| Item | Quantity | R1Eagle Bridge CO | R2Complete General Construction Company | R3Sunesis Construction CO | % of bid |
|---|---|---|---|---|---|
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 7,575 SF | $20.00 | $20.00 | $10.00 | 15% |
| 517E70100 RAILING (THREE STEEL TUBE BRIDGE RAILING) | 192 FT | $515 | $524 | $515 | 10% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $95,000 | $150,000 | $91,287 | 9% |
| 848E10001 MICRO SILICA MODIFIED CONCRETE OVERLAY USING HYDRO | 835 SY | $110 | $75.00 | $110 | 9% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 835 SY | $110 | $90.00 | $92.57 | 9% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 566 SY | $125 | $110 | $93.63 | 7% |
| 848E10001 MICRO SILICA MODIFIED CONCRETE OVERLAY USING HYDRO |
| Item | Quantity | R1Eagle Bridge CO | R2Complete General Construction Company | R3Sunesis Construction CO |
|---|---|---|---|---|
| 202E30000 WALK REMOVED | 100 SF | $10.00 | $10.00 | $19.23 |
| 202E38000 GUARDRAIL REMOVED | 330.5 FT | $3.70 | $2.40 | $3.70 |
| 202E42001 ANCHOR ASSEMBLY REMOVED, TYPE A, AS PER PLAN | 1 EACH | $550 | $345 | $947 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 1 EACH | $150 | $100 | $150 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 5 EACH | $150 | $85.00 | $971 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 566 SY |
| $110 |
| $80.00 |
| $105 |
| 6% |
| 511E34412 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE | 31 CY | $2,000 | $2,800 | $3,128 | 6% |
| 624E10000 MOBILIZATION | 1 LS | $55,000 | $60,000 | $205,508 | 5% |
| 517E75601 DEEP BEAM BRIDGE RETROFIT RAILING, AS PER PLAN | 187.5 FT | $160 | $178 | $160 | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $25,000 | $8,500 | $7,547 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $25,000 | $9,000 | $8,349 | 2% |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 7,575 SF | $3.00 | $3.00 | $3.00 | 2% |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 7,575 SF | $3.00 | $3.00 | $5.00 | 2% |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 7,575 SF | $3.00 | $3.00 | $6.00 | 2% |
| 614E12420 DETOUR SIGNING | 1 LS | $20,000 | $18,000 | $20,113 | 2% |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 24 CF | $806 | $806 | $918 | 2% |
| 625E33000 STRUCTURE GROUNDING SYSTEM | 2 EACH | $6,500 | $20,000 | $9,200 | 1% |
| 509E26000 GALVANIZED STEEL REINFORCEMENT | 4,239 LB | $3.00 | $1.75 | $3.03 | 1% |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 374 SY | $29.50 | $29.50 | $44.06 | 1% |
| 209E15050 RESHAPING UNDER GUARDRAIL |
| 0.07 MILE |
| $5,000 |
| $1,500 |
| $5,000 |
| 606E15050 GUARDRAIL, TYPE MGS | 293.75 FT | $22.00 | $21.60 | $22.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 1 EACH | $2,600 | $2,880 | $2,600 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 1 EACH | $2,600 | $2,880 | $2,600 |
| 606E34600 MGS BRIDGE TERMINAL ASSEMBLY, TYPE TST-2 | 2 EACH | $2,750 | $2,720 | $2,750 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 2 EACH | $2,750 | $2,640 | $2,750 |
| 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 1 EACH | $500 | $530 | $500 |
| 608E10000 4" CONCRETE WALK | 100 SF | $30.00 | $40.00 | $37.28 |
| 659E10000 SEEDING AND MULCHING | 750 SY | $5.00 | $4.50 | $10.44 |
| 659E20000 COMMERCIAL FERTILIZER | 0.1 TON | $1,500 | $1,250 | $1,250 |
| 659E31000 LIME | 0.16 ACRE | $5.00 | $150 | $150 |
| 659E35000 WATER | 4 MGAL | $10.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 2,000 EACH | $1.00 | $1.00 | $1.00 |
