LOG-US 33-17.82
LOG County · est $0.7M
Bid dateThursday, November 13—
LOG County · est $0.7M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 7 more items below.
| Item | Quantity | R1Bcc Ohio INC | R2Ohio Concrete Maintenance LLC | R3Double Z Construction Company | R4Complete General Construction Company | R5Eagle Bridge CO | R6Perk Company INC | R7I V S Hydro INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 516E11211 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S | 111 FT | $1,033 | $900 | $815 | $800 | $1,000 | $1,155 | $1,385 | 24% |
| 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 1,058 SY | $81.32 | $65.00 | $75.00 | $70.00 | $90.00 | $83.15 | $105 | 18% |
| Item | Quantity | R1Bcc Ohio INC | R2Ohio Concrete Maintenance LLC | R3Double Z Construction Company | R4Complete General Construction Company | R5Eagle Bridge CO | R6Perk Company INC | R7I V S Hydro INC |
|---|---|---|---|---|---|---|---|---|
| 202E23501 WEARING COURSE REMOVED, AS PER PLAN | 695 SY | $0.90 | $5.00 | $10.00 | $9.00 | $7.50 | $10.00 | $14.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1 LS |
| $57,624 |
| $52,000 |
| $110,000 |
| $156,000 |
| $145,000 |
| $82,650 |
| $106,000 |
| 12% |
| 511E34410 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 19 CY | $2,561 | $2,200 | $2,200 | $4,000 | $3,500 | $2,620 | $955 | 10% |
| 848E20001 SURFACE PREPARATION USING HYDRODEMOLITION, AS PER | 1,029 SY | $40.64 | $59.00 | $90.00 | $80.00 | $80.00 | $84.15 | $85.00 | 9% |
| 514E27700 FIELD PAINTING, MISC.: FIELD PAINTING OF REPLACED | 336 SF | $63.57 | $100 | $115 | $90.00 | $90.00 | $225 | $145 | 4% |
| 441E70100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 32 CY | $656 | $700 | $575 | $575 | $575 | $850 | $825 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $20,102 | $53,000 | $30,000 | $30,000 | $35,000 | $86,000 | $81,000 | 4% |
| 848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE | 23 CY | $676 | $400 | $600 | $455 | $510 | $615 | $600 | 3% |
| 848E50000 HAND CHIPPING | 62 SY | $237 | $140 | $161 | $80.00 | $135 | $188 | $105 | 3% |
| 513E90000 STRUCTURAL STEEL, MISC.: END CROSSFRAMES AND PLATE | 2,522 LB | $4.65 | $12.00 | $10.00 | $10.00 | $10.00 | $15.50 | $54.54 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,082 | $13,000 | $5,000 | $6,000 | $12,500 | $10,000 | $7,500 | 1% |
| 614E12420 DETOUR SIGNING | 1 LS | $5,822 | $4,000 | $10,000 | $8,000 | $6,500 | $5,000 | $7,041 | 1% |
| 844E20001 GALVANIC ANODE PROTECTION, AS PER PLAN | 66 EACH | $57.30 | $30.00 | $80.00 | $60.00 | $50.00 | $95.50 | $64.02 | 1% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 875 LB | $4.03 | $5.00 | $6.00 | $3.50 | $2.50 | $4.40 | $2.00 | 1% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $3,406 | $25,000 | $32,000 | $25,000 | $22,500 | $28,000 | $30,000 | 1% |
| 516E31011 2" DEEP JOINT SEALER, AS PER PLAN | 105 FT | $28.44 | $20.00 | $40.00 | $25.50 | $15.00 | $10.50 | $51.97 | 1% |
| 516E31001 JOINT SEALER, AS PER PLAN | 100 FT | $28.44 | $20.00 | $40.00 | $38.00 | $15.00 | $11.55 | $49.68 | 1% |
| 646E10010 EDGE LINE, 6" | 0.16 MILE | $17,063 | $22,500 | $22,240 | $16,250 | $22,240 | $20,000 | $16,250 | 1% |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 90 EACH | $28.65 | $30.00 | $40.00 | $19.00 | $24.00 | $50.25 | $66.63 | 1% |
| 407E10000 TACK COAT | 69 GAL | $1.05 | $1.25 | $3.00 | $3.00 | $3.00 | $10.00 | $3.00 |
| 646E10200 CENTER LINE | 0.08 MILE | $17,063 | $45,000 | $29,650 | $16,250 | $29,650 | $20,000 | $16,250 |
| 509E20001 CONCRETE REINFORCEMENT, REPLACEMENT OF EXISTING CO | 100 LB | $1.88 | $5.00 | $3.00 | $4.00 | $2.00 | $4.30 | $6.09 |
| 848E50100 TEST SLAB | 1 LS | $2,289 | $500 | $1,500 | $1,500 | $2,500 | $2,400 | $1,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $105 | $5,000 | $2,000 | $7,000 | $500 | $5,000 | $1,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 516E11211 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S | 111 FT | $1,033 | $115k | 23% |
| 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 1,058 SY | $81.32 | $86k | 17% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $57,624 | $58k | 12% |
| 511E34410 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 19 CY | $2,561 | $49k | 10% |
| 848E20001 SURFACE PREPARATION USING HYDRODEMOLITION, AS PER | 1,029 SY | $40.64 | $42k | 8% |
| 514E27700 FIELD PAINTING, MISC.: FIELD PAINTING OF REPLACED | 336 SF | $63.57 | $21k | 4% |
| 441E70100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 32 CY | $656.25 | $21k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $20,102 | $20k | 4% |
| 848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE | 23 CY | $675.75 | $16k | 3% |
| 848E50000 HAND CHIPPING | 62 SY | $237.04 | $15k | 3% |