PAU-US 127-10.23
PAU County · est $0.5M
Bid dateThursday, July 31—
PAU County · est $0.5M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 4 more items below.
| Item | Quantity | R1Catts Construction INC | R2Vernon Nagel INC | R3Ohio Concrete Maintenance LLC | R4Miller Bros Const INC | R5Eagle Bridge CO | R6Perk Company INC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 848E10100 LATEX MODIFIED CONCRETE OVERLAY USING HYDRODEMOLIT | 1,136 SY | $97.00 | $79.00 | $114 | $99.42 | $100 | $102 | 34% |
| 624E10000 MOBILIZATION | 1 LS | $52,300 | $16,000 | $33,000 | $19,151 | $17,500 | $61,583 | 16% |
| 848E20001 SURFACE PREPARATION USING HYDRODEMOLITION, AS PER | 1,136 SY | $45.00 | $73.00 | $48.00 | $77.86 |
| Item | Quantity | R1Catts Construction INC | R2Vernon Nagel INC | R3Ohio Concrete Maintenance LLC | R4Miller Bros Const INC | R5Eagle Bridge CO | R6Perk Company INC |
|---|---|---|---|---|---|---|---|
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 407E20000 NON-TRACKING TACK COAT | 20 GAL | $3.00 | $2.75 | $2.50 | $2.11 | $2.75 | $2.00 |
| 848E50100 TEST SLAB | 1 LS | $650 | $8,500 | $5,500 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $100 |
| $82.33 |
| 16% |
| 848E30100 LATEX MODIFIED CONCRETE OVERLAY (VARIABLE THICKNES | 39 CY | $824 | $1,000 | $1,100 | $1,183 | $825 | $1,142 | 10% |
| 848E50000 HAND CHIPPING | 69 SY | $202 | $105 | $140 | $157 | $100 | $150 | 4% |
| 253E02000 PAVEMENT REPAIR | 20 CY | $591 | $525 | $900 | $842 | $525 | $400 | 4% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 10 CY | $774 | $525 | $800 | $778 | $525 | $350 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $7,000 | $5,000 | $10,000 | $8,246 | $15,000 | $31,776 | 2% |
| 516E14600 STRUCTURAL JOINT OR JOINT SEALER, MISC.: NEOPRENE | 57 FT | $109 | $130 | $150 | $151 | $250 | $158 | 2% |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 516 SY | $12.00 | $16.00 | $11.00 | $13.96 | $14.00 | $13.39 | 2% |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 16 SF | $250 | $130 | $200 | $374 | $400 | $444 | 1% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 42 SY | $91.00 | $500 | $170 | $154 | $415 | $150 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,800 | $5,000 | $12,000 | $1,883 | $8,000 | $4,500 | 1% |
| 253E02000 PAVEMENT REPAIR | 5 CY | $591 | $1,200 | $1,000 | $1,338 | $1,200 | $900 | 1% |
| 617E10100 COMPACTED AGGREGATE | 50 CY | $58.50 | $100 | $50.00 | $64.18 | $150 | $71.42 | 1% |
| 608E10000 4" CONCRETE WALK | 333 SF | $8.50 | $10.00 | $17.00 | $21.44 | $16.00 | $19.16 | 1% |
| 516E31001 JOINT SEALER, AS PER PLAN | 89 FT | $29.00 | $25.00 | $25.00 | $30.84 | $22.50 | $25.02 | 1% |
| 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA | 10 SF | $240 | $130 | $200 | $367 | $325 | $460 | 1% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,200 | $1,000 | $2,000 | $1,198 | $500 | $2,000 | 0% |
| 202E30000 WALK REMOVED | 333 SF | $3.25 | $8.00 | $13.00 | $7.92 | $6.00 | $9.70 | 0% |
| $9,727 |
| $3,250 |
| $10,867 |
| 848E50200 FULL-DEPTH REPAIR | 1 CY | $750 | $700 | $100 | $4,443 | $1,500 | $3,246 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 848E10100 LATEX MODIFIED CONCRETE OVERLAY USING HYDRODEMOLIT | 1,136 SY | $97 | $110k | 34% |
| 624E10000 MOBILIZATION | 1 LS | $52,300 | $52k | 16% |
| 848E20001 SURFACE PREPARATION USING HYDRODEMOLITION, AS PER | 1,136 SY | $45 | $51k | 16% |
| 848E30100 LATEX MODIFIED CONCRETE OVERLAY (VARIABLE THICKNES | 39 CY | $824 | $32k | 10% |
| 848E50000 HAND CHIPPING | 69 SY | $202 | $14k | 4% |
| 253E02000 PAVEMENT REPAIR | 20 CY | $591 | $12k | 4% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 10 CY | $774 | $8k | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $7,000 | $7k | 2% |
| 516E14600 STRUCTURAL JOINT OR JOINT SEALER, MISC.: NEOPRENE | 57 FT | $109 | $6k | 2% |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 516 SY | $12 | $6k | 2% |