MIA-SR 41-11.32
MIA County · est $3.5M
Bid dateThursday, September 25—
MIA County · est $3.5M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 149 more items below.
| Item | Quantity | R1R B Jergens Contractors INC | R2Performance Site Development | R3Eagle Bridge CO | R4Complete General Construction Company | R5John R Jurgensen Company | R6Brumbaugh Construction INC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 452E16020 13" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 7,034 SY | $125 | $123 | $165 | $166 | $179 | $175 | 39% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $138,717 | $125,900 | $130,000 | $50,000 | $45,061 | $160,000 | 6% |
| 632E81700 COMBINATION SIGNAL SUPPORT, MISC.: TC-12.31 DESIGN | 2 EACH | $61,903 | $64,576 |
| Item | Quantity | R1R B Jergens Contractors INC | R2Performance Site Development | R3Eagle Bridge CO | R4Complete General Construction Company | R5John R Jurgensen Company | R6Brumbaugh Construction INC |
|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $28,578 | $49,750 | $40,000 | $5,000 | $11,896 | $20,000 |
| 202E11005 STRUCTURE REMOVED, AS PER PLAN | 1 EACH | $13,601 | $6,250 | $5,000 | $3,000 | $4,002 | $5,000 |
| 202E30000 WALK REMOVED | 220 SF | $4.97 | $15.00 | $6.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $43,510 |
| $43,000 |
| $43,510 |
| $48,000 |
| 5% |
| 304E20000 AGGREGATE BASE | 1,507 CY | $72.96 | $73.35 | $85.00 | $100 | $92.27 | $60.00 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $47,500 | $187,500 | $195,000 | $187,500 | $194,682 | 4% |
| 622E41011 PORTABLE BARRIER, 50", AS PER PLAN | 1,755 FT | $50.13 | $51.20 | $30.00 | $35.00 | $56.05 | $54.00 | 4% |
| 203E10000 EXCAVATION | 4,963 CY | $17.37 | $27.65 | $30.00 | $40.00 | $25.01 | $30.00 | 4% |
| 202E23000 PAVEMENT REMOVED | 5,834 SY | $14.67 | $14.80 | $22.00 | $20.00 | $23.14 | $20.00 | 4% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 164 CY | $460 | $353 | $300 | $410 | $410 | $330 | 3% |
| 659E00300 TOPSOIL | 1,100 CY | $64.26 | $65.20 | $30.00 | $80.00 | $30.15 | $80.00 | 3% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 7 EACH | $10,065 | $10,501 | $8,870 | $8,100 | $8,870 | $9,800 | 3% |
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 6 EACH | $10,065 | $10,501 | $9,200 | $8,500 | $9,200 | $10,200 | 3% |
| 622E10160 CONCRETE BARRIER, SINGLE SLOPE, TYPE D | 150 FT | $402 | $217 | $225 | $150 | $225 | $250 | 3% |
| 605E11100 6" SHALLOW PIPE UNDERDRAINS | 4,322 FT | $10.89 | $21.00 | $14.00 | $16.00 | $22.90 | $18.00 | 2% |
| 608E12001 5" CONCRETE WALK, AS PER PLAN | 5,238 SF | $8.82 | $9.55 | $11.00 | $12.00 | $11.40 | $13.00 | 2% |
| 204E30020 GRANULAR MATERIAL, TYPE C | 730 CY | $62.63 | $68.00 | $80.00 | $65.00 | $126 | $60.00 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $44,634 | $88,950 | $55,000 | $34,000 | $13,373 | $52,000 | 2% |
| 632E72150 SIGNAL SUPPORT, TYPE TC-81.22, DESIGN 14 | 2 EACH | $22,030 | $22,981 | $24,245 | $22,500 | $24,245 | $26,000 | 2% |
| 609E12001 COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN ( | 822 FT | $52.94 | $38.50 | $46.00 | $43.00 | $49.54 | $51.00 | 2% |
| 632E64011 SIGNAL SUPPORT FOUNDATION, AS PER PLAN | 6 EACH | $6,794 | $7,088 | $7,890 | $12,000 | $7,890 | $8,800 | 2% |
| $7.00 |
| $16.41 |
| $10.00 |
| 202E32000 CURB REMOVED | 72 FT | $23.10 | $11.00 | $10.00 | $10.00 | $29.00 | $30.00 |
| 202E32500 CURB AND GUTTER REMOVED | 60 FT | $11.04 | $12.00 | $10.00 | $11.00 | $34.16 | $47.00 |
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 99 FT | $24.38 | $28.50 | $20.00 | $75.00 | $147 | $75.00 |
| 202E38000 GUARDRAIL REMOVED | 954 FT | $2.90 | $2.25 | $3.00 | $2.00 | $6.00 | $7.00 |
| 202E75000 FENCE REMOVED | 533 FT | $5.18 | $3.20 | $6.00 | $3.00 | $7.00 | $8.00 |
| 202E98100 REMOVAL MISC.:UTILITY PULL BOX REMOVED AND CAPPED | 1 EACH | $116 | $550 | $250 | $245 | $500 | $500 |
| 203E20000 EMBANKMENT | 4,117 CY | $7.21 | $10.25 | $17.00 | $15.00 | $15.13 | $25.00 |
| 204E10000 SUBGRADE COMPACTION | 9,016 SY | $3.97 | $1.00 | $3.00 | $3.00 | $2.09 | $2.00 |
| 204E13000 EXCAVATION OF SUBGRADE | 730 CY | $40.26 | $32.50 | $25.00 | $48.00 | $51.24 | $32.00 |
| 204E45000 PROOF ROLLING | 2 HOUR | $326 | $450 | $150 | $350 | $249 | $300 |
| 204E50000 GEOTEXTILE FABRIC | 1,976 SY | $5.68 | $2.55 | $1.75 | $2.00 | $3.70 | $2.50 |
| 512E10001 SEALING OF CONCRETE SURFACES, AS PER PLAN | 1,002 SY | $12.95 | $14.00 | $12.50 | $12.50 | $12.50 | $5.50 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 1,387.5 FT | $22.28 | $21.45 | $21.00 | $20.40 | $21.00 | $23.00 |
| 606E26050 ANCHOR ASSEMBLY, MGS TYPE B | 1 EACH | $2,591 | $2,710 | $2,700 | $2,580 | $2,700 | $3,000 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $1,244 | $1,429 | $1,250 | $1,360 | $1,250 | $1,400 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 1 EACH | $2,591 | $2,783 | $2,400 | $2,650 | $2,400 | $2,700 |
| 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 1 EACH | $518 | $610 | $425 | $2,280 | $425 | $470 |
| 607E23000 FENCE, TYPE CLT | 527 FT | $31.09 | $34.70 | $21.00 | $37.00 | $21.00 | $23.00 |
| 608E10000 4" CONCRETE WALK | 3,302 SF | $8.49 | $8.75 | $9.25 | $14.00 | $10.03 | $11.00 |
| 608E52000 CURB RAMP | 588 SF | $27.83 | $22.00 | $21.00 | $25.00 | $32.26 | $22.00 |
| 608E53020 DETECTABLE WARNING | 36 SF | $166 | $45.00 | $50.00 | $40.00 | $50.00 | $58.00 |
| 622E25000 CONCRETE BARRIER END SECTION, TYPE D | 2 EACH | $6,045 | $4,250 | $6,000 | $4,800 | $6,374 | $5,000 |
| 623E40520 RIGHT-OF-WAY MONUMENT, TYPE B | 4 EACH | $1,175 | $1,577 | $650 | $410 | $940 | $500 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 5 SY | $221 | $175 | $250 | $200 | $311 | $175 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $77.73 | $79.00 | $200 | $135 | $60.00 | $135 |
| 659E10000 SEEDING AND MULCHING | 6,806 SY | $1.35 | $1.40 | $2.50 | $1.34 | $1.60 | $2.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 341 SY | $1.35 | $1.40 | $3.00 | $1.34 | $1.60 | $1.50 |
| 659E15000 INTER-SEEDING | 341 SY | $1.35 | $1.40 | $3.00 | $1.00 | $1.00 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.95 TON | $788 | $800 | $2,000 | $900 | $850 | $900 |
| 659E31000 LIME | 1.41 ACRE | $51.82 | $52.75 | $10.00 | $75.00 | $35.00 | $75.00 |
| 659E35000 WATER | 39 MGAL | $31.09 | $31.75 | $20.00 | $1.00 | $1.00 | $1.00 |
| 670E00700 DITCH EROSION PROTECTION | 2,795 SY | $4.15 | $4.25 | $2.50 | $3.10 | $1.80 | $4.00 |
| 670E00720 DITCH EROSION PROTECTION MAT, TYPE B | 289 SY | $4.15 | $4.25 | $3.50 | $4.80 | $1.80 | $4.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $2,591 | $4,150 | $3,500 | $2,500 | $2,345 | $3,000 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $3,109 | $7,850 | $22,000 | $9,000 | $5,820 | $10,000 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $8,291 | $9,150 | $10,000 | $8,000 | $6,783 | $8,000 |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 0.8 CY | $4,653 | $2,765 | $4,000 | $5,000 | $4,434 | $6,500 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 200 FT | $16.58 | $23.00 | $16.00 | $27.00 | $58.50 | $26.00 |
| 605E14000 6" BASE PIPE UNDERDRAINS | 1,699 FT | $16.58 | $21.00 | $16.00 | $20.00 | $31.02 | $20.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 100 FT | $31.33 | $26.00 | $25.00 | $43.00 | $59.38 | $36.00 |
| 611E00900 6" CONDUIT, TYPE B-707.33 | 100 FT | $40.19 | $32.00 | $7.00 | $43.00 | $70.42 | $36.00 |
| 611E01500 6" CONDUIT, TYPE F-707.33 | 200 FT | $40.13 | $32.00 | $5.00 | $43.00 | $65.62 | $36.00 |
| 611E04400 12" CONDUIT, TYPE B-706.02 | 436 FT | $68.66 | $91.00 | $110 | $145 | $153 | $118 |
| 611E04600 12" CONDUIT, TYPE C-706.02 | 100 FT | $89.17 | $88.00 | $105 | $142 | $136 | $60.00 |
| 611E07400 18" CONDUIT, TYPE B-706.02 | 89 FT | $136 | $140 | $175 | $205 | $216 | $150 |
| 611E07600 18" CONDUIT, TYPE C-706.02 | 12 FT | $248 | $160 | $300 | $340 | $2,032 | $240 |
| 611E98150 CATCH BASIN, NO. 3 | 2 EACH | $3,782 | $4,035 | $4,500 | $6,000 | $3,705 | $4,100 |
| 611E98470 CATCH BASIN, NO. 2-2B | 1 EACH | $2,302 | $1,500 | $2,500 | $3,000 | $1,600 | $2,200 |
| 611E99574 MANHOLE, NO. 3 | 2 EACH | $4,125 | $3,850 | $6,500 | $6,000 | $8,444 | $7,000 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 7 EACH | $473 | $500 | $425 | $515 | $721 | $522 |
| 611E99900 DRAINAGE STRUCTURE, MISC.: FERNCO COUPLER WITH SHE | 2 EACH | $1,247 | $1,275 | $800 | $1,160 | $1,228 | $800 |
| 611E05900 15" CONDUIT, TYPE B-706.02 | 44 FT | $92.75 | $122 | $120 | $195 | $197 | $102 |
| 407E20000 NON-TRACKING TACK COAT | 109 GAL | $5.61 | $8.50 | $1.00 | $5.00 | $5.00 | $1.00 |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 44 CY | $684 | $469 | $400 | $610 | $610 | $445 |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (50 CY | $600 | $412 | $350 | $535 | $535 | $388 |
| 609E26000 CURB, TYPE 6 | 74 FT | $36.56 | $61.00 | $42.00 | $54.00 | $48.58 | $52.00 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 6 EACH | $322 | $337 | $144 | $120 | $144 | $159 |
| 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE | 2,613 FT | $1.67 | $1.75 | $3.80 | $3.50 | $3.80 | $4.00 |
| 625E25400 CONDUIT, 2", 725.04 | 785 FT | $13.09 | $13.66 | $14.65 | $33.00 | $14.65 | $16.00 |
| 625E25500 CONDUIT, 3", 725.04 | 66 FT | $28.88 | $30.15 | $31.35 | $45.00 | $31.35 | $35.00 |
| 625E29000 TRENCH | 851 FT | $22.65 | $23.65 | $11.90 | $10.00 | $11.90 | $13.00 |
| 625E30706 PULL BOX, 725.08, 24" | 3 EACH | $844 | $881 | $1,290 | $1,500 | $1,290 | $1,425 |
| 625E31506 PULL BOX REMOVED AND REPLACED | 1 EACH | $503 | $526 | $530 | $1,800 | $530 | $580 |
| 625E31510 PULL BOX REMOVED | 3 EACH | $352 | $368 | $221 | $250 | $221 | $245 |
| 621E00100 RPM | 143 EACH | $57.00 | $57.76 | $55.00 | $55.00 | $55.00 | $60.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 143 EACH | $12.65 | $15.76 | $15.00 | $22.00 | $17.93 | $22.00 |
| 625E32000 GROUND ROD | 1 EACH | $126 | $131 | $255 | $325 | $255 | $285 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 182 FT | $16.24 | $16.81 | $16.00 | $16.00 | $16.00 | $18.00 |
| 630E06400 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, S4X7.7 | 28 FT | $29.54 | $47.26 | $39.25 | $45.00 | $39.25 | $44.00 |
| 630E08004 ONE WAY SUPPORT, NO. 3 POST | 112 FT | $16.24 | $17.34 | $18.00 | $16.50 | $18.00 | $20.00 |
| 630E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION | 2 EACH | $365 | $667 | $390 | $635 | $390 | $430 |
| 630E72340 OVERHEAD SIGN SUPPORT, TYPE TC-12.31, DESIGN 12 | 1 EACH | $36,274 | $50,243 | $40,000 | $47,850 | $40,000 | $40,000 |
| 630E79100 SIGN HANGER ASSEMBLY, MAST ARM | 10 EACH | $441 | $415 | $355 | $395 | $355 | $390 |
| 630E80100 SIGN, FLAT SHEET | 334 SF | $18.72 | $17.35 | $20.25 | $16.50 | $20.25 | $22.00 |
| 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET | 30 SF | $25.91 | $25.00 | $48.00 | $23.80 | $48.00 | $53.00 |
| 630E80224 SIGN, OVERHEAD EXTRUSHEET | 160 SF | $27.98 | $24.70 | $51.00 | $23.50 | $51.00 | $55.00 |
| 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION | 2 EACH | $518 | $1,024 | $1,200 | $975 | $1,200 | $1,300 |
| 630E84510 RIGID OVERHEAD SIGN SUPPORT FOUNDATION | 1 EACH | $12,437 | $8,846 | $7,890 | $8,425 | $7,890 | $8,700 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 2 EACH | $22.67 | $26.30 | $15.00 | $25.00 | $15.00 | $16.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 23 EACH | $30.23 | $21.25 | $25.00 | $20.00 | $25.00 | $27.00 |
| 630E87400 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL | 1 EACH | $778 | $400 | $175 | $380 | $175 | $190 |
| 630E87520 REMOVAL OF POLE MOUNTED SIGN AND REERECTION | 25 EACH | $147 | $205 | $110 | $195 | $110 | $120 |
| 630E89706 REMOVAL OF OVERHEAD SIGN SUPPORT AND DISPOSAL, TYP | 3 EACH | $3,109 | $1,969 | $1,400 | $1,875 | $1,400 | $1,550 |
| 642E50000 PAVEMENT MARKING, MISC.: BLACK CONTRAST | 1.11 MILE | $1,969 | $1,996 | $1,900 | $1,900 | $1,900 | $2,100 |
| 644E00104 EDGE LINE, 6" | 1.2 MILE | $3,316 | $3,361 | $3,200 | $3,200 | $3,200 | $3,500 |
| 644E00204 LANE LINE, 6" | 1.11 MILE | $2,073 | $2,105 | $2,000 | $2,000 | $2,000 | $2,200 |
| 644E00300 CENTER LINE | 0.08 MILE | $4,249 | $4,310 | $4,100 | $4,100 | $4,100 | $4,500 |
| 644E00400 CHANNELIZING LINE, 8" | 963 FT | $1.81 | $1.90 | $1.75 | $1.75 | $1.75 | $2.00 |
| 644E00500 STOP LINE | 44 FT | $7.25 | $7.40 | $7.00 | $7.00 | $7.00 | $8.00 |
| 644E00620 CROSSWALK LINE, 12" | 550 FT | $4.15 | $4.25 | $4.00 | $4.00 | $4.00 | $4.00 |
| 644E01300 LANE ARROW | 15 EACH | $98.46 | $99.80 | $95.00 | $95.00 | $95.00 | $105 |
| 644E30000 REMOVAL OF PAVEMENT MARKING | 765 FT | $2.07 | $2.15 | $2.00 | $2.00 | $2.00 | $2.00 |
| 644E30020 REMOVAL OF PAVEMENT MARKING | 1 EACH | $104 | $106 | $100 | $100 | $100 | $111 |
| 646E10010 EDGE LINE, 6" | 0.55 MILE | $6,529 | $6,616 | $6,300 | $6,300 | $6,300 | $7,000 |
| 646E10310 CHANNELIZING LINE, 12" | 1,026 FT | $5.70 | $5.80 | $5.50 | $5.50 | $5.50 | $6.00 |
| 646E10400 STOP LINE | 49 FT | $20.73 | $21.25 | $20.00 | $20.00 | $20.00 | $22.00 |
| 646E10620 CHEVRON MARKING | 110 FT | $18.65 | $18.95 | $18.00 | $18.00 | $18.00 | $20.00 |
| 646E20300 LANE ARROW | 12 EACH | $124 | $127 | $120 | $120 | $120 | $130 |
| 646E20320 WRONG WAY ARROW | 3 EACH | $207 | $215 | $200 | $200 | $200 | $220 |
| 646E20504 DOTTED LINE, 6" | 794 FT | $1.55 | $1.60 | $1.50 | $1.50 | $1.50 | $1.50 |
| 625E25408 CONDUIT, 2", 725.051 | 320 FT | $1.31 | $1.40 | $6.10 | $12.00 | $6.10 | $7.00 |
| 625E25504 CONDUIT, 3", 725.051 | 109 FT | $2.41 | $2.55 | $9.30 | $15.00 | $9.30 | $10.00 |
| 625E25604 CONDUIT, 4", 725.051 | 70 FT | $3.32 | $3.50 | $9.15 | $21.00 | $9.15 | $10.00 |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04 2" CONDUIT | 297 FT | $35.23 | $36.76 | $50.25 | $50.00 | $50.25 | $55.00 |
| 625E25906 CONDUIT, JACKED OR DRILLED, 725.051, 4" CONDUIT | 602 FT | $55.36 | $57.76 | $47.50 | $55.00 | $47.50 | $52.00 |
| 625E29000 TRENCH | 371 FT | $22.65 | $23.64 | $11.90 | $10.00 | $11.90 | $13.00 |
| 625E29400 TRENCH IN PAVED AREA | 36 FT | $32.21 | $33.61 | $50.00 | $48.00 | $50.00 | $55.00 |
| 625E30700 PULL BOX, 725.08, 18" | 10 EACH | $646 | $674 | $1,080 | $1,325 | $1,080 | $1,200 |
| 625E30706 PULL BOX, 725.08, 24" | 2 EACH | $844 | $881 | $1,240 | $1,550 | $1,240 | $1,350 |
| 625E31510 PULL BOX REMOVED | 11 EACH | $352 | $368 | $221 | $250 | $221 | $250 |
| 625E32000 GROUND ROD | 16 EACH | $126 | $131 | $255 | $325 | $255 | $280 |
| 632E05006 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 13 EACH | $805 | $841 | $1,163 | $1,000 | $1,163 | $1,300 |
| 632E05064 VEHICULAR SIGNAL HEAD, (LED), 4-SECTION, 12" LENS, | 2 EACH | $996 | $1,040 | $1,372 | $1,200 | $1,372 | $1,525 |
| 632E05086 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 2 EACH | $1,592 | $1,661 | $1,923 | $1,700 | $1,923 | $2,130 |
| 632E20731 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN, | 12 EACH | $438 | $457 | $783 | $875 | $783 | $870 |
| 632E26000 PEDESTRIAN PUSHBUTTON | 12 EACH | $147 | $153 | $447 | $325 | $447 | $500 |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 2,524 FT | $1.03 | $1.10 | $2.70 | $3.00 | $2.70 | $3.00 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 2,684 FT | $1.41 | $1.50 | $3.30 | $3.50 | $3.30 | $3.50 |
| 632E64020 PEDESTAL FOUNDATION | 10 EACH | $1,208 | $1,261 | $1,115 | $1,700 | $1,115 | $1,240 |
| 632E68300 POWER CABLE, 3 CONDUCTOR, NO. 6 AWG | 2,425 FT | $3.47 | $3.63 | $4.90 | $6.00 | $4.90 | $5.00 |
| 632E70000 POWER SERVICE | 2 EACH | $2,869 | $2,993 | $5,080 | $6,000 | $5,080 | $5,600 |
| 632E70400 CONDUIT RISER, 2" DIAMETER | 2 EACH | $876 | $914 | $870 | $1,900 | $870 | $950 |
| 632E72140 SIGNAL SUPPORT, TYPE TC-81.22, DESIGN 13 | 2 EACH | $19,723 | $20,575 | $22,320 | $21,000 | $22,320 | $24,000 |
| 632E90000 PEDESTAL, 11', TRANSFORMER BASE | 10 EACH | $1,066 | $1,112 | $1,025 | $1,600 | $1,025 | $1,150 |
| 632E90100 REMOVAL OF TRAFFIC SIGNAL INSTALLATION | 2 EACH | $6,039 | $6,315 | $6,100 | $3,800 | $6,100 | $6,750 |
| 633E65511 CABINET, TYPE TS-2, AS PER PLAN | 2 EACH | $19,952 | $20,815 | $19,405 | $18,000 | $19,405 | $21,500 |
| 633E67100 CABINET FOUNDATION | 2 EACH | $2,768 | $2,888 | $1,600 | $4,000 | $1,600 | $1,750 |
| 633E67200 CONTROLLER WORK PAD | 2 EACH | $1,007 | $1,051 | $1,115 | $2,000 | $1,115 | $1,250 |
| 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS | 2 EACH | $5,679 | $5,924 | $5,680 | $5,000 | $5,680 | $6,300 |
| 633E99000 CONTROLLER ITEM, MISC.: REUSE OF SPREAD SPECTRUM R | 1 EACH | $2,270 | $2,368 | $3,880 | $2,850 | $3,880 | $4,300 |
| 809E60040 CCTV IP-CAMERA SYSTEM, QUAD MULTI-VIEW FIXED WITH | 2 EACH | $10,635 | $11,095 | $11,540 | $11,100 | $11,540 | $12,800 |
| 809E69123 ATC CONTROLLER, AS PER PLAN | 2 EACH | $6,451 | $6,730 | $6,340 | $5,000 | $6,340 | $7,000 |
| 512E74500 REMOVAL OF EXISTING PAVEMENT MARKING | 130 FT | $10.36 | $15.00 | $10.00 | $10.00 | $10.00 | $11.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 80 HOUR | $127 | $88.00 | $105 | $130 | $140 | $130 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,091 | $3,625 | $2,050 | $6,000 | $3,632 | $2,250 |
| 614E12800 WORK ZONE RAISED PAVEMENT MARKER | 72 EACH | $12.52 | $12.70 | $12.25 | $55.00 | $47.69 | $13.50 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 3 SNMT | $982 | $996 | $1,000 | $1,700 | $1,150 | $1,050 |
| 614E20110 WORK ZONE LANE LINE, CLASS I, 6", 642 PAINT | 1.1 MILE | $373 | $1,429 | $1,360 | $1,360 | $1,360 | $1,500 |
| 614E22100 WORK ZONE EDGE LINE, CLASS I, 4", 642 PAINT | 0.38 MILE | $1,026 | $1,040 | $990 | $990 | $990 | $1,100 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 1.09 MILE | $1,409 | $1,429 | $1,360 | $1,360 | $1,360 | $1,500 |
| 616E10000 WATER | 10 MGAL | $142 | $80.00 | $25.00 | $200 | $178 | $5.00 |
| 626E00102 BARRIER REFLECTOR, TYPE 1 (ONE WAY) | 42 EACH | $12.06 | $14.00 | $15.00 | $26.00 | $35.31 | $13.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $12,812 | $75,555 | $50,000 | $22,060 | $19,176 | $70,000 |
| 108E30000 CPM PROGRESS SCHEDULE SHORT DURATION PROJECTS | 1 LS | $5,281 | $40,450 | $12,500 | $16,000 | $6,991 | $17,000 |
| 619E16010 FIELD OFFICE, TYPE B | 12 MNTH | $2,641 | $4,250 | $2,750 | $2,000 | $2,264 | $2,900 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 452E16020 13" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 7,034 SY | $125.09 | $880k | 26% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $138,717 | $139k | 4% |
| 632E81700 COMBINATION SIGNAL SUPPORT, MISC.: TC-12.31 DESIGN | 2 EACH | $61,903 | $124k | 4% |
| 304E20000 AGGREGATE BASE | 1,507 CY | $72.96 | $110k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 3% |
| 622E41011 PORTABLE BARRIER, 50", AS PER PLAN | 1,755 FT | $50.13 | $88k | 3% |
| 203E10000 EXCAVATION | 4,963 CY | $17.37 | $86k | 3% |
| 202E23000 PAVEMENT REMOVED | 5,834 SY | $14.67 | $86k | 3% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 164 CY | $459.93 | $75k | 2% |
| 659E00300 TOPSOIL | 1,100 CY | $64.26 | $71k | 2% |