28 | $6.50 |
| 609E26000 CURB, TYPE 6 | 261 FT | $37.97 | $35.00 |
| 690E98400 SPECIAL - CONSULTANT FOR CONCRETE QUALITY CONTROL | 1 LS | $9,170 | $10,000 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 |
| 611E98150 CATCH BASIN, NO. 3 | 2 EACH | $4,029 | $6,500 |
| 611E98180 CATCH BASIN, NO. 3A | 3 EACH | $2,782 | $4,000 |
| 611E99700 SPECIAL - GAS VALVE BOX ADJUSTED TO GRADE |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 3 EACH |
| $511 |
| $600 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 644 EACH | $13.11 | $10.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 48 FT | $23.63 | $23.63 |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 32 EACH | $140 | $140 |
| 630E80100 SIGN, FLAT SHEET | 86.4 SF | $28.32 | $28.32 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 2 EACH | $16.09 | $16.09 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $72.83 | $72.83 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 1 EACH | $21.46 | $21.46 |
| 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL | 57 EACH | $16.09 | $16.09 |
| 631E94490 REMOVAL, MISC.: SIGN FLASHER ASSEMBLY | 1 EACH | $600 | $600 |
| 642E00200 LANE LINE, 4", TYPE 1 | 0.15 MILE | $13,405 | $13,405 |
| 642E00300 CENTER LINE, TYPE 1 | 0.05 MILE | $15,235 | $15,235 |
| 642E00400 CHANNELIZING LINE, 8", TYPE 1 | 129 FT | $1.00 | $1.00 |
| 642E00500 STOP LINE, TYPE 1 | 72 FT | $3.50 | $3.50 |
| 642E01300 LANE ARROW, TYPE 1 | 8 EACH | $75.00 | $75.00 |
| 642E01500 DOTTED LINE, 4", TYPE 1 | 67 FT | $0.90 | $0.90 |
| 644E00100 EDGE LINE, 4" | 2.28 MILE | $2,955 | $2,955 |
| 644E00200 LANE LINE, 4" | 2.45 MILE | $760 | $760 |
| 644E00300 CENTER LINE, DOUBLE YELLOW | 1.89 MILE | $5,405 | $5,405 |
| 644E00300 CENTER LINE,TWLT PROHIBITED LEFT | 0.61 MILE | $3,625 | $3,625 |
| 644E00300 CENTER LINE,TWLT PROHIBITED RIGHT | 0.59 MILE | $3,625 | $3,625 |
| 644E00400 CHANNELIZING LINE, 8" | 3,085 FT | $1.20 | $1.20 |
| 644E00500 STOP LINE | 784 FT | $4.85 | $4.85 |
| 644E00700 TRANSVERSE/DIAGONAL LINE, 24", WHITE | 1,093 FT | $4.60 | $4.60 |
| 644E00700 TRANSVERSE/DIAGONAL LINE, 24", YELLOW | 3,163 FT | $4.60 | $4.60 |
| 644E00900 ISLAND MARKING | 808 SF | $4.45 | $4.45 |
| 644E01200 PARKING LOT STALL MARKING | 716 FT | $2.55 | $2.55 |
| 644E01300 LANE ARROW | 107 EACH | $100 | $100 |
| 644E01400 WORD ON PAVEMENT, 72" | 8 EACH | $125 | $125 |
| 644E01500 DOTTED LINE, 4"' WHITE | 1,455 FT | $1.15 | $1.15 |
| 644E01630 BIKE LANE SYMBOL MARKING | 29 EACH | $385 | $385 |
| 644E19000 SHARED LANE MARKING | 37 EACH | $350 | $350 |
| 644E01500 DOTTED LINE, 4"' YELLOW | 270 FT | $1.15 | $1.15 |
| 625E31600 PULL BOX, MISC.: PULL BOX ADJUSTED TO GRADE | 9 EACH | $300 | $300 |
| 630E79000 SIGN HANGER ASSEMBLY, SPAN WIRE | 3 EACH | $294 | $294 |
| 630E80100 SIGN, FLAT SHEET | 20 SF | $28.32 | $28.32 |
| 630E87101 REMOVAL OF OVERHEAD MOUNTED SIGN AND REERECTION, A | 1 EACH | $556 | $556 |
| 630E87400 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL | 1 EACH | $80.92 | $80.92 |
| 632E05065 VEHICULAR SIGNAL HEAD, (LED), 4-SECTION, 12" LENS, | 1 EACH | $1,175 | $1,175 |
| 632E05087 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 1 EACH | $1,550 | $1,550 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 2 EACH | $100 | $100 |
| 632E27200 LOOP DETECTOR TIE IN | 21 EACH | $100 | $100 |
| 632E40701 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG, AS PER PLAN | 600 FT | $3.00 | $3.00 |
| 632E90201 REUSE OF VEHICULAR SIGNAL HEAD, AS PER PLAN | 2 EACH | $400 | $400 |
| 632E90400 SIGNALIZATION, MISC.:REPROGRAM EXISTING CONTROLLER | 1 EACH | $1,465 | $1,465 |
| 614E20100 WORK ZONE LANE LINE, CLASS I, 4", 642 PAINT | 7.1 MILE | $150 | $150 |
| 614E20550 WORK ZONE LANE LINE, CLASS III, 4", 642 PAINT | 2.38 MILE | $135 | $135 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 5.12 MILE | $500 | $500 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT, TWLT PR | 0.68 MILE | $355 | $355 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT, TWLT PR | 0.74 MILE | $355 | $355 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 1.81 MILE | $485 | $485 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT, TWLT | 0.66 MILE | $340 | $340 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT, TWLT | 0.63 MILE | $340 | $340 |
| 614E22100 WORK ZONE EDGE LINE, CLASS I, 4", 642 PAINT | 2.4 MILE | $295 | $295 |
| 614E22350 WORK ZONE EDGE LINE, CLASS III, 4", 642 PAINT | 2.4 MILE | $280 | $280 |
| 614E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 642 PAIN | 7,162 FT | $0.35 | $0.35 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 3,481 FT | $0.30 | $0.30 |
| 614E24204 WORK ZONE DOTTED LINE, CLASS I, 8", 642 PAINT | 234 FT | $0.25 | $0.25 |
| 614E24614 WORK ZONE DOTTED LINE, CLASS III, 8", 642 PAINT | 1,555 FT | $0.20 | $0.20 |
| 614E27050 WORK ZONE CROSSWALK LINE, CLASS I, 12", 642 PAINT, | 10,756 FT | $1.50 | $1.50 |
| 614E27060 WORK ZONE CROSSWALK LINE, CLASS I, 24", 642 PAINT, | 320 FT | $2.00 | $2.00 |
| 614E27260 WORK ZONE CROSSWALK LINE, CLASS III, 24", 642 PAIN | 5,627 FT | $1.90 | $1.90 |
| 614E30200 WORK ZONE ARROW, CLASS I, 642 PAINT | 170 EACH | $50.00 | $50.00 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT | 85 EACH | $45.00 | $45.00 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 1,782 FT | $2.50 | $2.50 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 738 FT | $2.40 | $2.40 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $11,789 | $12,241 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $8,667 | $15,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 3,443 CY | $217.19 | $748k | 23% |
| 442E20100 ASPHALT CONCRETE INTERMEDIATE COURSE, 9.5 MM, TYPE | 3,443 CY | $196.62 | $677k | 21% |
| 253E02000 PAVEMENT REPAIR | 567.3 CY | $542.73 | $308k | 10% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3" DEPTH | 82,629 SY | $2.66 | $220k | 7% |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 276 EACH | $743.88 | $205k | 6% |
| 624E10000 MOBILIZATION | 1 LS | $150,000 | $150k | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $113,363 | $113k | 3% |
| 608E52000 CURB RAMP | 3,399 SF | $22 | $75k | 2% |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 127 EACH | $542.22 | $69k | 2% |
| 253E02001 PAVEMENT REPAIR, AS PER PLAN | 67 CY | $903.05 | $61k | 2% |