SUM-SR 261-10.25
SUM County · est $5.3M
Bid dateThursday, May 8—
SUM County · est $5.3M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 42 more items below.
| Item | Quantity | R1S E T INC | % of bid |
|---|---|---|---|
| AA1 607E98000 FENCE, MISC.:VANDAL PROTECTION FENCE, 7.50' STRAIG | 9,792 FT | $185 | 18% |
| 530E00400 SPECIAL - STRUCTURES: REFURBISHING AND LUBRICATING | 12 EACH | $90,000 | 11% |
| 530E00400 SPECIAL - STRUCTURES: REFURBISHING AND LUBRICATING | 12 EACH | $90,000 | 11% |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $900,000 | 9% |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $900,000 | 9% |
| 624E10000 MOBILIZATION | 1 LS | $675,000 | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $585,000 | 6% |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 7,515 SY | $60.00 | 4% |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 6,220 SY | $70.00 | 4% |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 7,605 SY | $40.00 | 3% |
| 530E00800 SPECIAL - STRUCTURES: STRUCTURAL DEBRIS NETTING IN | 4,581 SY | $65.00 | 3% |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 6,326 SY | $47.00 | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $250,000 | 2% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 10,381 SF | $17.00 | 2% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 10,344 SF | $17.00 | 2% |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 10,381 SF | $15.50 | 2% |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 10,344 SF | $15.50 | 2% |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 10,381 SF | $15.00 | 2% |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 10,381 SF | $15.00 | 2% |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 10,344 SF | $15.00 | 2% |
| Item | Quantity | R1S E T INC |
|---|---|---|
| 202E98100 REMOVAL MISC.: BARRIER REFLECTOR | 272 EACH | $6.50 |
| 690E91000 SPECIAL - AS-BUILT CONSTRUCTION PLANS | 1 LS | $3,500 |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 |
| 626E00102 BARRIER REFLECTOR, TYPE 1 (ONE-WAY) | 1,360 EACH | $8.50 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 100 HOUR | $100 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 6 SNMT | $2,000 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 1.28 MILE | $14,000 |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN, AROUND BRIDGES | 1 LS | $5,500 |
| 202E75001 FENCE REMOVED, AS PER PLAN |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 4,951 FT |
| $21.50 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 10,344 SF | $15.00 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 8 MNHR | $160 |
| 514E10000 FINAL INSPECTION REPAIR | 3 EACH | $525 |
| 516E10010 ARMORLESS PREFORMED JOINT SEAL | 735 FT | $75.00 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 50 SF | $320 |
| 519E12304 PATCHING CONCRETE BRIDGE DECK - TYPE C | 66 SY | $700 |
| 530E00500 SPECIAL - STRUCTURES: SALT REMEDIATION FOR STRUCTU | 35 HOUR | $160 |
| 530E00800 SPECIAL - STRUCTURES: CONCRETE SPALL REMOVAL WITH | 100 SY | $530 |
| 530E00800 SPECIAL - STRUCTURES: STRUCTURAL DEBRIS NETTING IN | 2,246 SY | $65.00 |
| 630E80100 SIGN, FLAT SHEET, 730.20 | 2 SF | $115 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 2 EACH | $36.00 |
| 847E10001 MICRO SILICA MODIFIED CONCRETE OVERLAY, AS PER PLA | 32 SY | $400 |
| 847E20001 MICRO SILICA MODIFIED CONCRETE OVERLAY (VARIABLE T | 1 CY | $270 |
| 847E30000 TEST SLAB | 1 LS | $1,000 |
| 847E30201 FULL DEPTH REPAIR, AS PER PLAN | 1 CY | $750 |
| 847E30401 EXISTING CONCRETE OVERLAY REMOVED, AS PER PLAN (T= | 32 SY | $170 |
| 847E50000 HAND CHIPPING | 2 SY | $135 |
| 530E00300 SPECIAL - STRUCTURES' STEEL, MISC.: TEMPORARY STIF | 4,320 LB | $21.00 |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN, AROUND BRIDGES | 1 LS | $5,500 |
| 202E75001 FENCE REMOVED, AS PER PLAN | 4,841 FT | $21.50 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 8 MNHR | $160 |
| 514E10000 FINAL INSPECTION REPAIR | 3 EACH | $525 |
| 516E10010 ARMORLESS PREFORMED JOINT SEAL | 610 FT | $115 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 100 SF | $320 |
| 519E12304 PATCHING CONCRETE BRIDGE DECK - TYPE C | 59 SY | $700 |
| 530E00500 SPECIAL - STRUCTURES: SALT REMEDIATION FOR STRUCTU | 35 HOUR | $160 |
| 530E00800 SPECIAL - STRUCTURES: CONCRETE SPALL REMOVAL WITH | 80 SY | $530 |
| 630E80100 SIGN, FLAT SHEET, 730.20 | 2 SF | $115 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 2 EACH | $36.00 |
| 530E00300 SPECIAL - STRUCTURES' STEEL, MISC.: TEMPORARY STIF | 4,320 LB | $21.00 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $25,000 |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $3,200 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $30,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| AA1 607E98000 FENCE, MISC.:VANDAL PROTECTION FENCE, 7.50' STRAIG | 9,792 FT | $185 | $1.81M | 16% |
| 530E00400 SPECIAL - STRUCTURES: REFURBISHING AND LUBRICATING | 12 EACH | $90,000 | $1.08M | 9% |
| 530E00400 SPECIAL - STRUCTURES: REFURBISHING AND LUBRICATING | 12 EACH | $90,000 | $1.08M | 9% |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $900,000 | $900k | 8% |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $900,000 | $900k | 8% |
| 624E10000 MOBILIZATION | 1 LS | $675,000 | $675k | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $585,000 | $585k | 5% |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 7,515 SY | $60 | $451k | 4% |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 6,220 SY | $70 | $435k | 4% |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 7,605 SY | $40 | $304k | 3% |