CLA-PAVE-FY26 (B)
CLA County · est $5.2M
Bid dateThursday, September 25—
CLA County · est $5.2M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 58 more items below.
| Item | Quantity | R1Shelly Company | R2John R Jurgensen Company | R3Barrett Paving Materials INC | % of bid |
|---|---|---|---|---|---|
| 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 15,112 CY | $200 | $214 | $330 | 67% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1 1/2" Depth | 362,534 SY | $1.38 | $1.57 | $3.00 | 11% |
| 251E01041 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 1,850 SY | $135 | $133 | $150 | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $136,000 | $79,989 | $288,000 | 3% |
| 407E20000 NON-TRACKING TACK COAT | 30,873 GAL | $3.00 | $5.00 | $2.00 | 2% |
| 617E10100 COMPACTED AGGREGATE | 906 CY | $90.00 | $256 | $150 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $60,000 |
| Item | Quantity | R1Shelly Company | R2John R Jurgensen Company | R3Barrett Paving Materials INC |
|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 224 SY | $20.00 | $33.46 | $30.00 |
| 202E30000 WALK REMOVED | 48 SF | $15.00 | $20.00 | $20.00 |
| 202E32500 CURB AND GUTTER REMOVED | 500 FT | $18.00 | $30.00 | $30.00 |
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 937 FT | $10.00 | $16.29 | $2.50 |
| 203E10000 EXCAVATION | 280 CY | $55.00 | $75.95 | $45.00 |
| 203E20000 EMBANKMENT | 125 CY |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $250,000 |
| $100,000 |
| 1% |
| 621E00100 RPM | 1,558 EACH | $32.50 | $32.50 | $32.50 | 1% |
| 252E01000 FULL DEPTH RIGID PAVEMENT REMOVAL AND FLEXIBLE REP | 200 SY | $245 | $329 | $300 | 1% |
| 644E00104 EDGE LINE, 6" | 13.47 MILE | $3,500 | $3,500 | $3,500 | 1% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 151 CY | $250 | $310 | $400 | 1% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (74 CY | $300 | $377 | $460 | 0% |
| 609E24510 CURB, TYPE 4-C | 500 FT | $44.00 | $52.05 | $45.00 | 0% |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 22.3 MILE | $915 | $915 | $915 | 0% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $20,000 | $3,768 | $25,070 | 0% |
| 304E20000 AGGREGATE BASE | 123 CY | $150 | $149 | $130 | 0% |
| 642E00104 EDGE LINE, 6", TYPE 1 | 19.51 MILE | $870 | $870 | $870 | 0% |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 11,028 FT | $1.50 | $1.50 | $1.50 | 0% |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 24.14 MILE | $660 | $660 | $660 | 0% |
| 644E00404 CHANNELIZING LINE, 12" | 5,514 FT | $2.80 | $2.80 | $2.80 | 0% |
| $40.00 |
| $50.02 |
| $45.00 |
| 204E10000 SUBGRADE COMPACTION | 812 SY | $2.00 | $4.16 | $4.00 |
| 608E10000 4" CONCRETE WALK | 48 SF | $60.00 | $39.41 | $25.00 |
| 608E53020 DETECTABLE WARNING | 16 SF | $60.00 | $60.00 | $60.00 |
| 690E50350 SPECIAL - MAILBOX REMOVED AND RESET | 1 EACH | $350 | $485 | $280 |
| 659E00300 TOPSOIL | 70 CY | $150 | $35.31 | $100 |
| 659E00510 SEEDING AND MULCHING, CLASS 2 | 950 SY | $5.00 | $3.20 | $5.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 35 SY | $1.00 | $1.00 | $1.00 |
| 659E15000 INTER-SEEDING | 35 SY | $0.01 | $0.50 | $0.01 |
| 659E20000 COMMERCIAL FERTILIZER | 0.01 TON | $1,500 | $800 | $1,500 |
| 659E31000 LIME | 0.14 ACRE | $200 | $10.00 | $200 |
| 659E35000 WATER | 4 MGAL | $1.00 | $5.00 | $1.00 |
| 605E06000 4" BASE PIPE UNDERDRAINS | 937 FT | $12.00 | $29.53 | $10.00 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 12 EACH | $1,250 | $1,327 | $1,200 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 500 FT | $3.00 | $4.00 | $3.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3 1/4" Depth | 675 SY | $8.45 | $11.79 | $3.00 |
| 254E01601 PATCHING PLANED SURFACE, AS PER PLAN | 500 SY | $10.00 | $4.57 | $10.00 |
| 301E56001 ASPHALT CONCRETE BASE, (449), AS PER PLAN, PG64-22 | 3 CY | $800 | $1,435 | $1,200 |
| 618E40600 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 2.48 MILE | $1,400 | $1,400 | $2,500 |
| 618E43000 RUMBLE STRIPES, CENTER LINE (ASPHALT CONCRETE) | 2.44 MILE | $1,400 | $1,400 | $2,500 |
| 874E21000 LONGITUDINAL JOINT PREPARATION | 2.44 MILE | $1,500 | $3,706 | $6,000 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 1,558 EACH | $4.00 | $11.66 | $5.00 |
| 642E00300 CENTER LINE, TYPE 1 | 9.73 MILE | $1,130 | $1,130 | $1,130 |
| 644E00204 LANE LINE, 6" | 5.93 MILE | $1,175 | $1,175 | $1,175 |
| 644E00300 CENTER LINE | 1.47 MILE | $3,985 | $3,985 | $3,985 |
| 644E00400 CHANNELIZING LINE, 8" | 1,831 FT | $2.60 | $2.60 | $2.60 |
| 644E00500 STOP LINE | 1,109 FT | $8.00 | $8.00 | $8.00 |
| 644E00620 CROSSWALK LINE, 12" | 496 FT | $4.50 | $4.50 | $4.50 |
| 644E00630 CROSSWALK LINE, 24", HIGH VISIBILTY | 80 FT | $8.00 | $8.00 | $8.00 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 1,792 FT | $8.00 | $8.00 | $8.00 |
| 644E00900 ISLAND MARKING | 1,465 SF | $4.00 | $4.00 | $4.00 |
| 644E01110 SCHOOL SYMBOL MARKING, 96" | 2 EACH | $800 | $800 | $800 |
| 644E01300 LANE ARROW | 40 EACH | $95.00 | $95.00 | $95.00 |
| 644E01360 WRONG WAY ARROW | 1 EACH | $200 | $200 | $200 |
| 644E01410 WORD ON PAVEMENT, 96" | 2 EACH | $500 | $500 | $200 |
| 644E01510 DOTTED LINE, 6" | 2,526 FT | $2.00 | $2.00 | $2.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 160 HOUR | $85.00 | $124 | $80.00 |
| 614E12460 WORK ZONE MARKING SIGN | 78 EACH | $115 | $91.80 | $91.80 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 11.86 MILE | $510 | $510 | $510 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 3,598 FT | $1.30 | $1.30 | $1.30 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 2,220 FT | $4.50 | $4.50 | $4.50 |
| 614E27250 WORK ZONE CROSSWALK LINE, CLASS III, 12", 642 PAIN | 160 FT | $3.50 | $3.50 | $3.50 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT | 76 EACH | $75.00 | $75.00 | $75.00 |
| 614E31750 WORK ZONE SCHOOL SYMBOL MARKING, 96", CLASS III, 6 | 4 EACH | $300 | $300 | $300 |
| 516E31001 JOINT SEALER, AS PER PLAN | 193 FT | $22.50 | $22.50 | $22.50 |
| 516E31001 JOINT SEALER, AS PER PLAN | 256 FT | $22.50 | $22.50 | $22.50 |
| 519E12300 PATCHING CONCRETE BRIDGE DECK - TYPE B | 5 SY | $1,350 | $1,350 | $1,350 |
| 519E12300 PATCHING CONCRETE BRIDGE DECK - TYPE B | 1 SY | $1,800 | $1,800 | $1,800 |
| 519E12300 PATCHING CONCRETE BRIDGE DECK - TYPE B | 1 SY | $1,800 | $1,800 | $1,800 |
| 516E31001 JOINT SEALER, AS PER PLAN | 47 FT | $22.50 | $22.50 | $22.50 |
| 516E31001 JOINT SEALER, AS PER PLAN | 114 FT | $22.50 | $22.50 | $22.50 |
| 516E31001 JOINT SEALER, AS PER PLAN | 233 FT | $22.50 | $22.50 | $22.50 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $2,500 | $5,000 | $10,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 15,112 CY | $200 | $3.02M | 63% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1 1/2" Depth | 362,534 SY | $1.38 | $500k | 10% |
| 251E01041 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 1,850 SY | $135 | $250k | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $136,000 | $136k | 3% |
| 407E20000 NON-TRACKING TACK COAT | 30,873 GAL | $3 | $93k | 2% |
| 617E10100 COMPACTED AGGREGATE | 906 CY | $90 | $82k | 2% |
| 624E10000 MOBILIZATION | 1 LS | $60,000 | $60k | 1% |
| 621E00100 RPM | 1,558 EACH | $32.5 | $51k | 1% |
| 252E01000 FULL DEPTH RIGID PAVEMENT REMOVAL AND FLEXIBLE REP | 200 SY | $245 | $49k | 1% |
| 644E00104 EDGE LINE, 6" | 13.47 MILE | $3,500 | $47k | 1% |