| 621E00100 RPM | 6 EACH | $467 | $476 | $467 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 6 EACH | $40.00 | $20.00 | $49.49 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BI-DIRECTIONAL) | 14 EACH | $12.00 | $11.70 | $12.00 |
| 646E10010 EDGE LINE, 6" | 0.09 MILE | $23,350 | $33,390 | $23,350 |
| 646E10200 CENTER LINE | 0.07 MILE | $31,165 | $85,857 | $31,165 |
| 202E38000 GUARDRAIL REMOVED | 175 FT | $3.70 | $2.40 | $3.70 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 1 EACH | $300 | $175 | $300 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 2 EACH | $150 | $100 | $150 |
| 209E60500 LINEAR GRADING | 0.05 MILE | $5,000 | $4,700 | $72,470 |
| 606E15050 GUARDRAIL, TYPE MGS | 175 FT | $22.00 | $21.60 | $22.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E(MASH 2016) | 1 EACH | $2,600 | $2,880 | $2,600 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $1,250 | $1,360 | $1,250 |
| 614E13318 BARRIER REFLECTOR, TYPE 5(BI-DIRECTIONAL) | 5 EACH | $15.00 | $20.00 | $15.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 5 EACH | $35.00 | $20.00 | $35.00 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 34 SY | $100 | $100 | $88.12 |
| 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE | 169 SY | $22.00 | $22.00 | $18.73 |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 34 SY | $26.50 | $26.50 | $88.12 |
| 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA | 15 SF | $250 | $175 | $200 |
| 848E30000 MICRO SILICA MODIFIED CONCRETE OVERLAY (VARIABLE T | 8 CY | $475 | $398 | $678 |
| 848E50000 HAND CHIPPING | 19 SY | $115 | $150 | $375 |
| 848E50100 TEST SLAB | 1 LS | $2,500 | $500 | $4,108 |
| 509E20001 CONCRETE REINFORCEMENT, REPLACEMENT OF EXISTING CO | 165 LB | $2.00 | $3.00 | $7.96 |
| 510E10001 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, AS | 65 EACH | $42.00 | $500 | $53.20 |
| 511E45710 CLASS QC1 CONCRETE, ABUTMENT | 1 CY | $4,250 | $8,500 | $628 |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 374 SY | $26.50 | $26.50 | $88.12 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 12 MNHR | $100 | $100 | $250 |
| 514E10000 FINAL INSPECTION REPAIR | 3 EACH | $400 | $400 | $650 |
| 516E31000 JOINT SEALER | 73 FT | $90.00 | $25.00 | $21.13 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 24 SF | $450 | $235 | $376 |
| 848E30000 MICRO SILICA MODIFIED CONCRETE OVERLAY (VARIABLE T | 12 CY | $475 | $398 | $678 |
| 848E50000 HAND CHIPPING | 25 SY | $115 | $150 | $356 |
| 848E50100 TEST SLAB | 1 LS | $2,500 | $500 | $4,108 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 181.75 FT | $25.00 | $30.00 | $42.70 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $7,000 | $4,000 | $8,198 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $7,500 | $9,000 | $5,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 7,575 SF | $20 | $152k | 13% |
| 517E70100 RAILING (THREE STEEL TUBE BRIDGE RAILING) | 192 FT | $515 | $99k | 9% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $95,000 | $95k | 8% |
| 848E10001 MICRO SILICA MODIFIED CONCRETE OVERLAY USING HYDRO | 835 SY | $110 | $92k | 8% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 835 SY | $110 | $92k | 8% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 566 SY | $125 | $71k | 6% |
| 848E10001 MICRO SILICA MODIFIED CONCRETE OVERLAY USING HYDRO | 566 SY | $110 | $62k | 5% |
| 511E34412 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE | 31 CY | $2,000 | $62k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $55,000 | $55k | 5% |
| 517E75601 DEEP BEAM BRIDGE RETROFIT RAILING, AS PER PLAN | 187.5 FT | $160 | $30k | 3% |