JAC-SR 93-07.35
JAC County · est $0.5M
Bid dateThursday, March 27—
JAC County · est $0.5M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 28 more items below.
| Item | Quantity | R1Fillmore Construction | R2Scioto Valley Paving LLC | R3Axis Civil Construction LLC | R4Eclipse CO LLC | R5D G M INC | % of bid |
|---|---|---|---|---|---|---|---|
| 611E26000 72" CONDUIT, TYPE A, 707.01 METALLIC COATED (ALUMI | 128 FT | $500 | $490 | $610 | $568 | $1,325 | 19% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 251 CY | $228 | $90.00 | $300 | $260 | $220 | 17% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 224 CY | $200 | $320 | $290 | $249 | $245 | 13% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20,000 | $20,000 | $49,714 | $20,000 | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $18,850 | $5,500 | $6,500 | $15,500 | $20,000 | 6% |
| 203E20000 |
| Item | Quantity | R1Fillmore Construction | R2Scioto Valley Paving LLC | R3Axis Civil Construction LLC | R4Eclipse CO LLC | R5D G M INC |
|---|---|---|---|---|---|---|
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 5 FT | $50.00 | $24.00 | $50.00 | $99.50 | $25.00 |
| 202E35201 PIPE REMOVED, OVER 24" DIAMETER, AS PER PLAN | 49 FT | $100 | $125 | $180 | $163 | $160 |
| 202E38000 GUARDRAIL REMOVED | 203 FT | $5.00 | $14.00 | $4.50 | $10.00 | $1.00 |
| 204E10000 SUBGRADE COMPACTION | 969 SY | $5.00 | $6.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 519 CY |
| $25.00 |
| $48.00 |
| $25.00 |
| $39.00 |
| $25.00 |
| 4% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (51 CY | $240 | $375 | $295 | $360 | $300 | 4% |
| 203E10000 EXCAVATION | 585 CY | $20.00 | $40.00 | $25.00 | $43.00 | $25.00 | 3% |
| 623E40500 REFERENCE MONUMENT, TYPE A | 4 EACH | $2,500 | $1,000 | $950 | $778 | $400 | 3% |
| 253E02000 PAVEMENT REPAIR | 100 CY | $100 | $20.00 | $130 | $500 | $345 | 3% |
| 304E20000 AGGREGATE BASE | 155 CY | $60.00 | $160 | $120 | $123 | $100 | 3% |
| 611E07600 18" CONDUIT, TYPE C, 707.35 POLYETHYLENE PROFILE W | 90 FT | $100 | $175 | $50.00 | $149 | $150 | 3% |
| 614E12420 DETOUR SIGNING | 1 LS | $8,995 | $4,000 | $4,500 | $4,500 | $5,000 | 3% |
| 202E23000 PAVEMENT REMOVED | 592 SY | $15.00 | $23.00 | $11.00 | $15.50 | $12.00 | 3% |
| 602E20000 CONCRETE MASONRY | 5.9 CY | $1,500 | $1,100 | $1,590 | $1,261 | $1,250 | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, VARIABLE THICK | 345 SY | $25.00 | $30.00 | $18.00 | $23.00 | $22.00 | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $7,500 | $7,500 | $10,000 | $3,500 | $12,000 | 2% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $7,500 | $10,000 | $7,500 | $20,000 | $500 | 2% |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 50 CY | $120 | $275 | $135 | $145 | $120 | 2% |
| 605E31100 AGGREGATE DRAINS | 240 FT | $25.00 | $30.00 | $15.00 | $27.50 | $25.00 | 2% |
| $4.00 |
| $1.00 |
| $5.00 |
| 204E45000 PROOF ROLLING | 1 HOUR | $100 | $200 | $200 | $358 | $100 |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 23 CY | $140 | $280 | $135 | $145 | $125 |
| 659E10000 SEEDING AND MULCHING | 1,596 SY | $3.00 | $4.50 | $2.20 | $2.20 | $3.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 80 SY | $3.00 | $4.50 | $2.20 | $2.20 | $0.05 |
| 659E20000 COMMERCIAL FERTILIZER | 0.22 TON | $1,000 | $1.00 | $1,250 | $1,250 | $1,500 |
| 659E31000 LIME | 0.33 ACRE | $1,000 | $1.00 | $150 | $150 | $300 |
| 659E35000 WATER | 5 MGAL | $10.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E98510 CATCH BASIN, NO. 2-3 | 1 EACH | $3,500 | $3,500 | $4,900 | $5,694 | $2,500 |
| 407E10000 TACK COAT | 453 GAL | $4.00 | $0.25 | $5.00 | $2.50 | $2.50 |
| 621E00100 RPM | 5 EACH | $394 | $800 | $525 | $525 | $500 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 5 EACH | $50.00 | $30.00 | $50.00 | $31.50 | $1.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 28 FT | $21.00 | $30.00 | $13.00 | $21.00 | $30.00 |
| 630E08600 SIGN POST REFLECTOR | 2 EACH | $75.00 | $20.00 | $23.00 | $75.00 | $75.00 |
| 630E80100 SIGN, FLAT SHEET | 14.8 SF | $23.50 | $45.00 | $25.00 | $23.50 | $30.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 3 EACH | $40.00 | $200 | $70.00 | $40.00 | $15.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $35.00 | $200 | $100 | $35.00 | $15.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.1 MILE | $14,450 | $40,000 | $8,650 | $8,650 | $9,200 |
| 642E00300 CENTER LINE, TYPE 1 | 0.05 MILE | $28,900 | $40,000 | $16,750 | $16,750 | $17,500 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 8 HOUR | $100 | $75.00 | $65.00 | $65.00 | $60.00 |
| 616E10000 WATER | 1 MGAL | $10.00 | $1.00 | $1.00 | $211 | $1.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,500 | $6,000 | $4,500 | $9,500 | $25,000 |
| 619E16000 FIELD OFFICE, TYPE A | 1 MNTH | $1,000 | $100 | $1,850 | $1,022 | $1,250 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,500 | $6,900 | $6,500 | $5,000 | $5,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E26000 72" CONDUIT, TYPE A, 707.01 METALLIC COATED (ALUMI | 128 FT | $500 | $64k | 16% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 251 CY | $228 | $57k | 15% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 224 CY | $200 | $45k | 12% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20k | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $18,850 | $19k | 5% |
| 203E20000 EMBANKMENT | 519 CY | $25 | $13k | 3% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (51 CY | $240 | $12k | 3% |
| 203E10000 EXCAVATION | 585 CY | $20 | $12k | 3% |
| 623E40500 REFERENCE MONUMENT, TYPE A | 4 EACH | $2,500 | $10k | 3% |
| 253E02000 PAVEMENT REPAIR | 100 CY | $100 | $10k | 3% |