Figure 0.1 · BRIEFING BID #250172 · ODOT RESULT · awarded Mar 27 D03-PM FY2025 D03 County · est $4.4M
Bid date Thursday, March 27 —
Project scope Bid form · ODOT
31 ITEMS Pavement Marking 61% Mobilization & General 13% Maintaining Traffic 6% Erosion & Landscaping 3% Other 16% Top items by winning bid Item Qty Unit price Extended % 642E00104 EDGE LINE, 6", TYPE 1 2,454.64 MILE $640 $1.57M
Item Quantity R1 The Aero-mark Company LLC R2 Oglesby Construction INC % of bid 642E00104 EDGE LINE, 6", TYPE 1 2,454.64 MILE $640 $670 48% 642E00300 CENTER LINE, TYPE 1 991 MILE $552 $625 17% 643E00104 EDGE LINE, 6" 229.34 MILE $1,268 $1,300 9% 643E00500 STOP LINE 37,677 FT $4.00 $4.25 5% 642E00204 LANE LINE, 6", TYPE 1 486.92 MILE $303 $300 5% 643E00300 CENTER LINE 116.25 MILE $1,217 $1,300 4% 643E01300 LANE ARROW 1,340 EACH $62.00 $70.00 3% 643E00700 TRANSVERSE/DIAGONAL LINE 23,176 FT $2.50 $3.50 2% 643E00404 CHANNELIZING LINE, 12" 99,603 FT $0.58 $0.75 2% 643E01510 DOTTED LINE, 6" 44,320 FT $0.85 $1.50 1% 643E01350 TWO WAY LEFT TURN ARROW 235 EACH $125 $110 1% 643E01000 RAILROAD SYMBOL MARKING 73 EACH $365 $400 1% 614E11000 MAINTAINING TRAFFIC 1 LS $25,000 $34,000 1% 643E01310 WRONG WAY ARROW 125 EACH $188 $180 1% 643E00620 CROSSWALK LINE, 12" 7,828 FT $2.50 $2.65 1% 624E10000 MOBILIZATION 1 LS $15,000 $74,000 0% 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM 1 LS $14,105 $18,500 0% 643E01110 SCHOOL SYMBOL MARKING, 96" 37 EACH $365 $400 0% 643E00720 CHEVRON MARKING 4,038 FT $2.50 $3.50 0% 624E10001 MOBILIZATION, AS PER PLAN 1 LS $10,000 $1,500 0%
Show all 31 line items Item Quantity R1 The Aero-mark Company LLC R2 Oglesby Construction INC 832E30000 EROSION CONTROL 1,000 EACH $1.00 $1.00 643E00204 LANE LINE, 6" 0.44 MILE $471 $520 643E01410 WORD ON PAVEMENT, 96" 38 EACH $65.00 $114 643E20802 YIELD LINE 208 FT $5.00 $20.00 643E30000 REMOVAL OF PAVEMENT MARKING 200 FT $2.50 $2.50 643E30010 REMOVAL OF PAVEMENT MARKING 100 SF $2.50 $3.00 643E30020 REMOVAL OF PAVEMENT MARKING 50 EACH
Project details
Description D03-PM FY2025
Type of work Pavement How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →