SUM-SR 241-01.50/VAR
SUM County · est $2.9M
Bid dateThursday, May 15—
SUM County · est $2.9M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 78 more items below.
| Item | Quantity | R1Karvo Companies INC | R2Shelly & Sands INC | R3Kenmore Construction CO INC | R4Shelly Company | % of bid |
|---|---|---|---|---|---|---|
| 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 5,280 CY | $220 | $225 | $248 | $210 | 49% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T=1.5") | 118,689 SY | $1.79 | $1.45 | $2.55 | $2.10 | 9% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $175,000 | $137,982 | $115,000 | $615,000 | 7% |
| 624E10000 MOBILIZATION | 1 LS | $134,000 | $100,000 | $100,000 | $100,000 | 6% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (465 CY | $175 | $160 | $240 | $160 | 3% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 2,000 SY | $40.00 | $45.00 |
| Item | Quantity | R1Karvo Companies INC | R2Shelly & Sands INC | R3Kenmore Construction CO INC | R4Shelly Company |
|---|---|---|---|---|---|
| 202E23500 WEARING COURSE REMOVED | 540 SY | $0.75 | $6.00 | $17.00 | $20.00 |
| 202E32000 CURB REMOVED | 32 FT | $35.00 | $13.50 | $10.00 | $24.50 |
| 202E32500 CURB AND GUTTER REMOVED | 428 FT | $35.00 | $23.50 | $10.00 | $33.75 |
| 202E98100 REMOVAL MISC.: BARRIER REFLECTOR | 12 EACH | $25.00 | $21.00 | $10.00 | $5.00 |
| 203E10000 EXCAVATION (FOR PAVEMENT REPAIR) |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $48.00 |
| $65.00 |
| 3% |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 35 EACH | $2,000 | $1,850 | $2,200 | $1,850 | 3% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 6 EACH | $10,350 | $10,350 | $8,500 | $8,500 | 3% |
| 202E30000 WALK REMOVED | 6,702 SF | $8.00 | $3.00 | $2.50 | $5.00 | 2% |
| 608E52000 CURB RAMP | 3,189 SF | $14.00 | $26.00 | $20.00 | $23.50 | 2% |
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 4 EACH | $10,750 | $10,750 | $9,000 | $9,000 | 2% |
| AA2 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN (ALTERNATE | 4 EACH | $10,500 | $10,500 | $8,800 | $8,500 | 2% |
| 407E20000 NON-TRACKING TACK COAT | 12,165 GAL | $2.70 | $3.05 | $4.50 | $3.00 | 1% |
| 253E01000 PAVEMENT REPAIR | 426 SY | $70.00 | $180 | $160 | $140 | 1% |
| 608E10000 4" CONCRETE WALK | 3,528 SF | $8.00 | $10.25 | $10.00 | $21.50 | 1% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T=3") | 9,546 SY | $2.82 | $1.90 | $4.50 | $3.00 | 1% |
| 623E39501 MONUMENT ASSEMBLY ADJUSTED TO GRADE, AS PER PLAN | 14 EACH | $1,600 | $1,750 | $1,700 | $1,750 | 1% |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 382 FT | $55.00 | $62.50 | $65.00 | $141 | 1% |
| 638E10801 VALVE BOX ADJUSTED TO GRADE, AS PER PLAN | 10 EACH | $2,000 | $2,000 | $1,900 | $2,000 | 1% |
| 646E10521 CROSSWALK LINE, 24", AS PER PLAN | 1,556 FT | $12.00 | $12.00 | $12.00 | $12.00 | 1% |
| 24 CY |
| $10.00 |
| $150 |
| $50.00 |
| $25.00 |
| 209E60200 LINEAR GRADING | 163 STA | $65.00 | $55.00 | $110 | $70.00 |
| 608E52001 CURB RAMP, AS PER PLAN(T = 8?) | 121 SF | $14.00 | $68.50 | $22.00 | $85.50 |
| 690E91000 SPECIAL - AS-BUILT CONSTRUCTION PLANS | 1 LS | $624 | $2,000 | $5,000 | $5,500 |
| 690E98000 SPECIAL - VERTICAL CLEARANCE | 2 EACH | $640 | $1,100 | $1,500 | $640 |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E98631 CATCH BASIN ADJUSTED TO GRADE, AS PER PLAN | 8 EACH | $1,800 | $2,500 | $800 | $2,500 |
| 611E99660 MANHOLE RECONSTRUCTED TO GRADE | 1 EACH | $2,500 | $3,500 | $950 | $3,500 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 2,000 LB | $3.00 | $5.00 | $3.00 | $5.00 |
| 304E20000 AGGREGATE BASE (FOR PAVEMENT REPAIR) | 24 CY | $25.00 | $100 | $50.00 | $40.00 |
| 408E10001 PRIME COAT, AS PER PLAN | 3,475 GAL | $4.50 | $3.50 | $6.00 | $4.00 |
| 441E70500 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449) | — | $220 | $1,200 | $650 | $850 |
| 609E26000 CURB, TYPE 6 | 32 FT | $45.00 | $56.25 | $50.00 | $100 |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 243 CY | $75.00 | $150 | $72.00 | $75.00 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 1 EACH | $100 | $320 | $550 | $2,500 |
| 621E00100 RPM | 324 EACH | $39.00 | $47.50 | $50.00 | $47.50 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 261 EACH | $1.00 | $5.00 | $5.00 | $3.75 |
| 626E00102 BARRIER REFLECTOR, TYPE 1, 1WAY | 14 EACH | $18.00 | $18.00 | $15.00 | $15.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, 1WAY | 43 EACH | $20.00 | $20.00 | $18.00 | $13.50 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 147 FT | $10.00 | $10.00 | $10.00 | $10.00 |
| 630E80100 SIGN, FLAT SHEET | 43.5 SF | $23.00 | $23.00 | $23.00 | $23.00 |
| 630E80100 SIGN, FLAT SHEET, 730.20 | 7 SF | $23.00 | $23.00 | $23.00 | $23.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 21 EACH | $25.00 | $25.00 | $25.00 | $25.00 |
| 630E85000 REMOVAL OF GROUND MOUNTED SIGN AND STORAGE | 2 EACH | $25.00 | $25.00 | $25.00 | $25.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 14 EACH | $25.00 | $25.00 | $25.00 | $25.00 |
| 646E10000 EDGE LINE, 4" | 6.1 MILE | $1,800 | $1,800 | $1,800 | $1,800 |
| 646E10010 EDGE LINE, 6" | 1.62 MILE | $3,000 | $3,000 | $3,000 | $3,000 |
| 646E10110 LANE LINE, 6" | 0.93 MILE | $1,500 | $1,500 | $1,500 | $1,500 |
| 646E10200 CENTER LINE | 4.03 MILE | $4,100 | $4,100 | $4,100 | $4,100 |
| 646E10300 CHANNELIZING LINE, 8" | 1,775 FT | $1.35 | $1.35 | $1.35 | $1.35 |
| 646E10310 CHANNELIZING LINE, 12" | 5,289 FT | $1.50 | $1.50 | $1.50 | $1.50 |
| 646E10400 STOP LINE | 490 FT | $12.00 | $12.00 | $12.00 | $12.00 |
| 646E10520 CROSSWALK LINE, 24" | 544 FT | $12.00 | $12.00 | $12.00 | $12.00 |
| 646E10600 TRANSVERSE/DIAGONAL LINE | 1,286 FT | $9.00 | $9.00 | $9.00 | $9.00 |
| 646E10800 ISLAND MARKING | 264 SF | $10.00 | $10.00 | $10.00 | $10.00 |
| 646E20100 SCHOOL SYMBOL MARKING, 72" | 2 EACH | $350 | $350 | $350 | $350 |
| 646E20300 LANE ARROW | 104 EACH | $125 | $125 | $125 | $125 |
| 646E20504 DOTTED LINE, 6" | 1,325 FT | $1.00 | $1.00 | $1.00 | $1.00 |
| 646E20800 YIELD LINE | 90 FT | $15.00 | $15.00 | $15.00 | $15.00 |
| 625E25400 CONDUIT, 2", 725.04 | 30 FT | $25.00 | $25.00 | $100 | $100 |
| 625E25500 CONDUIT, 3", 725.04 | 57 FT | $38.50 | $38.50 | $125 | $125 |
| 625E29000 TRENCH | 85 FT | $18.00 | $18.00 | $60.00 | $60.00 |
| 625E30700 PULL BOX, 725.08, 18" | 1 EACH | $1,350 | $1,350 | $3,000 | $3,000 |
| 625E31511 PULL BOX REMOVED, AS PER PLAN | 1 EACH | $675 | $675 | $7,500 | $7,500 |
| 625E31600 PULL BOX, MISC.: ADJUSTED TO GRADE | 2 EACH | $450 | $450 | $2,500 | $2,500 |
| 625E32000 GROUND ROD | 2 EACH | $300 | $300 | $300 | $300 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 85 FT | $3.00 | $3.00 | $2.00 | $2.00 |
| 632E20731 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN, | 2 EACH | $1,300 | $1,300 | $1,500 | $1,500 |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 671 FT | $4.50 | $4.50 | $5.00 | $5.00 |
| 632E64020 PEDESTAL FOUNDATION | 2 EACH | $1,750 | $1,750 | $2,500 | $2,500 |
| 632E89900 PEDESTAL, 8', TRANSFORMER BASE | 2 EACH | $850 | $850 | $2,000 | $2,000 |
| 632E90202 REUSE OF PEDESTRIAN SIGNAL HEAD | 1 EACH | $750 | $750 | $1,500 | $1,500 |
| 632E90211 REUSE OF PEDESTRIAN PUSHBUTTON, AS PER PLAN | 2 EACH | $393 | $393 | $1,000 | $1,000 |
| 633E99000 CONTROLLER ITEM, MISC.: CONTROLLER MODIFICATION | 1 EACH | $2,090 | $2,090 | $1,500 | $1,500 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 100 HOUR | $100 | $95.00 | $100 | $100 |
| 614E12460 WORK ZONE MARKING SIGN | 6 EACH | $75.00 | $75.00 | $75.00 | $75.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $250 | $400 | $300 | $325 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 8 SNMT | $900 | $900 | $1,100 | $900 |
| 614E20010 WORK ZONE LANE LINE, CLASS I, 6" | 1.27 MILE | $400 | $400 | $400 | $400 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 1.27 MILE | $400 | $400 | $400 | $400 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 4.18 MILE | $900 | $900 | $900 | $900 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 4.18 MILE | $900 | $900 | $900 | $900 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 3.4 MILE | $525 | $525 | $525 | $525 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 5,289 FT | $0.50 | $0.50 | $0.50 | $0.50 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 557 FT | $3.25 | $3.25 | $3.25 | $3.25 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 467 FT | $3.25 | $3.25 | $3.25 | $3.25 |
| 614E22350 WORK ZONE EDGE LINE, CLASS III, 4", 642 PAINT | 4.32 MILE | $525 | $525 | $525 | $525 |
| 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, 8" | 1,775 FT | $0.35 | $0.35 | $0.35 | $0.35 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 1,775 FT | $0.35 | $0.35 | $0.35 | $0.35 |
| 614E23010 WORK ZONE CHANNELIZING LINE, CLASS I, 12" | 5,289 FT | $0.50 | $0.50 | $0.50 | $0.50 |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $3,500 | $5,000 | $15,000 | $10,000 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $13,726 | $5,500 | $25,000 | $35,000 |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $2,500 | $3,500 | $3,500 | $3,500 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $7,500 | $4,400 | $5,000 | $20,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 5,280 CY | $220 | $1.16M | 44% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T=1.5") | 118,689 SY | $1.79 | $212k | 8% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $175,000 | $175k | 7% |
| 624E10000 MOBILIZATION | 1 LS | $134,000 | $134k | 5% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (465 CY | $175 | $81k | 3% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 2,000 SY | $40 | $80k | 3% |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 35 EACH | $2,000 | $70k | 3% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 6 EACH | $10,350 | $62k | 2% |
| 202E30000 WALK REMOVED | 6,702 SF | $8 | $54k | 2% |
| 608E52000 CURB RAMP | 3,189 SF | $14 | $45k | 2% |