ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 101 more items below.
| Item | Quantity | R1George J Igel & CO INC | R2Shelly & Sands INC | R3Complete General Construction Company | R4Alan Stone CO INC | R5Rietschlin Construction INC | R6Trucco Construction CO INC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 524E94505 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK, AS PER | 2,166 FT | $280 | $290 | $160 | $270 | $265 | $312 | 23% |
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 6,791 FT | $80.00 | $92.50 | $152 | $122 | $150 | $140 | 20% |
| 507E00400 STEEL PILES, MISC.:12X53, FURNISHED | 6,422 FT | $45.00 | $42.00 |
| Item | Quantity | R1George J Igel & CO INC | R2Shelly & Sands INC | R3Complete General Construction Company | R4Alan Stone CO INC | R5Rietschlin Construction INC | R6Trucco Construction CO INC |
|---|---|---|---|---|---|---|---|
| 202E11004 STRUCTURE REMOVED | 4 EACH | $2,550 | $9,000 | $6,000 | $2,000 | $10,000 | $21,400 |
| 202E20010 HEADWALL REMOVED | 13 EACH | $385 | $1,500 | $600 | $500 | $3,000 | $4,460 |
| 202E30000 WALK REMOVED | 43 SF | $11.25 | $7.00 | $12.00 | $10.00 | $9.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $48.00 |
| $47.00 |
| $58.00 |
| $63.00 |
| 11% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 657 CY | $275 | $250 | $245 | $290 | $297 | $245 | 7% |
| 203E10000 EXCAVATION | 4,033 CY | $40.00 | $50.00 | $34.00 | $40.00 | $32.00 | $58.00 | 6% |
| 511E46012 CLASS QC1 CONCRETE WITH QC/QA, RETAINING/WINGWALL | 217 CY | $700 | $1,085 | $1,600 | $1,040 | $700 | $2,500 | 6% |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $90,000 | $124,676 | $100,000 | $260,000 | $110,000 | $92,000 | 3% |
| 602E20000 CONCRETE MASONRY | 70 CY | $1,250 | $3,000 | $1,900 | $2,500 | $2,030 | $5,000 | 3% |
| 253E02000 PAVEMENT REPAIR | 321 CY | $265 | $300 | $300 | $333 | $300 | $240 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $75,000 | $200,000 | $200,000 | $135,000 | $150,000 | $200,000 | 3% |
| 832E30000 EROSION CONTROL | 70,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 3% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 29,243 LB | $1.70 | $3.00 | $2.70 | $2.50 | $1.75 | $3.00 | 2% |
| 606E15150 GUARDRAIL, TYPE MGS HALF POST SPACING | 1,737.5 FT | $26.80 | $26.80 | $26.80 | $27.00 | $40.00 | $27.00 | 2% |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 313 CY | $125 | $135 | $98.00 | $100 | $92.00 | $181 | 1% |
| 619E16010 FIELD OFFICE, TYPE B | 10 MNTH | $3,500 | $4,000 | $3,500 | $1,500 | $1,375 | $3,000 | 1% |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 1,465 SY | $23.50 | $23.50 | $23.50 | $24.00 | $26.00 | $23.50 | 1% |
| 611E23600 60" CONDUIT, TYPE A, 706.02, 707.02 (1") (0.168) ( | 58 FT | $540 | $650 | $620 | $380 | $420 | $575 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $30,000 | $24,500 | $25,000 | $45,000 | $45,000 | $30,000 | 1% |
| 611E16200 36" CONDUIT, TYPE A, 706.02 | 102 FT | $275 | $350 | $335 | $240 | $300 | $371 | 1% |
| 611E23600 60" CONDUIT, TYPE A, 706.02, 707.02 (1") (ALUMINIZ | 53 FT | $525 | $760 | $645 | $400 | $410 | $600 | 1% |
| $6.60 |
| 202E30204 STEPS REMOVED | 1 LS | $1,455 | $90.00 | $1,200 | $1,800 | $1,900 | $2,090 |
| 202E32500 CURB AND GUTTER REMOVED | 32 FT | $15.00 | $6.00 | $18.00 | $20.00 | $25.00 | $16.20 |
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 311 FT | $25.00 | $45.00 | $30.00 | $20.00 | $55.00 | $43.00 |
| 202E35200 PIPE REMOVED, OVER 24" DIAMETER | 138 FT | $24.75 | $60.00 | $90.00 | $20.00 | $55.00 | $100 |
| 202E38000 GUARDRAIL REMOVED | 2,538 FT | $2.00 | $2.00 | $2.00 | $2.50 | $5.00 | $2.00 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 1 EACH | $195 | $195 | $400 | $400 | $209 | $195 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 2 EACH | $110 | $110 | $325 | $400 | $110 | $110 |
| 202E58000 MANHOLE REMOVED | 2 EACH | $500 | $500 | $800 | $500 | $2,700 | $3,390 |
| 202E58100 CATCH BASIN REMOVED | 1 EACH | $400 | $500 | $500 | $550 | $750 | $1,190 |
| 202E75000 FENCE REMOVED | 1,676 FT | $5.85 | $5.00 | $3.75 | $6.00 | $7.00 | $3.80 |
| 202E75250 GATE REMOVED | 1 EACH | $500 | $250 | $390 | $500 | $550 | $390 |
| 202E98100 REMOVAL MISC.: INSPECTION WELL | 4 EACH | $390 | $200 | $500 | $940 | $500 | $670 |
| 202E98100 REMOVAL MISC.: MAILBOX | 2 EACH | $115 | $75.00 | $25.00 | $340 | $200 | $250 |
| 202E98200 REMOVAL MISC.: CONDUIT | 20 FT | $32.50 | $20.00 | $30.00 | $85.00 | $26.00 | $27.00 |
| 202E98200 REMOVAL MISC.: STACKED STONE WALL | 262 FT | $17.50 | $30.00 | $20.00 | $40.00 | $19.00 | $106 |
| 203E20000 EMBANKMENT | 300 CY | $17.50 | $18.00 | $38.00 | $32.20 | $17.00 | $39.00 |
| 203E20001 EMBANKMENT, AS PER PLAN | 50 CY | $30.00 | $40.00 | $50.00 | $31.74 | $38.00 | $10.10 |
| 209E72000 PREPARING SUBGRADE FOR SHOULDER PAVING | 37 STA | $610 | $250 | $500 | $200 | $150 | $570 |
| 606E15050 GUARDRAIL, TYPE MGS | 862.5 FT | $18.40 | $18.40 | $18.40 | $20.00 | $26.00 | $18.40 |
| 606E17360 GUARDRAIL, TYPE MGS, LONG-SPAN | 375 FT | $22.40 | $22.40 | $22.40 | $25.00 | $27.00 | $22.40 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 7 EACH | $2,525 | $2,525 | $2,525 | $2,500 | $2,695 | $2,530 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 2 EACH | $1,370 | $1,370 | $1,370 | $1,400 | $1,342 | $1,370 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 5 EACH | $195 | $195 | $195 | $200 | $165 | $195 |
| 690E50300 SPECIAL - MAILBOX SUPPORT SYSTEM, MULTIPLE | 1 EACH | $380 | $380 | $380 | $400 | $429 | $380 |
| 601E11000 RIPRAP, TYPE D | 30 SY | $515 | $450 | $500 | $395 | $492 | $700 |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 20 CY | $225 | $275 | $100 | $200 | $195 | $188 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 33 CY | $245 | $275 | $105 | $200 | $175 | $311 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $150 | $135 | $75.00 | $180 | $150 | $135 |
| 659E00300 TOPSOIL | 1,002 CY | $21.25 | $42.00 | $45.00 | $25.00 | $45.00 | $66.00 |
| 659E10000 SEEDING AND MULCHING | 8,498 SY | $1.25 | $0.80 | $0.50 | $2.00 | $1.00 | $0.80 |
| 659E14000 REPAIR SEEDING AND MULCHING | 426 SY | $1.25 | $0.80 | $1.80 | $2.00 | $1.00 | $1.80 |
| 659E15000 INTER-SEEDING | 426 SY | $1.25 | $0.80 | $1.80 | $1.00 | $1.00 | $1.80 |
| 659E20000 COMMERCIAL FERTILIZER | 1.3 TON | $1,250 | $816 | $750 | $700 | $900 | $820 |
| 659E31000 LIME | 2 ACRE | $150 | $156 | $10.00 | $900 | $200 | $156 |
| 659E35000 WATER | 24 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 659E40000 MOWING | 19 MSF | $100 | $100 | $18.45 | $120 | $110 | $18.50 |
| 670E00500 SLOPE EROSION PROTECTION | 8,498 SY | $2.50 | $1.50 | $2.75 | $2.50 | $1.75 | $2.75 |
| 670E00700 DITCH EROSION PROTECTION | 639 SY | $2.50 | $1.60 | $2.00 | $3.50 | $1.75 | $2.00 |
| 670E00710 DITCH EROSION PROTECTION MAT, TYPE A | 328 SY | $2.50 | $1.50 | $2.00 | $2.00 | $1.75 | $2.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $5,000 | $5,000 | $4,000 | $5,000 | $3,300 | $2,950 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $5,400 | $18,000 | $12,000 | $15,000 | $8,500 | $10,700 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $10,000 | $12,500 | $12,500 | $14,000 | $13,750 | $16,500 |
| 836E10000 SEEDING AND EROSION CONTROL WITH TURF REINFORCING | 321 SY | $6.00 | $5.30 | $4.75 | $9.00 | $6.00 | $4.75 |
| 611E04600 12" CONDUIT, TYPE C | 46 FT | $118 | $110 | $150 | $70.00 | $105 | $87.00 |
| 611E04900 12" CONDUIT, TYPE D | 199 FT | $113 | $85.00 | $145 | $70.00 | $65.00 | $78.00 |
| 611E10200 24" CONDUIT, TYPE A, 706.02 | 44 FT | $203 | $290 | $300 | $125 | $220 | $237 |
| 611E10600 24" CONDUIT, TYPE C | 6 FT | $250 | $350 | $265 | $245 | $360 | $370 |
| 611E16200 36" CONDUIT, TYPE A, 706.02, 30" 707.01 (1/2") (AL | 51 FT | $275 | $350 | $330 | $210 | $300 | $240 |
| 611E20700 48" CONDUIT, TYPE A, 706.02, 60" 707.03 (2") (0.18 | 47 FT | $400 | $540 | $630 | $400 | $515 | $380 |
| 611E20700 48" CONDUIT, TYPE A, 706.02, 707.01 (1/2") (ALUMIN | 46 FT | $405 | $630 | $500 | $400 | $400 | $475 |
| 611E20900 48" CONDUIT, TYPE B, 706.02 | 55 FT | $390 | $575 | $640 | $325 | $500 | $670 |
| 611E21100 48" CONDUIT, TYPE C | 6 FT | $405 | $535 | $540 | $400 | $790 | $820 |
| 611E52900 34" X 53" CONDUIT, TYPE A, 706.04 | 58 FT | $475 | $580 | $500 | $400 | $500 | $550 |
| 611E97400 CONDUIT, MISC.:TYPE B FOR DRAINAGE DISCHARGE CONTI | 20 FT | $70.00 | $32.00 | $75.00 | $530 | $70.00 | $120 |
| 611E97400 CONDUIT, MISC.:TYPE C FOR DRAINAGE DISCHARGE CONTI | 20 FT | $60.00 | $25.00 | $75.00 | $530 | $50.00 | $70.00 |
| 611E97400 CONDUIT, MISC.:TYPE E FOR DRAINAGE DISCHARGE CONTI | 20 FT | $55.00 | $25.00 | $75.00 | $530 | $50.00 | $50.00 |
| 611E97400 CONDUIT, MISC.:TYPE F FOR DRAINAGE DISCHARGE CONTI | 20 FT | $65.00 | $25.00 | $75.00 | $530 | $50.00 | $50.00 |
| 611E98470 CATCH BASIN, NO. 2-2B | 5 EACH | $3,000 | $3,750 | $2,100 | $2,288 | $2,225 | $3,630 |
| 611E99574 MANHOLE, NO. 3 WITH 72" BASE ID | 1 EACH | $10,000 | $9,000 | $9,000 | $4,957 | $14,900 | $13,400 |
| 611E99720 INSPECTION WELL | 4 EACH | $4,200 | $850 | $1,600 | $831 | $1,600 | $1,800 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" | 4,884 SY | $5.50 | $3.50 | $4.75 | $6.50 | $7.25 | $4.75 |
| 301E56100 ASPHALT CONCRETE BASE, PG64-22, (449), (DRIVEWAYS) | 21 CY | $515 | $450 | $600 | $600 | $616 | $560 |
| 304E20000 AGGREGATE BASE | 6 CY | $113 | $225 | $240 | $104 | $184 | $172 |
| 407E10000 TACK COAT | 1,279 GAL | $7.00 | $3.50 | $3.25 | $4.72 | $2.75 | $3.25 |
| 407E20000 NON-TRACKING TACK COAT | 451 GAL | $10.00 | $3.50 | $4.50 | $5.15 | $4.75 | $4.50 |
| 411E10001 STABILIZED CRUSHED AGGREGATE, AS PER PLAN | 245 CY | $72.50 | $100 | $120 | $70.00 | $88.00 | $80.00 |
| 441E70500 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449) | — | $700 | $750 | $375 | $1,300 | $820 | $375 |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 32 FT | $135 | $165 | $60.00 | $135 | $172 | $187 |
| 617E10100 COMPACTED AGGREGATE | 41 CY | $125 | $105 | $140 | $110 | $110 | $311 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 46 EACH | $11.50 | $11.50 | $11.50 | $20.00 | $13.25 | $11.50 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 70 FT | $15.80 | $15.80 | $15.80 | $20.00 | $16.50 | $15.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 65 FT | $19.20 | $19.20 | $19.20 | $19.90 | $19.00 | $17.00 |
| 630E08510 STREET NAME SIGN SUPPORT, NO. 2 POST | 32 FT | $17.50 | $17.50 | $17.50 | $25.00 | $19.00 | $17.00 |
| 630E80100 SIGN, FLAT SHEET | 89 SF | $19.00 | $19.00 | $19.00 | $20.00 | $27.50 | $25.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 16 EACH | $10.00 | $10.00 | $10.00 | $30.00 | $22.00 | $20.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 14 EACH | $15.00 | $15.00 | $15.00 | $35.00 | $22.00 | $20.00 |
| 642E00100 EDGE LINE, 4", TYPE 1 | 1.82 MILE | $690 | $1,067 | $690 | $890 | $800 | $1,620 |
| 642E00300 CENTER LINE, TYPE 1 | 0.91 MILE | $1,400 | $1,205 | $1,400 | $1,800 | $1,600 | $2,230 |
| 644E00100 EDGE LINE, 4" | 0.68 MILE | $5,290 | $4,360 | $5,290 | $6,800 | $6,000 | $5,500 |
| 644E00300 CENTER LINE | 0.33 MILE | $9,380 | $5,393 | $9,380 | $12,000 | $10,400 | $8,300 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 120 HOUR | $100 | $104 | $55.00 | $100 | $94.00 | $110 |
| 614E12420 DETOUR SIGNING | 1 LS | $12,950 | $12,500 | $30,000 | $15,000 | $14,500 | $14,000 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 25 CY | $440 | $365 | $300 | $380 | $297 | $365 |
| 614E18600 PORTABLE CHANGEABLE MESSAGE SIGN | 18 SNMT | $575 | $575 | $900 | $1,200 | $640 | $620 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.68 MILE | $1,275 | $1,275 | $1,275 | $1,400 | $1,500 | $1,380 |
| 614E22350 WORK ZONE EDGE LINE, CLASS III, 4", 642 PAINT | 0.33 MILE | $830 | $830 | $830 | $950 | $1,000 | $900 |
| 616E10000 WATER | 25 MGAL | $50.00 | $80.00 | $165 | $0.10 | $1.00 | $118 |
| 202E11001 STRUCTURE REMOVED, AS PER PLAN | 1 LS | $4,000 | $10,000 | $9,000 | $12,000 | $25,000 | $2,470 |
| 503E21100 UNCLASSIFIED EXCAVATION | 781 CY | $32.50 | $65.00 | $100 | $35.00 | $155 | $129 |
| 507E00400 STEEL PILES, MISC.:12X84, FURNISHED | 62 FT | $75.00 | $80.00 | $85.00 | $97.00 | $91.00 | $100 |
| 511E81300 CONCRETE, MISC.:10'-0" X 2'-0" X 1'-0" PRECAST CON | 2 EACH | $1,500 | $1,550 | $1,100 | $1,500 | $2,000 | $2,150 |
| 511E81300 CONCRETE, MISC.:10'-0" X 3'-7 1/2" X 1'-0" PRECAST | 2 EACH | $2,500 | $2,050 | $1,600 | $6,300 | $3,000 | $2,780 |
| 511E81300 CONCRETE, MISC.:10'-0" X 6'-6" X 1'-0" PRECAST CON | 1 EACH | $3,500 | $3,025 | $2,400 | $7,000 | $5,000 | $4,300 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 496 FT | $1.50 | $2.00 | $10.00 | $10.00 | $12.00 | $26.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 12 FT | $20.00 | $10.00 | $19.00 | $10.00 | $44.00 | $98.00 |
| 518E62200 STRUCTURE DRAINAGE, MISC.:WEEP DRAINS | 58 EACH | $175 | $215 | $500 | $500 | $207 | $125 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $9,000 | $17,500 | $20,000 | $45,000 | $25,000 | $75,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $25,000 | $46,500 | $60,000 | $80,000 | $40,000 | $75,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 524E94505 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK, AS PER | 2,166 FT | $280 | $606k | 18% |
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 6,791 FT | $80 | $543k | 16% |
| 507E00400 STEEL PILES, MISC.:12X53, FURNISHED | 6,422 FT | $45 | $289k | 9% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 657 CY | $275 | $181k | 5% |
| 203E10000 EXCAVATION | 4,033 CY | $40 | $161k | 5% |
| 511E46012 CLASS QC1 CONCRETE WITH QC/QA, RETAINING/WINGWALL | 217 CY | $700 | $152k | 5% |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $90,000 | $90k | 3% |
| 602E20000 CONCRETE MASONRY | 70 CY | $1,250 | $88k | 3% |
| 253E02000 PAVEMENT REPAIR | 321 CY | $265 | $85k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $75,000 | $75k | 2% |