PIK-SR 772-19.00
PIK County · est $1.1M
Bid dateThursday, April 24—
PIK County · est $1.1M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount.
| Item | Quantity | R1Fillmore Construction | R2Shelly Company | R3Shelly & Sands INC | % of bid |
|---|---|---|---|---|---|
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 3,009 CY | $196 | $215 | $225 | 57% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE,1.5" | 72,217 SY | $1.50 | $2.80 | $3.00 | 10% |
| 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN | 2,000 SY | $37.50 | $31.00 | $35.00 | 7% |
| 254E01600 PATCHING PLANED SURFACE | 14,443 SY | $3.00 | $2.75 | $3.30 | 4% |
| 644E00104 EDGE LINE, 6" | 10.04 MILE | $4,156 | $3,393 | $3,393 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $35,000 | $80,000 | $70,000 | 3% |
| 644E00300 CENTER LINE | 5.02 MILE | $5,040 | $4,295 | $4,295 | 2% |
| 617E10100 COMPACTED AGGREGATE | 196 CY | $100 | $93.75 | $100 | 2% |
| 407E20000 NON-TRACKING TACK COAT | 6,500 GAL | $3.00 | $3.90 | $3.50 | 2% |
| 621E00100 RPM | 441 EACH | $44.04 | $32.50 | $32.50 | 2% |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 20.08 MILE | $714 | $875 | $610 | 1% |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 10.04 MILE | $1,006 | $1,055 | $825 | 1% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $50,000 | $34,500 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $7,500 | $5,000 | $4,013 | 1% |
| 209E60500 LINEAR GRADING | 1 MILE | $7,000 | $1,675 | $8,500 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,500 | $3,500 | $5,000 | 1% |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 441 EACH | $10.00 | $21.00 | $15.00 | 0% |
| 614E12460 WORK ZONE MARKING SIGN | 14 EACH | $150 | $100 | $135 | 0% |
| 644E01510 DOTTED LINE, 6" | 758 FT | $1.31 | $1.10 | $1.10 | 0% |
| 616E10000 WATER | 3 MGAL | $10.00 | $1.00 | $15.00 | 0% |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 3,009 CY | $196 | $590k | 57% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE,1.5" | 72,217 SY | $1.5 | $108k | 10% |
| 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN | 2,000 SY | $37.5 | $75k | 7% |
| 254E01600 PATCHING PLANED SURFACE | 14,443 SY | $3 | $43k | 4% |
| 644E00104 EDGE LINE, 6" | 10.04 MILE | $4,156 | $42k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $35,000 | $35k | 3% |
| 644E00300 CENTER LINE | 5.02 MILE | $5,040 | $25k | 2% |
| 617E10100 COMPACTED AGGREGATE | 196 CY | $100 | $20k | 2% |
| 407E20000 NON-TRACKING TACK COAT | 6,500 GAL | $3 | $20k | 2% |
| 621E00100 RPM | 441 EACH | $44.04 | $19k | 2% |