ROS-US 35-23.67
ROS County · est $0.8M
Bid dateThursday, October 9—
ROS County · est $0.8M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 8 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Complete General Construction Company | R3Alan Stone CO INC | R4Eagle Bridge CO | R5Allard Excavation LLC | R6Sunesis Construction CO | R7Craig Edward Susany INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 504E11101 STEEL SHEET PILING LEFT IN PLACE, AS PER PLAN | 14,000 SF | $32.25 | $38.00 | $35.00 | $37.25 | $43.50 | $43.43 | $63.00 | 77% |
| 624E10000 MOBILIZATION | 1 LS | $29,410 | $25,000 | $52,000 | $37,500 | $25,000 | $38,008 | $40,000 | 5% |
| Item | Quantity | R1Shelly & Sands INC | R2Complete General Construction Company | R3Alan Stone CO INC | R4Eagle Bridge CO | R5Allard Excavation LLC | R6Sunesis Construction CO | R7Craig Edward Susany INC |
|---|---|---|---|---|---|---|---|---|
| 659E14000 REPAIR SEEDING AND MULCHING | 224 SY | $0.90 | $0.90 | $6.00 | $3.00 | $0.90 | $2.20 | $5.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.63 TON | $1,250 | $1,250 | $670 | $750 | $1,250 | $1,400 | $500 |
| 659E31000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1 LS |
| $18,000 |
| $33,000 |
| $30,000 |
| $45,000 |
| $8,200 |
| $10,238 |
| $10,000 |
| 3% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 790 FT | $16.50 | $38.00 | $25.00 | $40.00 | $32.75 | $42.94 | $39.00 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $12,100 | $13,000 | $18,000 | $14,000 | $16,100 | $6,407 | $20,000 | 2% |
| 203E20000 EMBANKMENT | 252 CY | $45.00 | $39.00 | $55.00 | $38.00 | $49.60 | $40.42 | $150 | 2% |
| 606E16000 GUARDRAIL REBUILT | 350 FT | $25.00 | $18.00 | $30.00 | $18.00 | $18.00 | $18.00 | $24.00 | 1% |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6", 740.06 | 0.41 MILE | $16,305 | $9,895 | $14,000 | $10,000 | $16,305 | $16,305 | $12,000 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $6,000 | $10,000 | $10,000 | $3,000 | $9,500 | $8,550 | $11,000 | 1% |
| 644E00204 LANE LINE, 6" | 0.41 MILE | $13,420 | $5,850 | $16,000 | $13,420 | $13,420 | $13,420 | $11,000 | 1% |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 1% |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 6 SNMT | $675 | $600 | $710 | $750 | $1,500 | $1,495 | $1,000 | 1% |
| 659E10000 SEEDING AND MULCHING | 4,463 SY | $0.90 | $0.90 | $1.50 | $2.00 | $0.90 | $2.22 | $1.90 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,300 | $6,000 | $8,500 | $15,000 | $6,213 | $5,028 | $40,000 | 1% |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,200 | $4,000 | $2,600 | $2,300 | $2,000 | $2,281 | $2,300 | 0% |
| 623E40900 MONUMENT, MISC.: WALL AS-BUILT SURVEY | 1 EACH | $2,000 | $4,000 | $8,000 | $7,500 | $4,400 | $9,500 | $9,500 | 0% |
| 203E10000 EXCAVATION | 99 CY | $20.00 | $34.00 | $20.00 | $12.00 | $28.50 | $7.42 | $20.00 | 0% |
| 202E38200 GUARDRAIL REMOVED FOR REUSE | 350 FT | $5.00 | $9.50 | $6.00 | $9.50 | $9.50 | $9.50 | $6.00 | 0% |
| 209E60200 LINEAR GRADING | 10 STA | $125 | $900 | $1,100 | $200 | $800 | $147 | $100 | 0% |
| 614E24000 WORK ZONE DOTTED LINE, CLASS I, 740.06 | 840 FT | $1.00 | $1.75 | $1.00 | $1.50 | $1.00 | $1.00 | $2.00 | 0% |
| 0.93 ACRE |
| $150 |
| $150 |
| $960 |
| $5.00 |
| $150 |
| $450 |
| $30.00 |
| 659E35000 WATER | 25 MGAL | $1.00 | $1.00 | $120 | $1.00 | $1.00 | $1.00 | $1.00 |
| 626E00112 BARRIER REFLECTOR, TYPE 3 (1 WAY) | 5 EACH | $12.00 | $20.00 | $15.00 | $15.00 | $35.00 | $12.34 | $14.00 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (ONE WAY) | 17 EACH | $6.00 | $20.00 | $40.00 | $10.00 | $15.00 | $12.89 | $17.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 17 EACH | $16.00 | $25.00 | $50.00 | $15.00 | $15.00 | $20.54 | $17.00 |
| 616E10000 WATER | 1 MGAL | $72.00 | $165 | $1.00 | $10.00 | $1.00 | $11.93 | $1.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 504E11101 STEEL SHEET PILING LEFT IN PLACE, AS PER PLAN | 14,000 SF | $32.25 | $452k | 76% |
| 624E10000 MOBILIZATION | 1 LS | $29,410 | $29k | 5% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $18,000 | $18k | 3% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 790 FT | $16.5 | $13k | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $12,100 | $12k | 2% |
| 203E20000 EMBANKMENT | 252 CY | $45 | $11k | 2% |
| 606E16000 GUARDRAIL REBUILT | 350 FT | $25 | $9k | 1% |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6", 740.06 | 0.41 MILE | $16,305 | $7k | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $6,000 | $6k | 1% |
| 644E00204 LANE LINE, 6" | 0.41 MILE | $13,420 | $6k | 1% |