PIK-SR 124-14.96
PIK County · est $2.8M
Bid dateThursday, May 22—
PIK County · est $2.8M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 65 more items below.
| Item | Quantity | R1Allard Excavation LLC | R2Fillmore Construction | R3Shelly & Sands INC | R4Axis Civil Construction LLC | % of bid |
|---|---|---|---|---|---|---|
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 1,615 CY | $177 | $192 | $160 | $177 | 18% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $250,000 | $70,000 | $250,004 | $140,000 | 15% |
| 611E94800 8' X 4' CONDUIT, TYPE A, 706.05 | 86 FT | $1,700 | $1,800 | $1,478 | $1,450 | 9% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 531 CY | $215 | $224 | $205 | $215 | 7% |
| 624E10000 MOBILIZATION | 1 LS | $90,000 | $75,000 | $130,000 | $80,000 | 6% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $88,500 | $10,000 | $635,425 | $750,000 |
| Item | Quantity | R1Allard Excavation LLC | R2Fillmore Construction | R3Shelly & Sands INC | R4Axis Civil Construction LLC |
|---|---|---|---|---|---|
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 156 FT | $10.00 | $10.00 | $28.00 | $25.00 |
| 202E38000 GUARDRAIL REMOVED | 341 FT | $4.00 | $3.50 | $3.50 | $5.00 |
| 202E75000 FENCE REMOVED | 183 FT | $2.00 | $10.00 | $5.00 | $5.00 |
| 204E10000 SUBGRADE COMPACTION | 7,157 SY | $3.00 | $3.00 | $2.50 | $3.00 |
| 204E30010 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 5% |
| 204E20000 EMBANKMENT | 6,331 CY | $13.00 | $30.00 | $25.50 | $55.00 | 5% |
| 304E20000 AGGREGATE BASE | 1,205 CY | $61.00 | $68.00 | $73.00 | $64.00 | 5% |
| 203E20000 EMBANKMENT | 3,679 CY | $17.00 | $50.00 | $19.00 | $32.00 | 4% |
| 204E13000 EXCAVATION OF SUBGRADE | 3,644 CY | $14.00 | $20.00 | $30.00 | $32.00 | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $50,000 | $10,000 | $50,000 | $25,000 | 3% |
| 832E30000 EROSION CONTROL | 49,521 EACH | $1.00 | $1.00 | $1.00 | $1.00 | 3% |
| 622E41110 PORTABLE BARRIER, ANCHORED | 1,630 FT | $27.00 | $26.72 | $41.00 | $27.00 | 3% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 1,790 FT | $23.00 | $22.35 | $6.00 | $22.50 | 3% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 23 CY | $1,664 | $1,000 | $1,500 | $670 | 2% |
| 203E10000 EXCAVATION | 1,881 CY | $20.00 | $30.00 | $17.00 | $32.00 | 2% |
| 659E00300 TOPSOIL | 1,299 CY | $28.00 | $30.00 | $20.00 | $52.00 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $30,000 | $10,000 | $60,000 | $20,000 | 2% |
| 611E20700 48" CONDUIT, TYPE A (SEE SHEET FOR ALLOW | 86 FT | $323 | $500 | $405 | $265 | 2% |
| 202E23000 PAVEMENT REMOVED | 4,434 SY | $6.00 | $5.00 | $6.50 | $13.00 | 2% |
| 100 CY |
| $83.00 |
| $120 |
| $73.00 |
| $84.00 |
| 204E45000 PROOF ROLLING | 4 HOUR | $263 | $125 | $271 | $200 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 50 FT | $83.00 | $75.00 | $75.00 | $75.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 1 EACH | $2,400 | $2,850 | $2,850 | $2,850 |
| 623E38500 MONUMENT ASSEMBLY, TYPE C | 7 EACH | $1,758 | $3,500 | $2,113 | $2,400 |
| 623E40520 RIGHT-OF-WAY MONUMENT, TYPE B | 18 EACH | $669 | $1,500 | $198 | $650 |
| 690E50350 SPECIAL - MAILBOX REMOVED AND RESET | 1 EACH | $120 | $200 | $200 | $200 |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 44 CY | $87.00 | $200 | $112 | $80.00 |
| 659E10000 SEEDING AND MULCHING | 9,575 SY | $0.85 | $1.00 | $1.00 | $0.85 |
| 659E20000 COMMERCIAL FERTILIZER | 1.29 TON | $1,250 | $1,400 | $1,250 | $1,250 |
| 659E31000 LIME | 1.98 ACRE | $120 | $450 | $150 | $150 |
| 659E35000 WATER | 52 MGAL | $1.00 | $10.00 | $1.00 | $1.00 |
| 670E00500 SLOPE EROSION PROTECTION | 2,121 SY | $2.00 | $2.00 | $2.00 | $2.00 |
| 671E14000 EROSION CONTROL MAT | 283 SY | $3.00 | $2.00 | $2.50 | $2.50 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $3,011 | $5,000 | $2,750 | $2,500 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $9,828 | $10,000 | $7,000 | $17,500 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $9,755 | $10,000 | $9,000 | $8,000 |
| 503E21100 UNCLASSIFIED EXCAVATION | 117 CY | $38.00 | $140 | $51.00 | $75.00 |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 3,103 LB | $3.00 | $2.50 | $4.00 | $4.00 |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 8 CY | $2,491 | $1,500 | $5,600 | $2,750 |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 1 CY | $1,204 | $2,000 | $3,025 | $1,700 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 30 SY | $40.00 | $80.00 | $86.00 | $75.00 |
| 512E33000 TYPE 2 WATERPROOFING | 199 SY | $60.00 | $30.00 | $28.00 | $25.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 26 SF | $3.00 | $10.00 | $2.00 | $10.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 6 CY | $142 | $140 | $450 | $280 |
| 602E20000 CONCRETE MASONRY | 3.1 CY | $3,279 | $2,000 | $2,700 | $3,400 |
| 605E31100 AGGREGATE DRAINS | 549 FT | $23.00 | $10.00 | $14.00 | $20.00 |
| 611E01400 6" CONDUIT, TYPE E | 50 FT | $54.00 | $50.00 | $23.00 | $20.00 |
| 611E01500 6" CONDUIT, TYPE F | 50 FT | $54.00 | $60.00 | $23.00 | $20.00 |
| 611E04900 12" CONDUIT, TYPE D | 30 FT | $99.00 | $80.00 | $90.00 | $50.00 |
| 611E07900 18" CONDUIT, TYPE D (SEE SHEET FOR ALLOW | 59 FT | $110 | $140 | $79.00 | $50.00 |
| 611E10600 24" CONDUIT, TYPE C (SEE SHEET FOR ALLOW | 60 FT | $124 | $200 | $151 | $75.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.5") | 255 SY | $30.00 | $10.00 | $29.50 | $30.00 |
| 407E10000 TACK COAT | 1,132 GAL | $2.50 | $3.00 | $3.50 | $2.50 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 25 CY | $56.00 | $100 | $120 | $85.00 |
| 410E13000 TRAFFIC COMPACTED SURFACE, TYPE C | 15 CY | $57.00 | $120 | $125 | $85.00 |
| 621E00100 RPM | 19 EACH | $200 | $200 | $200 | $200 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 19 EACH | $12.00 | $10.00 | $14.00 | $40.00 |
| 626E00112 BARRIER REFLECTOR, TYPE 3 (BI-DIRECTIONAL) | 2 EACH | $15.00 | $15.00 | $15.00 | $15.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 8.5 FT | $14.00 | $25.00 | $25.00 | $25.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 12 FT | $15.00 | $28.00 | $28.00 | $28.00 |
| 630E80100 SIGN, FLAT SHEET | 10 SF | $30.00 | $30.00 | $30.00 | $30.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 10 EACH | $30.00 | $25.00 | $25.00 | $25.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $60.00 | $175 | $175 | $175 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 10 EACH | $30.00 | $25.00 | $25.00 | $25.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.6 MILE | $1,975 | $1,975 | $1,975 | $1,975 |
| 642E00300 CENTER LINE, TYPE 1 | 0.29 MILE | $3,525 | $3,525 | $3,525 | $3,525 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 16 HOUR | $85.00 | $100 | $120 | $70.00 |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,008 | $2,008 | $2,400 | $2,100 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (BI-DIRECTIONAL) | 73 EACH | $30.00 | $30.00 | $9.00 | $12.00 |
| 614E13314 BARRIER REFLECTOR, TYPE 3 (BI-DIRECTIONAL) | 5 EACH | $50.00 | $50.00 | $25.00 | $18.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 78 EACH | $32.00 | $32.00 | $18.00 | $18.00 |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 1.36 MILE | $10,125 | $10,125 | $10,125 | $10,125 |
| 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I | 24 FT | $14.00 | $14.00 | $14.00 | $14.00 |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $6,853 | $5,000 | $10,000 | $2,500 |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 145 SY | $147 | $165 | $125 | $100 |
| 616E10000 WATER | 52 MGAL | $1.00 | $10.00 | $45.00 | $1.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $14,000 | $25,000 | $20,000 | $20,000 |
| 619E16000 FIELD OFFICE, TYPE A | 5 MNTH | $1,800 | $1,100 | $5,500 | $1,950 |
| 623E50000 PRECONSTRUCTION SURVEY MONUMENT VERIFICATION AND R | 1 LS | $3,372 | $10,000 | $3,000 | $1,600 |
| 623E51000 POST CONSTRUCTION SURVEY MONUMENT VERIFICATION AND | 1 LS | $3,011 | $10,000 | $3,000 | $1,600 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 1,615 CY | $177 | $286k | 15% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $250,000 | $250k | 13% |
| 611E94800 8' X 4' CONDUIT, TYPE A, 706.05 | 86 FT | $1,700 | $146k | 8% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 531 CY | $215 | $114k | 6% |
| 624E10000 MOBILIZATION | 1 LS | $90,000 | $90k | 5% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $88,500 | $89k | 5% |
| 204E20000 EMBANKMENT | 6,331 CY | $13 | $82k | 4% |
| 304E20000 AGGREGATE BASE | 1,205 CY | $61 | $74k | 4% |
| 203E20000 EMBANKMENT | 3,679 CY | $17 | $63k | 3% |
| 204E13000 EXCAVATION OF SUBGRADE | 3,644 CY | $14 | $51k | 3% |