VIN-SR 93-07.20
VIN County · est $1.5M
Bid dateThursday, November 13—
VIN County · est $1.5M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 45 more items below.
| Item | Quantity | R1Fillmore Construction | R2Shelly & Sands INC | R3Axis Civil Construction LLC | R4Allard Excavation LLC | % of bid |
|---|---|---|---|---|---|---|
| 302E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 2,900 CY | $182 | $195 | $198 | $215 | 41% |
| 203E10000 EXCAVATION | 2,312 CY | $50.00 | $24.00 | $28.00 | $24.00 | 9% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (445 CY | $204 | $215 | $230 | $239 | 7% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 382 CY | $218 | $237 | $240 | $247 | 7% |
| 304E20000 AGGREGATE BASE | 787 CY | $80.00 | $110 | $145 | $117 | 5% |
| 602E20000 CONCRETE MASONRY | 39 CY | $1,500 | $1,750 | $2,510 | $2,436 |
| Item | Quantity | R1Fillmore Construction | R2Shelly & Sands INC | R3Axis Civil Construction LLC | R4Allard Excavation LLC |
|---|---|---|---|---|---|
| 202E20010 HEADWALL REMOVED | 2 EACH | $500 | $800 | $1,300 | $1,681 |
| 202E23000 PAVEMENT REMOVED | 361 SY | $20.00 | $14.50 | $22.00 | $11.00 |
| 202E38000 GUARDRAIL REMOVED | 137.5 FT | $10.00 | $5.00 | $10.00 | $3.00 |
| 202E58300 CATCH BASIN OR INLET REMOVED | 2 EACH | $250 | $800 | $1,350 | $418 |
| 204E10000 SUBGRADE COMPACTION |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $47,700 | $30,000 | $28,000 | $15,000 | 4% |
| 611E13900 30" CONDUIT, TYPE D, 748.06, CONCRETE ENCASED | 195 FT | $210 | $650 | $560 | $605 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40,000 | $40,000 | $75,000 | 3% |
| 203E20000 EMBANKMENT | 884 CY | $30.00 | $35.00 | $28.00 | $42.00 | 2% |
| 611E10900 24" CONDUIT, TYPE D, 748.06, CONCRETE ENCASED | 150 FT | $170 | $320 | $450 | $514 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $25,000 | $5,000 | $20,000 | $17,000 | 2% |
| 611E13200 30" CONDUIT, TYPE A | 124 FT | $160 | $215 | $240 | $221 | 2% |
| 832E30000 EROSION CONTROL | 18,750 EACH | $1.00 | $1.00 | $1.00 | $1.00 | 1% |
| 441E70500 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449) | — | $250 | $600 | $315 | $485 | 1% |
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 817 FT | $20.00 | $24.00 | $30.00 | $13.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $15,000 | $8,858 | $15,000 | $14,000 | 1% |
| 659E10000 SEEDING AND MULCHING | 9,985 SY | $1.45 | $0.88 | $0.80 | $0.80 | 1% |
| 611E16400 36" CONDUIT, TYPE B, 706.02 | 72 FT | $200 | $250 | $310 | $335 | 1% |
| 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 232 SY | $60.00 | $70.00 | $128 | $107 | 1% |
| 1,850 SY |
| $3.00 |
| $4.00 |
| $3.30 |
| $9.00 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 150 FT | $30.00 | $30.00 | $30.00 | $34.26 |
| 606E26100 ANCHOR ASSEMBLY, TYPE E | 1 EACH | $2,750 | $2,750 | $2,750 | $2,340 |
| 606E26500 ANCHOR ASSEMBLY, TYPE T | 1 EACH | $1,100 | $1,100 | $1,100 | $1,190 |
| 690E50350 SPECIAL - MAILBOX REMOVED AND RESET | 17 EACH | $300 | $150 | $245 | $182 |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 27 CY | $180 | $125 | $140 | $101 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 16 CY | $140 | $180 | $195 | $133 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $300 | $135 | $150 | $150 |
