252E01001FULL DEPTH RIGID PAVEMENT REMOVAL AND FLEXIBLE REP
2,120 SY
$363
$669
77%
614E11000MAINTAINING TRAFFIC
1 LS
$109,548
$300,000
11%
624E10000MOBILIZATION
1 LS
$40,000
$40,000
4%
614E11110LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST
200 HOUR
$144
$99.00
3%
252E01500FULL DEPTH PAVEMENT SAWING
9,600 FT
$2.52
$5.00
2%
614E18601PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN
6 SNMT
$1,107
$1,000
1%
623E10001CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P
1 LS
$5,387
$9,000
1%
103E05000PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM
1 LS
$4,395
$15,000
0%
621E00100RPM
10 EACH
$294
$300
0%
642E00104EDGE LINE, 6", TYPE 1
0.3 MILE
$6,940
$7,000
0%
832E30000EROSION CONTROL
1,000 EACH
$1.00
$1.00
0%
642E00204LANE LINE, 6", TYPE 1
0.15 MILE
$2,365
$2,400
0%
621E54000RAISED PAVEMENT MARKER REMOVED
10 EACH
$24.84
$5.00
0%
642E00404CHANNELIZING LINE, 12", TYPE 1
10 FT
$9.00
$11.00
0%
Project details
Description
HAM-US 52-35.22
Type of work
Pavement
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
2,120 SY
$362.81
$769k
77%
614E11000MAINTAINING TRAFFIC
1 LS
$109,548
$110k
11%
624E10000MOBILIZATION
1 LS
$40,000
$40k
4%
614E11110LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST
200 HOUR
$143.65
$29k
3%
252E01500FULL DEPTH PAVEMENT SAWING
9,600 FT
$2.52
$24k
2%
614E18601PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN
6 SNMT
$1,107
$7k
1%
623E10001CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P
1 LS
$5,387
$5k
1%
103E05000PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM