KNO-US 62/SR 205-14.32/00.00
KNO County · est $4.1M
Bid dateThursday, November 13—
KNO County · est $4.1M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 34 more items below.
| Item | Quantity | R1Kokosing Construction Company INC | R2Shelly Company | R3Shelly & Sands INC | % of bid |
|---|---|---|---|---|---|
| 443E10001 STONE MATRIX ASPHALT CONCRETE, 12.5 MM, PG70-22M, | 5,760 CY | $345 | $308 | $290 | 52% |
| 253E02000 PAVEMENT REPAIR | 3,100 CY | $210 | $315 | $275 | 17% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $233,509 | $310,000 | $466,000 | 6% |
| 624E10000 MOBILIZATION | 1 LS | $197,000 | $138,500 | $450,000 | 5% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (867 CY | $215 | $252 | $225 | 5% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 190 CY | $525 | $530 | $750 | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.50" | 118,500 SY | $0.75 |
| Item | Quantity | R1Kokosing Construction Company INC | R2Shelly Company | R3Shelly & Sands INC |
|---|---|---|---|---|
| 202E23001 PAVEMENT REMOVED, AS PER PLAN | 29 SY | $60.00 | $120 | $60.00 |
| 202E30000 WALK REMOVED | 996 SF | $6.50 | $10.00 | $6.50 |
| 202E32000 CURB REMOVED | 60 FT | $14.00 | $15.00 | $14.00 |
| 203E10000 EXCAVATION | 77 CY | $50.00 | $130 | $150 |
| 608E10000 4" CONCRETE WALK | 50 SF | $24.00 | $18.00 | $24.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $2.50 |
| $2.50 |
| 2% |
| 644E00104 EDGE LINE, 6" | 16.02 MILE | $3,510 | $3,510 | $3,510 | 1% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3.00" | 20,772 SY | $2.00 | $5.00 | $4.00 | 1% |
| 408E10001 PRIME COAT, AS PER PLAN | 7,365 GAL | $5.15 | $5.50 | $4.50 | 1% |
| 407E20000 NON-TRACKING TACK COAT | 12,713 GAL | $2.90 | $4.10 | $3.25 | 1% |
| 644E00300 CENTER LINE | 8.47 MILE | $3,672 | $3,672 | $3,672 | 1% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 1,015 CY | $30.00 | $99.00 | $70.00 | 1% |
| 202E23500 WEARING COURSE REMOVED | 7,226 SY | $4.00 | $10.00 | $12.00 | 1% |
| 608E52000 CURB RAMP | 946 SF | $24.00 | $18.00 | $24.00 | 1% |
| 209E72051 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA | 15.8 MILE | $1,400 | $1,375 | $5,500 | 1% |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 18 EACH | $1,100 | $1,100 | $1,100 | 1% |
| 621E00100 RPM | 513 EACH | $36.75 | $42.00 | $36.75 | 0% |
| 611E98631 CATCH BASIN ADJUSTED TO GRADE, AS PER PLAN | 15 EACH | $1,075 | $1,100 | $1,075 | 0% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $16,000 | $12,500 | $20,000 | 0% |
| 256 SF |
| $27.00 |
| $22.00 |
| $27.00 |
| 608E53020 DETECTABLE WARNING | 64 SF | $25.00 | $50.00 | $25.00 |
| 609E26000 CURB, TYPE 6 | 60 FT | $31.00 | $40.00 | $31.00 |
| 611E98635 CATCH BASIN RECONSTRUCTED TO GRADE, AS PER PLAN | 1 EACH | $1,475 | $1,500 | $1,475 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 14 EACH | $600 | $400 | $600 |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 64 CY | $210 | $285 | $250 |
| 516E31011 2" DEEP JOINT SEALER, AS PER PLAN | 312 FT | $28.62 | $32.50 | $32.50 |
| 618E43000 RUMBLE STRIPES, CENTER LINE (ASPHALT CONCRETE) | 2.99 MILE | $2,300 | $2,300 | $3,000 |
| 874E21000 LONGITUDINAL JOINT PREPARATION | 2.99 MILE | $2,900 | $8,000 | $2,200 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 513 EACH | $2.00 | $5.00 | $15.00 |
| 644E00400 CHANNELIZING LINE, 8" | 110 FT | $3.30 | $3.30 | $3.30 |
| 644E00500 STOP LINE | 683 FT | $10.00 | $10.00 | $10.00 |
| 644E00620 CROSSWALK LINE, 12" | 2,057 FT | $4.00 | $4.00 | $4.00 |
| 644E01110 SCHOOL SYMBOL MARKING, 96" | 2 EACH | $830 | $830 | $830 |
| 644E01200 PARKING LOT STALL MARKING | 2,140 FT | $2.25 | $2.25 | $2.25 |
| 644E01300 LANE ARROW, 96" | 1 EACH | $125 | $125 | $125 |
| 644E01410 WORD ON PAVEMENT, 96" | 1 EACH | $165 | $165 | $165 |
| 644E20800 YIELD LINE | 30 FT | $14.50 | $14.50 | $14.50 |
| 646E10010 EDGE LINE, 6" | 0.2 MILE | $21,980 | $21,980 | $21,980 |
| 646E10200 CENTER LINE | 0.12 MILE | $36,000 | $36,000 | $36,000 |
| 647E20212 HANDICAP SYMBOL MARKING, TYPE B125 | 2 EACH | $250 | $250 | $250 |
| 614E12460 WORK ZONE MARKING SIGN | 51 EACH | $60.00 | $90.00 | $100 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 12 CY | $250 | $250 | $750 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 0.83 MILE | $1,500 | $2,975 | $1,500 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 8.57 MILE | $900 | $1,075 | $900 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 110 FT | $0.90 | $8.00 | $0.90 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 50 FT | $3.00 | $12.00 | $3.00 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 64 FT | $2.50 | $10.00 | $2.50 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1,300 | $5,000 | $15,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 443E10001 STONE MATRIX ASPHALT CONCRETE, 12.5 MM, PG70-22M, | 5,760 CY | $345 | $1.99M | 50% |
| 253E02000 PAVEMENT REPAIR | 3,100 CY | $210 | $651k | 17% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $233,509 | $234k | 6% |
| 624E10000 MOBILIZATION | 1 LS | $197,000 | $197k | 5% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (867 CY | $215 | $186k | 5% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 190 CY | $525 | $100k | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.50" | 118,500 SY | $0.75 | $89k | 2% |
| 644E00104 EDGE LINE, 6" | 16.02 MILE | $3,510 | $56k | 1% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3.00" | 20,772 SY | $2 | $42k | 1% |
| 408E10001 PRIME COAT, AS PER PLAN | 7,365 GAL | $5.15 | $38k | 1% |