WAY-BH FY2026
WAY County · est $0.4M
Bid dateThursday, August 14—
WAY County · est $0.4M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 19 more items below.
| Item | Quantity | R1Ohio Concrete Maintenance LLC | R2Stanley Miller Construction Company | R3Madex Construction CO | % of bid |
|---|---|---|---|---|---|
| 611E96551 FIELD PAVING OF EXISTING PIPE, AS PER PLAN (168" D | 228 FT | $235 | $385 | $693 | 13% |
| 611E96551 FIELD PAVING OF EXISTING PIPE, AS PER PLAN (120" x | 198 FT | $230 | $300 | $513 | 11% |
| 659E00300 TOPSOIL | 862 CY | $45.00 | $55.00 | $34.74 | 9% |
| 611E96551 FIELD PAVING OF EXISTING PIPE, AS PER PLAN (186" x | 140 FT | $238 | $428 | $708 | 8% |
| 202E70130 SPECIAL - PIPE CLEANOUT OVER 48" | 90 FT | $295 | $300 | $48.90 | 6% |
| 611E96551 FIELD PAVING OF EXISTING PIPE, AS PER PLAN (161" x | 90 FT | $270 | $360 | $676 | 6% |
| 624E10000 MOBILIZATION | 1 LS | $24,000 |
| Item | Quantity | R1Ohio Concrete Maintenance LLC | R2Stanley Miller Construction Company | R3Madex Construction CO |
|---|---|---|---|---|
| 659E00100 SOIL ANALYSIS TEST | 8 EACH | $500 | $150 | $147 |
| 659E14000 REPAIR SEEDING AND MULCHING | 389 SY | $6.00 | $1.00 | $3.47 |
| 659E15000 INTER-SEEDING | 389 SY | $5.00 | $1.00 | $3.47 |
| 659E20000 COMMERCIAL FERTILIZER | 1.11 TON | $1,100 | $800 | $1,565 |
| 659E31000 LIME | 1.62 ACRE | $1,100 | $150 | $859 |
| 659E35000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $90,000 |
| $47,271 |
| 6% |
| 659E10000 SEEDING AND MULCHING | 7,751 SY | $3.00 | $3.20 | $3.47 | 6% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $20,000 | $18,000 | $41,548 | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $20,000 | $40,000 | $87,895 | 5% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 710 FT | $20.00 | $60.00 | $91.05 | 3% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING (WAY-3-1183) | 1 LS | $11,000 | $12,000 | $26,829 | 3% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING (WAY-30-1484) | 1 LS | $11,000 | $10,000 | $33,579 | 3% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING (WAY-241-0436) | 1 LS | $11,000 | $10,000 | $26,764 | 3% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING (WAY-585-1847) | 1 LS | $11,000 | $10,000 | $38,211 | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $10,000 | $10,000 | $4,322 | 2% |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1.00 | $1.00 | $1.00 | 2% |
| 202E70130 SPECIAL - PIPE CLEANOUT OVER 48" | 228 FT | $42.00 | $95.00 | $48.90 | 2% |
| 202E70130 SPECIAL - PIPE CLEANOUT OVER 48" | 198 FT | $42.00 | $105 | $48.90 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $8,000 | $5,000 | $14,579 | 2% |
| 45 MGAL |
| $20.00 |
| $1.00 |
| $28.95 |
| 202E38201 GUARDRAIL REMOVED FOR REUSE, AS PER PLAN | 75 FT | $20.00 | $40.00 | $107 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 24 HOUR | $120 | $225 | $116 |
| 614E11630 INCREASED BARRIER DELINEATION | 710 FT | $2.00 | $10.00 | $4.63 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $500 | $7,000 | $3,474 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (1WAY) | 15 EACH | $20.00 | $30.00 | $34.74 |
| 614E13350 OBJECT MARKER, ONE WAY | 15 EACH | $20.00 | $30.00 | $40.53 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 0.25 MILE | $5,000 | $10,000 | $5,789 |
| 614E24612 WORK ZONE DOTTED LINE, CLASS III, 6", 642 PAINT | 496 FT | $3.00 | $10.00 | $4.63 |
| 202E70130 SPECIAL - PIPE CLEANOUT OVER 48" | 140 FT | $42.00 | $105 | $48.90 |
| 611E97500 CONDUIT, MISC.: WATERBLAST AND PAINT | 7 SY | $150 | $1,000 | $579 |
| 203E10000 EXCAVATION | 6 CY | $975 | $300 | $174 |
| 611E97500 CONDUIT, MISC.: WATERBLAST AND PAINT | 70 SY | $50.00 | $500 | $57.90 |
| 619E16010 FIELD OFFICE, TYPE B | 4 MNTH | $1,000 | $1,000 | $858 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E96551 FIELD PAVING OF EXISTING PIPE, AS PER PLAN (168" D | 228 FT | $235 | $54k | 12% |
| 611E96551 FIELD PAVING OF EXISTING PIPE, AS PER PLAN (120" x | 198 FT | $230 | $46k | 10% |
| 659E00300 TOPSOIL | 862 CY | $45 | $39k | 8% |
| 611E96551 FIELD PAVING OF EXISTING PIPE, AS PER PLAN (186" x | 140 FT | $238 | $33k | 7% |
| 202E70130 SPECIAL - PIPE CLEANOUT OVER 48" | 90 FT | $295 | $27k | 6% |
| 611E96551 FIELD PAVING OF EXISTING PIPE, AS PER PLAN (161" x | 90 FT | $270 | $24k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $24,000 | $24k | 5% |
| 659E10000 SEEDING AND MULCHING | 7,751 SY | $3 | $23k | 5% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $20,000 | $20k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $20,000 | $20k | 4% |