| 659E00300 TOPSOIL | 95 CY | $60.00 | $65.00 | $90.00 | $34.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 499 SY | $2.20 | $0.80 | $0.80 | $0.80 |
| 659E15000 INTER-SEEDING | 499 SY | $2.20 | $0.80 | $0.80 | $0.80 |
| 659E20000 COMMERCIAL FERTILIZER | 1.39 TON | $1,400 | $885 | $1,250 | $1,250 |
| 659E31000 LIME | 2.06 ACRE | $450 | $160 | $150 | $150 |
| 659E35000 WATER | 55 MGAL | $100 | $1.00 | $1.00 | $1.00 |
| 659E40000 MOWING | 22 MSF | $100 | $25.00 | $50.00 | $50.00 |
| 670E00700 DITCH EROSION PROTECTION | 1,699 SY | $2.00 | $1.35 | $2.50 | $2.50 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $5,000 | $2,800 | $3,000 | $3,000 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $5,000 | $4,280 | $6,750 | $11,750 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $7,500 | $11,054 | $13,500 | $11,100 |
| 611E04400 12" CONDUIT, TYPE B | 89 FT | $80.00 | $80.00 | $75.00 | $103 |
| 611E04900 12" CONDUIT, TYPE D | 65 FT | $60.00 | $85.00 | $115 | $125 |
| 611E06400 15" CONDUIT, TYPE D, 748.06, CONCRETE ENCASED | 50 FT | $135 | $250 | $310 | $336 |
| 611E10200 24" CONDUIT, TYPE A | 88 FT | $120 | $165 | $160 | $138 |
| 611E10400 24" CONDUIT, TYPE B, 706.02 | 63 FT | $140 | $160 | $225 | $224 |
| 611E12400 27" CONDUIT, TYPE D, 748.06, CONCRETE ENCASED | 35 FT | $210 | $650 | $550 | $615 |
| 611E19200 42" CONDUIT, TYPE A | 68 FT | $180 | $315 | $265 | $300 |
| 611E20700 48" CONDUIT, TYPE A | 68 FT | $200 | $415 | $400 | $542 |
| 611E98470 CATCH BASIN, NO. 2-2B | 1 EACH | $3,000 | $3,750 | $4,000 | $3,939 |
| 611E98510 CATCH BASIN, NO. 2-3 | 1 EACH | $4,000 | $4,000 | $4,400 | $4,008 |
| 611E98540 CATCH BASIN, NO. 2-4 | 1 EACH | $5,000 | $6,000 | $7,200 | $5,510 |
| 407E10000 TACK COAT | 1,710 GAL | $3.50 | $3.50 | $2.50 | $2.50 |
| 441E70700 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (43 CY | $240 | $550 | $290 | $405 |
| 638E10500 FIRE HYDRANT REMOVED AND RESET | 1 EACH | $5,000 | $3,100 | $6,500 | $5,505 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 25 FT | $45.00 | $25.00 | $25.00 | $45.00 |
| 630E80100 SIGN, FLAT SHEET | 11 SF | $95.00 | $25.00 | $25.00 | $95.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 2 EACH | $325 | $25.00 | $25.00 | $36.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $325 | $25.00 | $25.00 | $36.00 |
| 646E10010 EDGE LINE, 6" | 0.98 MILE | $8,831 | $3,300 | $7,400 | $8,028 |
| 646E10200 CENTER LINE | 0.47 MILE | $8,831 | $3,300 | $7,400 | $8,028 |
| 614E12420 DETOUR SIGNING | 1 LS | $8,800 | $8,800 | $8,800 | $8,800 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $7,500 | $31,000 | $20,000 | $27,890 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 302E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 2,900 CY | $182 | $528k | 35% |
| 203E10000 EXCAVATION | 2,312 CY | $50 | $116k | 8% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (445 CY | $204 | $91k | 6% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 382 CY | $218 | $83k | 6% |
| 304E20000 AGGREGATE BASE | 787 CY | $80 | $63k | 4% |
| 602E20000 CONCRETE MASONRY | 39 CY | $1,500 | $59k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $47,700 | $48k | 3% |
| 611E13900 30" CONDUIT, TYPE D, 748.06, CONCRETE ENCASED | 195 FT | $210 | $41k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 3% |
| 203E20000 EMBANKMENT | 884 CY | $30 | $27k | 2% |