ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 62 more items below.
| Item | Quantity | R1John R Jurgensen Company | R2Barrett Paving Materials INC | % of bid |
|---|---|---|---|---|
| 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 3,165 CY | $284 | $280 | 40% |
| 253E02000 PAVEMENT REPAIR | 760 CY | $566 | $495 | 19% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" | 75,947 SY | $2.45 | $2.95 | 8% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $150,060 | $255,000 | 7% |
| 624E10000 MOBILIZATION | 1 LS | $112,500 | $40,000 | 5% |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 75 EACH | $1,207 | $700 | 4% |
| 608E52000 CURB RAMP | 2,806 SF | $20.00 | $20.00 | 2% |
| 202E30000 WALK REMOVED | 3,650 SF | $12.00 | $12.00 | 2% |
| 407E20000 NON-TRACKING TACK COAT | 6,836 GAL | $5.00 | $4.00 | 2% |
| 617E10100 COMPACTED AGGREGATE | 201 CY | $160 | $185 | 1% |
| 623E39500 MONUMENT ASSEMBLY ADJUSTED TO GRADE | 32 EACH | $995 | $800 | 1% |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 25 EACH | $1,207 | $2,000 | 1% |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 25 EACH | $1,174 | $700 | 1% |
| 608E10000 4" CONCRETE WALK | 1,404 SF | $20.00 | $20.00 | 1% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 200 HOUR | $137 | $90.00 | 1% |
| 644E00104 EDGE LINE, 6" | 5.57 MILE | $3,645 | $3,645 | 1% |
| 621E00100 RPM | 550 EACH | $31.95 | $31.95 | 1% |
| 644E00300 CENTER LINE | 3.24 MILE | $4,930 | $4,930 | 1% |
| 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE | 5 EACH | $2,544 | $4,000 | 1% |
| 611E99660 MANHOLE RECONSTRUCTED TO GRADE | 5 EACH | $2,402 | $3,000 | 1% |
| Item | Quantity | R1John R Jurgensen Company | R2Barrett Paving Materials INC |
|---|---|---|---|
| 202E30001 WALK REMOVED, AS PER PLAN | 812 SF | $12.00 | $12.00 |
| 202E32000 CURB REMOVED | 609 FT | $17.00 | $17.00 |
| 202E32500 CURB AND GUTTER REMOVED | 279 FT | $20.00 | $20.00 |
| 203E10000 EXCAVATION | 5 CY | $200 | $250 |
| 608E53020 DETECTABLE WARNING | 88 SF | $50.00 | $50.00 |
| 659E00300 TOPSOIL | 8 CY | $275 | $350 |
| 659E10000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 70 SY |
| $15.00 |
| $40.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.01 TON | $1,000 | $1,000 |
| 659E31000 LIME | 0.01 ACRE | $1,000 | $100 |
| 659E35000 WATER | 0.39 MGAL | $10.00 | $1.00 |
| 832E30000 EROSION CONTROL | 2,000 EACH | $1.00 | $1.00 |
| 253E02001 PAVEMENT REPAIR, AS PER PLAN | 34 CY | $300 | $800 |
| 254E01600 PATCHING PLANED SURFACE | 764 SY | $4.52 | $5.00 |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 145 FT | $50.00 | $50.00 |
| 609E18000 COMBINATION CURB AND GUTTER, TYPE 3 | 25 FT | $50.00 | $50.00 |
| 609E26000 CURB, TYPE 6 | 231 FT | $40.00 | $40.00 |
| 617E20000 SHOULDER PREPARATION | 3,614 SY | $2.06 | $5.00 |
| 617E25000 WATER | 4 MGAL | $7.85 | $1.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 550 EACH | $12.78 | $10.00 |
| 644E00204 LANE LINE, 6" | 2.31 MILE | $1,780 | $1,780 |
| 644E00404 CHANNELIZING LINE, 12" | 4,304 FT | $2.00 | $2.00 |
| 644E00500 STOP LINE | 637 FT | $4.85 | $4.85 |
| 644E00630 CROSSWALK LINE, 24" | 1,617 FT | $4.75 | $4.75 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 1,663 FT | $4.60 | $4.60 |
| 644E00720 CHEVRON MARKING | 67 FT | $4.60 | $4.60 |
| 644E00900 ISLAND MARKING | 164 SF | $4.45 | $4.45 |
| 644E01100 SCHOOL SYMBOL MARKING, 72" | 4 EACH | $450 | $450 |
| 644E01200 PARKING LOT STALL MARKING | 226 FT | $1.75 | $1.75 |
| 644E01300 LANE ARROW | 48 EACH | $130 | $130 |
| 644E01350 LANE REDUCTION ARROW | 2 EACH | $335 | $335 |
| 644E01370 TWO WAY LEFT TURN ARROW | 2 EACH | $250 | $250 |
| 644E01400 WORD ON PAVEMENT, 72" | 4 EACH | $275 | $275 |
| 644E01510 DOTTED LINE, 6" | 246 FT | $1.95 | $1.95 |
| 632E26500 DETECTOR LOOP | 7 EACH | $1,400 | $1,400 |
| 632E27200 LOOP DETECTOR TIE IN | 7 EACH | $100 | $100 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 12 SNMT | $950 | $950 |
| 614E20010 WORK ZONE LANE LINE, CLASS I, 6" | 2.31 MILE | $195 | $195 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 2.31 MILE | $150 | $150 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 3.24 MILE | $750 | $750 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 3.24 MILE | $550 | $550 |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6" | 5.57 MILE | $525 | $525 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 5.57 MILE | $315 | $315 |
| 614E23010 WORK ZONE CHANNELIZING LINE, CLASS I, 12" | 4,304 FT | $0.60 | $0.60 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 4,304 FT | $0.55 | $0.55 |
| 614E24000 WORK ZONE DOTTED LINE, CLASS I | 246 FT | $0.50 | $0.50 |
| 614E24612 WORK ZONE DOTTED LINE, CLASS III, 6", 642 PAINT | 246 FT | $0.45 | $0.45 |
| 614E25000 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS I | 1,663 FT | $2.25 | $2.25 |
| 614E25620 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS III, 642 | 1,663 FT | $2.20 | $2.20 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 637 FT | $2.50 | $2.50 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 637 FT | $2.45 | $2.45 |
| 614E27010 WORK ZONE CROSSWALK LINE, CLASS I, 12" | 1,617 FT | $2.00 | $2.00 |
| 614E27260 WORK ZONE CROSSWALK LINE, CLASS III, 24", 642 PAIN | 1,617 FT | $2.20 | $2.20 |
| 614E30000 WORK ZONE ARROW, CLASS I | 48 EACH | $55.00 | $55.00 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT | 48 EACH | $50.00 | $50.00 |
| 614E31000 WORK ZONE WORD ON PAVEMENT, 72", CLASS I | 4 EACH | $65.00 | $65.00 |
| 614E31620 WORK ZONE WORD ON PAVEMENT, 72", CLASS III, 642 PA | 4 EACH | $60.00 | $60.00 |
| 614E31700 WORK ZONE SCHOOL SYMBOL MARKING, 72", CLASS I | 4 EACH | $350 | $350 |
| 614E31740 WORK ZONE SCHOOL SYMBOL MARKING, 72", CLASS III, 6 | 4 EACH | $345 | $345 |
| 614E32700 WORK ZONE ISLAND MARKING, CLASS I | 164 SF | $2.00 | $2.00 |
| 614E32800 WORK ZONE ISLAND MARKING, CLASS III, 642 PAINT | 164 SF | $1.95 | $1.95 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $9,653 | $8,980 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $7,436 | $24,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 3,165 CY | $283.61 | $898k | 36% |
| 253E02000 PAVEMENT REPAIR | 760 CY | $566.34 | $430k | 17% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" | 75,947 SY | $2.45 | $186k | 8% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $150,060 | $150k | 6% |
| 624E10000 MOBILIZATION | 1 LS | $112,500 | $113k | 5% |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 75 EACH | $1,207 | $91k | 4% |
| 608E52000 CURB RAMP | 2,806 SF | $20 | $56k | 2% |
| 202E30000 WALK REMOVED | 3,650 SF | $12 | $44k | 2% |
| 407E20000 NON-TRACKING TACK COAT | 6,836 GAL | $5 | $34k | 1% |
| 617E10100 COMPACTED AGGREGATE | 201 CY | $160.43 | $32k | 1% |