HAM-US 50-03.76/19.03
HAM County · est $10M
Bid dateThursday, December 4—
HAM County · est $10M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 36 more items below.
| Item | Quantity | R1Corrosion Resistance LTD | R2Legend Painting INC | R3Euro Paint LLC | R4Elite Contractors INC | R5Vimas Painting Company INC | R6Apbn INC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 514E00101 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL, | 1 LS | $1,525,000 | $1,300,000 | $2,285,839 | $3,000,000 | $3,000,000 | $2,125,000 | 21% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 137,916 SF | $7.30 | $8.00 | $9.25 | $9.00 | $10.00 | $15.00 | 14% |
| 514E00401 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, AS P | 1 LS | $830,000 | $595,806 | $507,964 | $386,000 |
| Item | Quantity | R1Corrosion Resistance LTD | R2Legend Painting INC | R3Euro Paint LLC | R4Elite Contractors INC | R5Vimas Painting Company INC | R6Apbn INC |
|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $20,000 | $10,000 | $20,000 | $1.00 | $20,000 | $20,000 |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 614E11111 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 200 HOUR | $100 | $100 | $80.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $800,000 |
| $1,000,000 |
| 11% |
| 514E00301 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 1 LS | $700,000 | $650,000 | $507,964 | $387,000 | $800,000 | $1,000,000 | 10% |
| 514E00201 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 1 LS | $555,000 | $500,000 | $507,964 | $387,000 | $1,000,000 | $1,000,000 | 8% |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 2,592 SF | $160 | $199 | $160 | $196 | $180 | $160 | 6% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 4,157 SF | $78.00 | $45.00 | $46.75 | $40.00 | $50.00 | $15.00 | 4% |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 137,916 SF | $2.35 | $3.00 | $2.06 | $2.00 | $3.50 | $4.00 | 4% |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 137,916 SF | $2.00 | $2.00 | $2.06 | $2.00 | $3.50 | $4.00 | 4% |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 137,916 SF | $2.00 | $3.00 | $2.06 | $2.00 | $3.50 | $4.00 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $190,000 | $278,990 | $212,450 | $100,000 | $550,000 | $607,400 | 3% |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 6,149 SY | $30.25 | $35.00 | $35.00 | $45.00 | $25.00 | $75.00 | 3% |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 6,149 SY | $29.00 | $50.00 | $35.00 | $40.00 | $35.00 | $75.00 | 2% |
| 517E76302 RAILING, MISC.: 4.5" O.D. ALUMINUM TUBE WITH ANCHO | 897 EACH | $138 | $138 | $138 | $138 | $140 | $137 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $102,000 | $60,408 | $39,974 | $100,000 | $160,000 | $409,879 | 1% |
| 844E20000 GALVANIC ANODE PROTECTION | 3,216 EACH | $29.00 | $40.00 | $29.00 | $43.25 | $35.00 | $29.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $80,000 | $90,000 | $105,000 | $100,000 | $150,000 | $100,000 | 1% |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 467 SF | $160 | $199 | $160 | $196 | $180 | $160 | 1% |
| 513E95030 STRUCTURAL STEEL, MISC.: LACING BAR REPAIRS | 32 EACH | $1,610 | $1,301 | $1,301 | $1,301 | $1,600 | $1,301 | 1% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 2,320 FT | $20.59 | $20.59 | $20.59 | $20.59 | $21.00 | $20.59 | 1% |
| $100 |
| $60.00 |
| $150 |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $1,943 | $1,943 | $1,943 | $1,943 | $2,000 | $1,943 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (ONE-WAY) | 52 EACH | $11.91 | $11.91 | $11.91 | $11.91 | $12.00 | $11.91 |
| 614E13318 BARRIER REFLECTOR, TYPE 5 (ONE-WAY) | 63 EACH | $11.91 | $11.91 | $11.91 | $11.91 | $12.00 | $11.91 |
| 614E13350 OBJECT MARKER, ONE WAY | 52 EACH | $19.40 | $19.40 | $19.40 | $19.40 | $20.00 | $19.40 |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 0.5 MILE | $11,309 | $11,309 | $11,309 | $26,135 | $11,400 | $11,309 |
| 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE | 3,139 SY | $10.10 | $11.05 | $10.10 | $20.00 | $11.00 | $10.10 |
| 513E95030 STRUCTURAL STEEL, MISC.: BEARING ANCHOR BOLT | 2 EACH | $1,740 | $1,740 | $1,740 | $1,740 | $2,000 | $1,740 |
| 513E95030 STRUCTURAL STEEL, MISC.: GUSSET/COVER PLATE HOLE R | 2 EACH | $10,420 | $9,750 | $9,750 | $9,750 | $12,000 | $9,750 |
| 513E95030 STRUCTURAL STEEL, MISC.: RIVET REPLACEMENT | 66 EACH | $665 | $404 | $404 | $404 | $480 | $404 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 400 MNHR | $40.00 | $60.00 | $50.00 | $50.00 | $150 | $100 |
| 514E10000 FINAL INSPECTION REPAIR | 86 EACH | $115 | $350 | $50.00 | $150 | $200 | $100 |
| 519E12304 PATCHING CONCRETE BRIDGE DECK - TYPE C | 1 SY | $1,120 | $1,466 | $1,120 | $2,000 | $1,500 | $1,120 |
| 644E00104 EDGE LINE, 6" | 0.32 MILE | $7,645 | $7,645 | $7,645 | $7,645 | $7,700 | $7,645 |
| 644E00204 LANE LINE, 6" | 0.16 MILE | $5,375 | $5,375 | $5,375 | $5,375 | $5,500 | $5,375 |
| 511E34410 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 3 CY | $3,195 | $3,500 | $3,195 | $500 | $3,200 | $3,195 |
| 512E10600 CONCRETE REPAIR BY EPOXY INJECTION | 123 FT | $155 | $100 | $155 | $150 | $170 | $155 |
| 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE | 2,983 SY | $10.00 | $11.05 | $10.00 | $20.00 | $12.00 | $10.00 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 4,157 SF | $10.40 | $10.00 | $10.38 | $15.00 | $15.00 | $5.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 4,157 SF | $10.20 | $10.00 | $10.38 | $15.00 | $15.00 | $5.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 4,157 SF | $10.20 | $10.00 | $10.38 | $15.00 | $12.00 | $5.00 |
| 514E10000 FINAL INSPECTION REPAIR | 5 EACH | $330 | $350 | $50.00 | $150 | $300 | $100 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 96 SF | $198 | $199 | $198 | $196 | $220 | $198 |
| 519E12304 PATCHING CONCRETE BRIDGE DECK - TYPE C | 25 SY | $1,120 | $808 | $1,120 | $1,200 | $1,200 | $1,120 |
| 644E00104 EDGE LINE, 6" | 0.32 MILE | $7,645 | $7,645 | $7,645 | $7,645 | $7,700 | $7,645 |
| 644E00204 LANE LINE, 6" | 0.16 MILE | $5,375 | $5,375 | $5,375 | $5,375 | $5,400 | $5,375 |
| 517E76302 RAILING, MISC.: 3.5" O.D. ALUMINUM TUBE WITH ANCHO | 29 EACH | $116 | $116 | $116 | $116 | $120 | $114 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 118 MNHR | $40.00 | $60.00 | $50.00 | $75.00 | $200 | $100 |
| 514E10000 FINAL INSPECTION REPAIR | 27 EACH | $250 | $350 | $50.00 | $150 | $300 | $100 |
| 844E20000 GALVANIC ANODE PROTECTION | 1,145 EACH | $29.00 | $40.00 | $29.00 | $43.50 | $35.00 | $29.00 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $10,000 | $50,000 | $5,000 | $20,000 | $8,000 | $20,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,500 | $2,000 | $5,000 | $1,000 | $8,000 | $2,000 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 15 FT | $33.31 | $33.31 | $33.31 | $40.00 | $50.00 | $33.31 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $390 | $390 | $390 | $135 | $300 | $390 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 514E00101 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL, | 1 LS | $1,525,000 | $1.52M | 19% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 137,916 SF | $7.3 | $1.01M | 13% |
| 514E00401 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, AS P | 1 LS | $830,000 | $830k | 11% |
| 514E00301 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 1 LS | $700,000 | $700k | 9% |
| 514E00201 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 1 LS | $555,000 | $555k | 7% |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 2,592 SF | $160 | $415k | 5% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 4,157 SF | $78 | $324k | 4% |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 137,916 SF | $2.35 | $324k | 4% |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 137,916 SF | $2 | $276k | 4% |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 137,916 SF | $2 | $276k | 4% |