WAR-SR 123-00.05 River St
WAR County · est $1.0M
Bid dateThursday, November 13—
WAR County · est $1.0M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 21 more items below.
| Item | Quantity | R1Fillmore Construction | R2Barrett Paving Materials INC | R3John R Jurgensen Company | % of bid |
|---|---|---|---|---|---|
| 253E02001 PAVEMENT REPAIR, AS PER PLAN (B) | 797 CY | $400 | $332 | $607 | 42% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (461 CY | $228 | $268 | $291 | 14% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 330 CY | $240 | $272 | $292 | 11% |
| 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE | 20 EACH | $2,500 | $2,100 | $2,543 | 7% |
| 608E52001 CURB RAMP, AS PER PLAN | 1,600 SF | $30.00 | $30.00 | $28.00 | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $30,000 | $20,000 | $35,967 | 4% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 3 | 9,422 SY | $2.00 |
| Item | Quantity | R1Fillmore Construction | R2Barrett Paving Materials INC | R3John R Jurgensen Company |
|---|---|---|---|---|
| 202E32500 CURB AND GUTTER REMOVED | 135 FT | $10.00 | $25.00 | $25.00 |
| 611E00406 4" CONDUIT, TYPE F | 11 FT | $80.00 | $85.00 | $108 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 76 FT | $15.50 | $15.50 | $15.50 |
| 630E80100 SIGN, FLAT SHEET | 28 SF | $16.00 | $16.00 | $16.00 |
| 644E00200 LANE LINE, 4" | 0.39 MILE | $3,179 | $2,200 | $2,200 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $4.15 |
| $3.90 |
| 3% |
| 253E02001 PAVEMENT REPAIR, AS PER PLAN (A) | 54 CY | $300 | $340 | $582 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $13,500 | $36,000 | $50,000 | 2% |
| 609E26000 CURB, TYPE 6 | 244 FT | $50.00 | $50.00 | $48.00 | 2% |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1.00 | $1.00 | $1.00 | 1% |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 197 FT | $50.00 | $55.00 | $51.75 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $7,500 | $1,760 | $5,031 | 1% |
| 202E30000 WALK REMOVED | 1,458 SF | $5.00 | $8.00 | $7.00 | 1% |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 13 EACH | $500 | $900 | $705 | 1% |
| 254E01600 PATCHING PLANED SURFACE | 944 SY | $5.00 | $9.00 | $4.50 | 1% |
| 407E20000 NON-TRACKING TACK COAT | 1,414 GAL | $3.00 | $4.50 | $5.00 | 1% |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 3 EACH | $1,000 | $1,300 | $1,207 | 0% |
| 608E10000 4" CONCRETE WALK | 140 SF | $20.00 | $15.00 | $12.50 | 0% |
| 202E32000 CURB REMOVED | 243 FT | $10.00 | $22.00 | $22.00 | 0% |
| 644E00400 CHANNELIZING LINE, 8" | 276 FT | $2.31 | $3.00 | $3.00 |
| 644E00500 STOP LINE | 112 FT | $10.56 | $10.00 | $10.00 |
| 644E00620 CROSSWALK LINE, 12" | 324 FT | $5.28 | $5.00 | $5.00 |
| 644E01300 LANE ARROW | 6 EACH | $214 | $157 | $157 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 8 HOUR | $100 | $95.00 | $139 |
| 614E20000 WORK ZONE LANE LINE, CLASS I, 4" | 0.39 MILE | $2,420 | $925 | $925 |
| 614E20550 WORK ZONE LANE LINE, CLASS III, 4", 642 PAINT | 0.39 MILE | $2,420 | $925 | $925 |
| 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, 8" | 276 FT | $0.84 | $1.75 | $1.75 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 276 FT | $0.84 | $1.75 | $1.75 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 112 FT | $6.00 | $5.75 | $5.75 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 112 FT | $6.00 | $5.75 | $5.75 |
| 614E27010 WORK ZONE CROSSWALK LINE, CLASS I, 12" | 324 FT | $3.00 | $2.90 | $2.90 |
| 614E27250 WORK ZONE CROSSWALK LINE, CLASS III, 12", 642 PAIN | 324 FT | $3.00 | $2.90 | $2.90 |
| 614E30000 WORK ZONE ARROW, CLASS I | 6 EACH | $59.00 | $69.00 | $69.00 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT | 6 EACH | $59.00 | $69.00 | $69.00 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1,500 | $2,000 | $3,036 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 253E02001 PAVEMENT REPAIR, AS PER PLAN (B) | 797 CY | $400 | $319k | 41% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (461 CY | $228 | $105k | 14% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 330 CY | $240 | $79k | 10% |
| 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE | 20 EACH | $2,500 | $50k | 7% |
| 608E52001 CURB RAMP, AS PER PLAN | 1,600 SF | $30 | $48k | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $30,000 | $30k | 4% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 3 | 9,422 SY | $2 | $19k | 2% |
| 253E02001 PAVEMENT REPAIR, AS PER PLAN (A) | 54 CY | $300 | $16k | 2% |
| 624E10000 MOBILIZATION | 1 LS | $13,500 | $14k | 2% |
| 609E26000 CURB, TYPE 6 | 244 FT | $50 | $12k | 2% |