ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 58 more items below.
| Item | Quantity | R1Eclipse CO LLC | R2Adena Corporation | % of bid |
|---|---|---|---|---|
| 624E10000 MOBILIZATION | 1 LS | $55,129 | $14,516 | 15% |
| 611E23600 60" CONDUIT, TYPE A, 706.02, 707.33, 707.02 (0.168 | 85 FT | $357 | $854 | 8% |
| 203E20000 EMBANKMENT | 786 CY | $33.50 | $8.32 | 7% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) (9.0") | 73 CY | $345 | $330 | 7% |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 217 SY | $110 | $120 | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $20,665 | $25,724 | 6% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $18,086 | $14,714 | 5% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 490 FT | $36.00 | $77.05 | 5% |
| 442E22001 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 44 CY | $400 | $655 | 5% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016 | 7 EACH | $2,475 | $2,885 | 5% |
| 659E00300 TOPSOIL | 272 CY | $60.50 | $22.89 | 4% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $16,116 | $14,714 | 4% |
| 611E97200 CONDUIT, MISC.: INTERNAL JOINT SEAL | 7 EACH | $2,125 | $6,864 | 4% |
| 202E11001 STRUCTURE REMOVED, AS PER PLAN | 1 LS | $14,428 | $22,136 | 4% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 562.5 FT | $19.50 | $22.84 | 3% |
| 203E10000 EXCAVATION | 529 CY | $20.50 | $8.24 | 3% |
| 611E10200 24" CONDUIT, TYPE A, 706.02 | 22 FT | $477 | $438 | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $10,453 | $11,625 | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $9,872 | $9,441 | 3% |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,202 | $2,886 | 2% |
| Item | Quantity | R1Eclipse CO LLC | R2Adena Corporation |
|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 297 SY | $17.00 | $13.23 |
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 110 FT | $20.50 | $1.65 |
| 202E38000 GUARDRAIL REMOVED | 400 FT | $4.00 | $5.45 |
| 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A | 3 EACH | $208 | $90.91 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 1 EACH | $235 | $90.91 |
| 202E70110 SPECIAL - PIPE CLEANOUT, 24" AND UNDER | 56 FT | $30.00 | $65.02 |
| 202E75000 FENCE REMOVED | 105 FT | $7.50 | $1.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 202E98000 REMOVAL MISC.: CONCRETE PAD | 1 LS | $482 | $380 |
| 202E98100 REMOVAL MISC.: BOULDER | 4 EACH | $97.50 | $45.45 |
| 204E10000 SUBGRADE COMPACTION | 310 SY | $3.00 | $4.69 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T, MASH 2016 | 1 EACH | $1,350 | $1,574 |
| 607E98000 FENCE, MISC.: TEMPORARY FENCING | 112 FT | $52.50 | $3.00 |
| 623E38500 MONUMENT ASSEMBLY, TYPE C | 4 EACH | $1,014 | $1,922 |
| 623E50000 PRECONSTRUCTION SURVEY MONUMENT VERIFICATION AND R | 1 LS | $1,000 | $1,574 |
| 623E51000 POST CONSTRUCTION SURVEY MONUMENT VERIFICATION AND | 1 LS | $1,000 | $1,574 |
| 690E50200 SPECIAL - MAILBOX SUPPORT SYSTEM, DOUBLE | 1 EACH | $445 | $286 |
| 601E11000 RIPRAP, TYPE D | 15.2 SY | $201 | $421 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 32 SY | $95.50 | $73.28 |
| 601E32000 ROCK CHANNEL PROTECTION, TYPE A WITH FILTER | 21 CY | $220 | $195 |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 4 CY | $137 | $183 |
| 654E11000 COMMERCIAL FERTILIZER | 0.34 TON | $892 | $1,200 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $125 | $100 |
| 659E10000 SEEDING AND MULCHING | 2,453 SY | $2.50 | $2.43 |
| 659E14000 REPAIR SEEDING AND MULCHING | 123 SY | $1.00 | $1.00 |
| 659E15000 INTER-SEEDING | 123 SY | $1.00 | $1.00 |
| 659E31000 LIME | 0.51 ACRE | $156 | $411 |
| 659E35000 WATER | 13.58 MGAL | $1.00 | $1.00 |
| 670E00530 SLOPE EROSION PROTECTION MAT, TYPE C | 1,671 SY | $2.00 | $1.85 |
| 832E30000 EROSION CONTROL | 500 EACH | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 40 FT | $39.00 | $9.26 |
| 611E04900 12" CONDUIT, TYPE D | 45 FT | $70.50 | $49.16 |
| 611E07600 18" CONDUIT, TYPE C | 95 FT | $88.00 | $67.24 |
| 611E97400 CONDUIT, MISC.: VIDEO LOG | 56 FT | $10.00 | $23.47 |
| 611E98300 CATCH BASIN, NO. 5 | 1 EACH | $5,203 | $4,355 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (3.0") | 230 SY | $32.00 | $36.71 |
| 304E20000 AGGREGATE BASE (3.0") | 35 CY | $118 | $153 |
| 304E20000 AGGREGATE BASE (6.0") | 51 CY | $119 | $155 |
| 304E20000 AGGREGATE BASE (8.0") | 16 CY | $119 | $206 |
| 407E10000 TACK COAT | 76 GAL | $3.00 | $6.41 |
| 408E10001 PRIME COAT, AS PER PLAN (0.4 GAL/SY) | 140 GAL | $5.00 | $19.81 |
| 614E13312 BARRIER REFLECTOR, TYPE 2 (BI-DIRECTIONAL) | 6 EACH | $12.50 | $23.31 |
| 621E00100 RPM | 6 EACH | $720 | $752 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 6 EACH | $20.50 | $10.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.29 MILE | $11,220 | $7,601 |
| 642E00300 CENTER LINE, TYPE 1 | 0.15 MILE | $14,960 | $13,981 |
| 614E12420 DETOUR SIGNING | 1 LS | $8,570 | $5,448 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (BI-DIRECTIONAL) | 20 EACH | $12.00 | $23.31 |
| 614E13360 OBJECT MARKER, TWO WAY | 20 EACH | $21.00 | $29.13 |
| 614E18600 PORTABLE CHANGEABLE MESSAGE SIGN | 4 SNMT | $1,142 | $1,518 |
| 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I (BL | 0.2 MILE | $25,658 | $36,377 |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I ( | 0.2 MILE | $12,829 | $21,042 |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I ( | 0.35 MILE | $10,793 | $11,010 |
| 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I | 40 FT | $7.00 | $19.11 |
| 602E20000 CONCRETE MASONRY | 4.57 CY | $1,679 | $2,067 |
| 202E11001 STRUCTURE REMOVED, AS PER PLAN | 1 LS | $1,679 | $14,570 |
| 602E20000 CONCRETE MASONRY | 1.81 CY | $1,907 | $1,891 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $7,402 | $4,721 |
| 619E16000 FIELD OFFICE, TYPE A | 4 MNTH | $700 | $500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 624E10000 MOBILIZATION | 1 LS | $55,129 | $55k | 11% |
| 611E23600 60" CONDUIT, TYPE A, 706.02, 707.33, 707.02 (0.168 | 85 FT | $357 | $30k | 6% |
| 203E20000 EMBANKMENT | 786 CY | $33.5 | $26k | 5% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) (9.0") | 73 CY | $345 | $25k | 5% |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 217 SY | $110 | $24k | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $20,665 | $21k | 4% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $18,086 | $18k | 3% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 490 FT | $36 | $18k | 3% |
| 442E22001 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 44 CY | $400 | $18k | 3% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016 | 7 EACH | $2,475 | $17k | 3% |