Figure 0.1 · BRIEFING BID #250234 · ODOT RESULT · awarded Apr 24 D07-PPM FY25 D07 County · est $1.4M
Bid date Thursday, April 24 —
Project scope Bid form · ODOT
25 ITEMS Pavement Marking 60% Maintaining Traffic 16% Mobilization & General 8% Other 16% Top items by winning bid Item Qty Unit price Extended % 643E00204 LANE LINE, 6" 396.97 MILE $565 $224k 21% 643E00500 STOP LINE 20,966 FT $6 $126k 12% 643E00404
Item Quantity R1 The Aero-mark Company LLC R2 Oglesby Construction INC % of bid 643E00204 LANE LINE, 6" 396.97 MILE $565 $510 21% 643E00500 STOP LINE 20,966 FT $6.00 $4.50 12% 643E00404 CHANNELIZING LINE, 12" 185,373 FT $0.60 $0.90 10% 643E00700 TRANSVERSE/DIAGONAL LINE 34,813 FT $3.00 $4.00 10% 643E01510 DOTTED LINE, 6" 131,586 FT $0.70 $0.80 9% 643E01300 LANE ARROW 1,288 EACH $70.00 $65.00 8% 643E00620 CROSSWALK LINE, 12" 19,414 FT $3.00 $3.00 5% 643E01310 WRONG WAY ARROW 175 EACH $300 $275 5% 643E40000 SPEED MEASUREMENT MARKING 269 EACH $150 $140 4% 643E00400 CHANNELIZING LINE, 8" 70,058 FT $0.50 $0.70 3% 614E11001 MAINTAINING TRAFFIC, AS PER PLAN 1 LS $26,000 $34,846 2% 643E01550 DOTTED LINE, 12" 33,099 FT $0.70 $1.00 2% 642E50000 PAVEMENT MARKING, MISC.:BLACK SHADOW LANE LINE 23.68 MILE $775 $740 2% 643E01000 RAILROAD SYMBOL MARKING 43 EACH $380 $500 2% 643E01110 SCHOOL SYMBOL MARKING, 96" 37 EACH $380 $400 1% 624E10000 MOBILIZATION 1 LS $10,000 $40,000 1% 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM 1 LS $9,251 $6,000 1% 643E50100 PAVEMENT MARKING, MISC.:LANE REDUCTION ARROW 21 EACH $375 $185 1% 643E01410 WORD ON PAVEMENT, 96" 63 EACH $76.00 $115 0% 643E01500 DOTTED LINE, 4" 4,310 FT $0.70 $0.80 0%
Show all 25 line items Item Quantity R1 The Aero-mark Company LLC R2 Oglesby Construction INC 643E01602 BIKE LANE SYMBOL MARKING 20 EACH $150 $180 643E20802 YIELD LINE 169 FT $10.00 $12.00 643E50100 PAVEMENT MARKING, MISC.:"MERGE" 6 EACH $375 $100 643E50100 PAVEMENT MARKING, MISC.:"XING" 2 EACH $375 $80.00 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST 24 HOUR $55.00 $55.00
Project details
Description D07-PPM FY25
Type of work Pavement How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →