513E10121STRUCTURAL STEEL MEMBERS, LEVEL 6, AS PER PLAN
1 LS
$52,000
$55,000
20%
202E11201PORTIONS OF STRUCTURE REMOVED, AS PER PLAN (DYWIDA
1 LS
$46,000
$28,000
18%
514E27700FIELD PAINTING, MISC.: SECONDARY MEMBERS
138 SF
$206
$820
11%
614E13000ASPHALT CONCRETE FOR MAINTAINING TRAFFIC
10 CY
$2,750
$200
11%
530E00400SPECIAL - STRUCTURES: CLEANING OF BRIDGE SEATS
2 EACH
$10,700
$7,000
8%
614E11000MAINTAINING TRAFFIC
1 LS
$17,000
$10,000
7%
410E13000TRAFFIC COMPACTED SURFACE, TYPE C
10 CY
$1,550
$250
6%
614E12421DETOUR SIGNING, AS PER PLAN
1 LS
$10,500
$11,000
4%
511E81500CONCRETE, MISC.: FILLING OPEN STEEL GRID
16 CF
$656
$500
4%
614E11110LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST
40 HOUR
$200
$60.00
3%
614E18601PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN
4 SNMT
$1,500
$1,300
2%
614E15000SPECIAL - CALENDAR DAYS OF CONTRACT TIME FOR OPENI
6,000 DLR
$1.00
$5.00
2%
624E10000MOBILIZATION
1 LS
$5,000
$12,000
2%
103E05000PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM
1 LS
$2,500
$5,000
1%
Project details
Description
MUS-US 22-11.59
Type of work
Bridge
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
$52k
20%
202E11201PORTIONS OF STRUCTURE REMOVED, AS PER PLAN (DYWIDA
1 LS
$46,000
$46k
18%
514E27700FIELD PAINTING, MISC.: SECONDARY MEMBERS
138 SF
$206
$28k
11%
614E13000ASPHALT CONCRETE FOR MAINTAINING TRAFFIC
10 CY
$2,750
$28k
11%
530E00400SPECIAL - STRUCTURES: CLEANING OF BRIDGE SEATS
2 EACH
$10,700
$21k
8%
614E11000MAINTAINING TRAFFIC
1 LS
$17,000
$17k
7%
410E13000TRAFFIC COMPACTED SURFACE, TYPE C
10 CY
$1,550
$16k
6%
614E12421DETOUR SIGNING, AS PER PLAN
1 LS
$10,500
$11k
4%
511E81500CONCRETE, MISC.: FILLING OPEN STEEL GRID
16 CF
$656
$10k
4%
614E11110LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST