How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
$120,318
646E10200CENTER LINE
0.02 MILE
$65,800
$160,424
614E26610WORK ZONE STOP LINE, CLASS III, 642 PAINT
54 FT
$9.50
$9.50
100E00300PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY
1 LS
$2,000
$5,500
103E05000PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM
1 LS
$2,000
$12,000
19%
Top items by winning bid
Item
Qty
Unit price
Extended
%
441E50101ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS
5,249 CY
$190
$997k
53%
254E01000PAVEMENT PLANING, ASPHALT CONCRETE, 1.5"
125,787 SY
$2.1
$264k
14%
251E01001PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN
4,500 SY
$30
$135k
7%
614E11000MAINTAINING TRAFFIC
1 LS
$83,300
$83k
4%
254E01600PATCHING PLANED SURFACE
25,199 SY
$3.15
$79k
4%
644E00104EDGE LINE, 6"
19.02 MILE
$3,438
$65k
3%
644E00300CENTER LINE
9.51 MILE
$4,260
$41k
2%
407E20000NON-TRACKING TACK COAT
11,320 GAL
$3.5
$40k
2%
614E22360WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT