D03-BH FY2026(A)
D03 County · est $0.4M
Bid dateThursday, October 23—
D03 County · est $0.4M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 14 more items below.
| Item | Quantity | R1Bcc Ohio INC | R2Ohio Concrete Maintenance LLC | R3Catts Construction INC | R4Complete General Construction Company | % of bid |
|---|---|---|---|---|---|---|
| 607E39901 VANDAL PROTECTION FENCE, 6' STRAIGHT, COATED FABRI | 444 FT | $151 | $149 | $226 | $143 | 20% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 432 SY | $104 | $93.00 | $86.00 | $160 | 14% |
| 847E10100 LATEX MODIFIED CONCRETE OVERLAY (1.5") | 213 SY | $190 | $250 | $148 | $225 | 12% |
| 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 432 SY | $77.34 | $108 | $138 | $110 | 10% |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $4,279 | $1,000 | $2,500 | $4,263 | 8% |
| 517E75600 DEEP BEAM BRIDGE RETROFIT RAILING | 125 FT | $128 | $125 | $196 | $118 |
| Item | Quantity | R1Bcc Ohio INC | R2Ohio Concrete Maintenance LLC | R3Catts Construction INC | R4Complete General Construction Company |
|---|---|---|---|---|---|
| 832E30000 EROSION CONTROL | 2,500 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 646E10010 EDGE LINE, 6" | 0.06 MILE | $40,215 | $42,000 | $68,600 | $57,505 |
| 646E10200 CENTER LINE | 0.03 MILE | $58,275 | $60,000 | $91,645 | $76,815 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 24 HOUR | $89.25 | $125 | $50.00 | $95.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 5% |
| 517E75600 DEEP BEAM BRIDGE RETROFIT RAILING | 125 FT | $128 | $125 | $196 | $118 | 5% |
| 614E12420 DETOUR SIGNING | 1 LS | $15,258 | $21,000 | $22,121 | $18,515 | 5% |
| 251E01031 PARTIAL DEPTH PAVEMENT REPAIR (442), AS PER PLAN | 4 CY | $3,435 | $2,000 | $1,022 | $950 | 4% |
| 625E33001 STRUCTURE GROUNDING SYSTEM, AS PER PLAN | 1 EACH | $8,280 | $15,000 | $10,737 | $15,000 | 3% |
| 847E20100 LATEX MODIFIED CONCRETE OVERLAY (VARIABLE THICKNES | 7 CY | $1,148 | $1,100 | $1,103 | $800 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $6,244 | $20,000 | $23,620 | $64,000 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $5,503 | $15,000 | $32,500 | $20,000 | 2% |
| 847E30400 EXISTING CONCRETE OVERLAY REMOVED (1.5") | 213 SY | $23.40 | $40.00 | $25.00 | $26.00 | 2% |
| 847E30000 TEST SLAB | 1 LS | $4,848 | $5,500 | $1,025 | $3,000 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,335 | $10,000 | $4,970 | $4,000 | 1% |
| 848E50000 HAND CHIPPING | 22 SY | $188 | $145 | $210 | $100 | 1% |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 126 FT | $23.84 | $35.00 | $47.00 | $16.75 | 1% |
| 847E30200 FULL DEPTH REPAIR | 2 CY | $1,406 | $1,000 | $1,220 | $2,000 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,640 | $4,000 | $300 | $7,000 | 1% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 2 SNMT | $840 | $1,200 | $1,480 | $1,245 |
| 516E31000 JOINT SEALER | 66 FT | $28.95 | $30.00 | $21.60 | $35.00 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 108 FT | $23.87 | $30.00 | $44.00 | $16.75 |
| 847E50000 HAND CHIPPING | 12 SY | $196 | $150 | $229 | $100 |
| 202E98200 REMOVAL MISC.: STEEL DRIP STRIP | 102 FT | $6.45 | $30.00 | $32.00 | $17.00 |
| 848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE | 7 CY | $368 | $400 | $281 | $300 |
| 848E50100 TEST SLAB | 1 LS | $2,463 | $500 | $500 | $1,500 |
| 202E11301 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 0.3 CY | $3,096 | $9,000 | $4,800 | $8,000 |
| 511E34448 CLASS QC2 CONCRETE, BRIDGE DECK (PARAPET) | 0.3 CY | $6,771 | $9,000 | $6,000 | $18,000 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 3 SY | $146 | $200 | $130 | $500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 607E39901 VANDAL PROTECTION FENCE, 6' STRAIGHT, COATED FABRI | 444 FT | $150.69 | $67k | 19% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 432 SY | $103.97 | $45k | 13% |
| 847E10100 LATEX MODIFIED CONCRETE OVERLAY (1.5") | 213 SY | $190.44 | $41k | 11% |
| 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 432 SY | $77.34 | $33k | 9% |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $4,279 | $26k | 7% |
| 517E75600 DEEP BEAM BRIDGE RETROFIT RAILING | 125 FT | $127.68 | $16k | 5% |
| 517E75600 DEEP BEAM BRIDGE RETROFIT RAILING | 125 FT | $127.68 | $16k | 5% |
| 614E12420 DETOUR SIGNING | 1 LS | $15,258 | $15k | 4% |
| 251E01031 PARTIAL DEPTH PAVEMENT REPAIR (442), AS PER PLAN | 4 CY | $3,435 | $14k | 4% |
| 625E33001 STRUCTURE GROUNDING SYSTEM, AS PER PLAN | 1 EACH | $8,280 | $8k | 2% |