JAC-SR 139-06.82
JAC County · est $0.5M
Bid dateThursday, November 13—
JAC County · est $0.5M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 38 more items below.
| Item | Quantity | R1D G M INC | R2Fillmore Construction | R3Alan Stone CO INC | R4Scioto Valley Paving LLC | R5Axis Civil Construction LLC | R6Sunesis Construction CO | R7R C Construction Company And Son | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 611E94980 10' X 4' CONDUIT, TYPE A, 706.05 | 72 FT | $1,582 | $1,450 | $1,400 | $2,000 | $1,740 | $1,581 | $1,400 | 36% |
| 851E10000 PRECAST GRAVITY AND SEMIGRAVITY RETAINING WALL | 193 SF | $140 | $200 | $140 | $0.10 | $115 | $179 | $85.00 | 8% |
| Item | Quantity | R1D G M INC | R2Fillmore Construction | R3Alan Stone CO INC | R4Scioto Valley Paving LLC | R5Axis Civil Construction LLC | R6Sunesis Construction CO | R7R C Construction Company And Son |
|---|---|---|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 133 SY | $8.00 | $10.00 | $20.00 | $25.00 | $20.00 | $34.33 | $30.00 |
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 115 FT | $15.00 | $20.00 | $15.00 | $30.00 | $11.00 | $15.89 | $50.00 |
| 202E38000 GUARDRAIL REMOVED |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1 LS |
| $20,000 |
| $16,000 |
| $23,000 |
| $8,500 |
| $28,000 |
| $21,316 |
| $45,000 |
| 6% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 28 CY | $650 | $1,500 | $1,000 | $1,200 | $690 | $1,057 | $700 | 6% |
| 202E11000 STRUCTURE REMOVED | 1 LS | $15,500 | $10,000 | $13,000 | $10,000 | $18,000 | $14,917 | $15,000 | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $15,000 | $3,500 | $2,200 | $6,500 | $18,000 | $2,919 | $20,000 | 5% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $14,000 | $7,500 | $3,500 | $9,500 | $6,500 | $3,505 | $20,000 | 4% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 30 CY | $380 | $300 | $400 | $650 | $390 | $365 | $550 | 4% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 25 CY | $445 | $500 | $450 | $650 | $460 | $430 | $750 | 3% |
| 253E02000 PAVEMENT REPAIR | 30 CY | $325 | $300 | $450 | $150 | $200 | $461 | $25.00 | 3% |
| 203E10000 EXCAVATION | 405 CY | $22.50 | $50.00 | $35.00 | $45.00 | $36.00 | $49.71 | $25.00 | 3% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 30 CY | $275 | $500 | $460 | $650 | $290 | $411 | $25.00 | 3% |
| 614E12420 DETOUR SIGNING | 1 LS | $8,250 | $8,000 | $10,000 | $6,500 | $7,990 | $9,547 | $20,000 | 3% |
| 607E15000 FENCE, TYPE 47 | 111 FT | $70.00 | $50.00 | $80.00 | $45.00 | $65.00 | $65.00 | $55.00 | 2% |
| 611E04900 12" CONDUIT, TYPE D | 70 FT | $80.00 | $80.00 | $80.00 | $140 | $60.00 | $88.67 | $175 | 2% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 2,400 LB | $2.25 | $3.00 | $3.50 | $6.00 | $3.00 | $3.11 | $3.00 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $5,000 | $17,500 | $22,000 | $20,000 | $36,000 | $36,472 | $15,000 | 2% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 30 CY | $160 | $300 | $410 | $150 | $290 | $411 | $25.00 | 2% |
| 601E32110 ROCK CHANNEL PROTECTION, TYPE B WITH AGGREGATE FIL | 31 CY | $145 | $140 | $150 | $380 | $130 | $257 | $175 | 1% |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 34 CY | $125 | $200 | $160 | $185 | $145 | $144 | $150 | 1% |
| 137.5 FT |
| $1.00 |
| $10.00 |
| $7.50 |
| $15.00 |
| $10.00 |
| $2.80 |
| $5.00 |
| 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A | 4 EACH | $200 | $500 | $510 | $500 | $250 | $194 | $1,000 |
| 202E53100 MAILBOX REMOVED | 3 EACH | $25.00 | $100 | $100 | $65.00 | $75.00 | $88.49 | $200 |
| 202E75000 FENCE REMOVED | 111 FT | $8.00 | $10.00 | $2.50 | $15.00 | $2.00 | $5.75 | $20.00 |
| 202E98000 REMOVAL MISC.: EXITING SWINGSET AND DOG KENNEL | 1 LS | $500 | $500 | $1,400 | $500 | $2,500 | $1,109 | $4,500 |
| 203E20000 EMBANKMENT | 109 CY | $25.00 | $80.00 | $20.00 | $55.00 | $36.00 | $14.88 | $25.00 |
| 204E10000 SUBGRADE COMPACTION | 319 SY | $8.00 | $10.00 | $8.00 | $5.00 | $3.00 | $4.65 | $2.00 |
| 690E50300 SPECIAL - MAILBOX SUPPORT SYSTEM, MULTIPLE | 1 EACH | $300 | $500 | $970 | $250 | $500 | $75.00 | $500 |
| 659E10000 SEEDING AND MULCHING | 728 SY | $4.00 | $3.00 | $4.50 | $4.50 | $4.50 | $5.33 | $10.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 36 SY | $0.05 | $3.00 | $10.00 | $3.50 | $4.50 | $4.50 | $0.20 |
| 659E20000 COMMERCIAL FERTILIZER | 0.1 TON | $1,500 | $2,500 | $710 | $1,500 | $1,250 | $1,250 | $1,950 |
| 659E31000 LIME | 0.15 ACRE | $300 | $1,000 | $1,000 | $1,500 | $150 | $150 | $1,600 |
| 659E35000 WATER | 3.9 MGAL | $1.00 | $1.00 | $130 | $1.00 | $1.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 45 FT | $15.00 | $20.00 | $35.00 | $20.00 | $12.00 | $20.00 | $100 |
| 304E20000 AGGREGATE BASE | 32 CY | $125 | $100 | $160 | $150 | $165 | $139 | $150 |
| 407E10000 TACK COAT | 44 GAL | $4.50 | $10.00 | $4.00 | $1.00 | $7.00 | $4.50 | $10.00 |
| 621E00100 RPM | 2 EACH | $545 | $600 | $690 | $250 | $545 | $1,460 | $2,000 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 2 EACH | $1.00 | $20.00 | $120 | $30.00 | $50.00 | $88.49 | $100 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.06 MILE | $25,000 | $25,404 | $29,000 | $30,000 | $23,095 | $13,000 | $16,500 |
| 642E00300 CENTER LINE, TYPE 1 | 0.03 MILE | $37,500 | $38,110 | $44,000 | $50,000 | $34,645 | $13,000 | $32,000 |
| 407E10000 TACK COAT | 30 GAL | $4.50 | $10.00 | $5.50 | $1.00 | $4.00 | $4.50 | $1.00 |
| 616E10000 WATER | 1 MGAL | $1.00 | $1.00 | $130 | $1.00 | $1.00 | $24.40 | $1.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $500 | $10,000 | $22,000 | $10,000 | $14,000 | $12,425 | $15,000 |
| 503E21301 UNCLASSIFIED EXCAVATION, AS PER PLAN | 1 LS | $3,000 | $10,000 | $10,000 | $10,000 | $35,000 | $28,860 | $15,000 |
| 503E31100 ROCK EXCAVATION | 56 CY | $70.00 | $200 | $120 | $250 | $85.00 | $157 | $300 |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 1 CY | $3,000 | $1,500 | $7,700 | $2,500 | $2,800 | $4,370 | $700 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 40 SY | $45.00 | $50.00 | $70.00 | $55.00 | $55.00 | $54.54 | $65.00 |
| 512E33000 TYPE 2 WATERPROOFING | 190 SY | $18.00 | $24.00 | $25.00 | $50.00 | $28.00 | $37.88 | $35.00 |
| 851E11000 NATURAL SOIL | 6 CY | $50.00 | $200 | $270 | $250 | $55.00 | $42.85 | $150 |
| 851E14000 ON-SITE ASSISTANCE | 2 DAY | $1,000 | $300 | $2,800 | $1.00 | $500 | $366 | $3,500 |
| 851E15000 WALL DRAINAGE SYSTEM | 1 LS | $2,000 | $5,000 | $9,500 | $2,500 | $7,500 | $2,718 | $3,500 |
| 851E15500 PGSRW INSPECTION AND COMPACTION TESTING | 1 LS | $1,000 | $5,000 | $2,100 | $0.01 | $4,000 | $2,000 | $5,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $4,000 | $5,000 | $9,000 | $3,500 | $8,600 | $5,800 | $10,000 |
| 623E50000 PRECONSTRUCTION SURVEY MONUMENT VERIFICATION AND R | 1 LS | $1,000 | $2,500 | $1,800 | $2,500 | $800 | $1,400 | $3,000 |
| 623E51000 POST CONSTRUCTION SURVEY MONUMENT VERIFICATION AND | 1 LS | $1,000 | $2,500 | $1,800 | $2,500 | $800 | $1,400 | $3,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E94980 10' X 4' CONDUIT, TYPE A, 706.05 | 72 FT | $1,582 | $114k | 31% |
| 851E10000 PRECAST GRAVITY AND SEMIGRAVITY RETAINING WALL | 193 SF | $140 | $27k | 7% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $20,000 | $20k | 5% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 28 CY | $650 | $18k | 5% |
| 202E11000 STRUCTURE REMOVED | 1 LS | $15,500 | $16k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $15,000 | $15k | 4% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $14,000 | $14k | 4% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 30 CY | $380 | $11k | 3% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 25 CY | $445 | $11k | 3% |
| 253E02000 PAVEMENT REPAIR | 30 CY | $325 | $10k | 3% |