MOT-Shiloh Springs Rd. RSF
MOT County
Bid dateThursday, July 17—
MOT County
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 14items by winning bid’s extended amount.
| Item | Quantity | R1Walls Bros Asphalt CO INC | R2Barrett Paving Materials INC | % of bid |
|---|---|---|---|---|
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 1,009 CY | $227 | $290 | 67% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" | 24,208 SY | $2.30 | $3.00 | 16% |
| 644E00100 EDGE LINE, 4" | 3.78 MILE | $2,751 | $2,840 | 3% |
| 407E20000 NON-TRACKING TACK COAT | 2,058 GAL | $5.00 | $3.50 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $8,500 | $53,130 | 2% |
| 644E00300 CENTER LINE | 1.9 MILE | $4,379 | $3,435 | 2% |
| 614E22350 WORK ZONE EDGE LINE, CLASS III, 4", 642 PAINT | 7.6 MILE | $769 | $475 | 2% |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 3.8 MILE | $1,280 | $580 | 1% |
| 409E30000 SAWING AND SEALING ASPHALT CONCRETE PAVEMENT JOINT | 42 FT | $65.00 | $165 | 1% |
| 254E01600 PATCHING PLANED SURFACE | 219 SY | $12.00 | $20.00 | 1% |
| 624E10000 MOBILIZATION | 1 LS | $2,000 | $20,000 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $1,584 | $8,447 | 0% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1,150 | $6,000 | 0% |
| 614E12460 WORK ZONE MARKING SIGN | 4 EACH | $125 | $100 | 0% |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 1,009 CY | $227 | $229k | 67% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" | 24,208 SY | $2.3 | $56k | 16% |
| 644E00100 EDGE LINE, 4" | 3.78 MILE | $2,751 | $10k | 3% |
| 407E20000 NON-TRACKING TACK COAT | 2,058 GAL | $5 | $10k | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $8,500 | $9k | 2% |
| 644E00300 CENTER LINE | 1.9 MILE | $4,379 | $8k | 2% |
| 614E22350 WORK ZONE EDGE LINE, CLASS III, 4", 642 PAINT | 7.6 MILE | $769 | $6k | 2% |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 3.8 MILE | $1,280 | $5k | 1% |
| 409E30000 SAWING AND SEALING ASPHALT CONCRETE PAVEMENT JOINT | 42 FT | $65 | $3k | 1% |
| 254E01600 PATCHING PLANED SURFACE | 219 SY | $12 | $3k | 1% |