PIC-SR-SR 188-02.56
PIC County · est $1.6M
Bid dateThursday, December 4—
PIC County · est $1.6M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 37 more items below.
| Item | Quantity | R1Kokosing Construction Company INC | R2Shelly Company | % of bid |
|---|---|---|---|---|
| 441E10000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG | 3,180 CY | $192 | $181 | 47% |
| 251E01041 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 3,866 SY | $50.00 | $54.25 | 15% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 1 | 77,653 SY | $1.70 | $2.55 | 10% |
| 624E10000 MOBILIZATION | 1 LS | $69,000 | $40,000 | 5% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 2,563 FT | $22.87 | $24.75 | 4% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 21 EACH | $2,384 | $2,500 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $30,630 | $103,250 | 2% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 58 CY | $480 | $458 | 2% |
| 203E20001 EMBANKMENT, AS PER PLAN | 383 CY | $68.00 | $45.00 | 2% |
| 407E20000 NON-TRACKING TACK COAT | 6,607 GAL | $2.65 | $4.10 | 1% |
| 621E00100 RPM | 410 EACH | $38.00 | $38.00 | 1% |
| 886E11000 FOG SEAL | 3,616 GAL | $4.00 | $4.65 | 1% |
| 617E10100 COMPACTED AGGREGATE | 383 CY | $35.00 | $87.00 | 1% |
| 601E21051 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT, | 111 SY | $100 | $73.00 | 1% |
| 642E00104 EDGE LINE, 6", TYPE 1 | 10.75 MILE | $825 | $825 | 1% |
| 659E00300 TOPSOIL | 253 CY | $30.00 | $55.00 | 1% |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 10.75 MILE | $675 | $1,135 | 1% |
| 202E53010 SPECIAL - PARKING BLOCK REMOVED AND RESET | 82 EACH | $80.00 | $65.00 | 1% |
| 642E00300 CENTER LINE, TYPE 1 | 5.28 MILE | $1,130 | $1,130 | 0% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,600 | $5,500 | 0% |
| Item | Quantity | R1Kokosing Construction Company INC | R2Shelly Company |
|---|---|---|---|
| 202E38001 GUARDRAIL REMOVED, AS PER PLAN | 2,537.5 FT | $2.16 | $2.00 |
| 202E42001 ANCHOR ASSEMBLY REMOVED, TYPE A, AS PER PLAN | 20 EACH | $243 | $350 |
| 202E47001 BRIDGE TERMINAL ASSEMBLY REMOVED, AS PER PLAN | 4 EACH | $162 | $125 |
| 202E52990 SPECIAL - PARKING BLOCK REMOVED | 4 EACH | $190 | $110 |
| 202E53101 MAILBOX REMOVED, AS PER PLAN | 1 EACH | $50.00 | $150 |
| 202E98200 REMOVAL MISC.: IRON FENCE | 260 FT | $1.50 | $0.50 |
| 209E60200 LINEAR GRADING | 40.96 STA | $95.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $45.00 |
| 606E15050 GUARDRAIL, TYPE MGS | 193.75 FT | $21.53 | $20.75 |
| 606E26050 ANCHOR ASSEMBLY, MGS TYPE B | 1 EACH | $2,546 | $2,500 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 4 EACH | $1,068 | $1,200 |
| 606E35141 BRIDGE TERMINAL ASSEMBLY, TYPE 4, AS PER PLAN | 4 EACH | $993 | $1,500 |
| 606E98000 GUARDRAIL, MISC.: ALTERNATIVE GUARDRAIL PLACEMENT | 50 FT | $32.37 | $12.00 |
| 623E39500 MONUMENT ASSEMBLY ADJUSTED TO GRADE | 3 EACH | $1,000 | $1,000 |
| 659E10000 SEEDING AND MULCHING | 2,276 SY | $1.50 | $2.50 |
| 659E14000 REPAIR SEEDING AND MULCHING | 113 SY | $1.50 | $0.80 |
| 659E15000 INTER-SEEDING | 113 SY | $1.50 | $0.80 |
| 659E20000 COMMERCIAL FERTILIZER | 0.41 TON | $1,250 | $697 |
| 659E31000 LIME | 0.54 ACRE | $150 | $137 |
| 659E35000 WATER | 12 MGAL | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 |
| 251E01041 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 141 SY | $37.00 | $68.25 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" | 59 SY | $1.70 | $3.00 |
| 617E20000 SHOULDER PREPARATION | 6,370 SY | $0.30 | $2.30 |
| 617E25000 WATER | 4 MGAL | $5.00 | $1.00 |
| 251E98000 PARTIAL DEPTH REPAIR, MISC.:CAMPGROUND PAVEMENT RE | 4 CY | $500 | $3,800 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 410 EACH | $1.00 | $4.35 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 50 EACH | $11.87 | $12.00 |
| 642E00500 STOP LINE, TYPE 1 | 35 FT | $8.00 | $8.00 |
| 642E01200 PARKING LOT STALL MARKING, TYPE 1 | 6,141 FT | $0.90 | $0.90 |
| 642E01300 LANE ARROW, TYPE 1 | 12 EACH | $95.00 | $95.00 |
| 642E01702 HANDICAP SYMBOL MARKING, TYPE 1 | 9 EACH | $95.00 | $95.00 |
| 642E50010 PAVEMENT MARKING, MISC.: CAMPGROUND SITE NUMBERS | 60 EACH | $70.00 | $70.00 |
| 644E00500 STOP LINE | 15 FT | $15.00 | $15.00 |
| 614E12460 WORK ZONE MARKING SIGN | 32 EACH | $125 | $125 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 5.28 MILE | $950 | $965 |
| 516E31200 SPECIAL - SAWING AND SEALING BITUMINOUS CONCRETE J | 36 FT | $120 | $50.00 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $1,500 | $2,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E10000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG | 3,180 CY | $192 | $611k | 44% |
| 251E01041 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 3,866 SY | $50 | $193k | 14% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 1 | 77,653 SY | $1.7 | $132k | 9% |
| 624E10000 MOBILIZATION | 1 LS | $69,000 | $69k | 5% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 2,563 FT | $22.87 | $59k | 4% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 21 EACH | $2,384 | $50k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $30,630 | $31k | 2% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 58 CY | $480 | $28k | 2% |
| 203E20001 EMBANKMENT, AS PER PLAN | 383 CY | $68 | $26k | 2% |
| 407E20000 NON-TRACKING TACK COAT | 6,607 GAL | $2.65 | $18k | 1% |