LAW-SR 243-04.38
LAW County · est $0.3M
Bid dateThursday, December 18—
LAW County · est $0.3M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 28 more items below.
| Item | Quantity | R1Axis Civil Construction LLC | R2D G M INC | R3Scioto Valley Paving LLC | R4R C Construction Company And Son INC | % of bid |
|---|---|---|---|---|---|---|
| 611E20900 48" CONDUIT, TYPE B, 706.02 | 76 FT | $590 | $975 | $700 | $500 | 17% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 116 CY | $350 | $330 | $375 | $600 | 16% |
| 624E10000 MOBILIZATION | 1 LS | $25,000 | $10,000 | $20,000 | $15,000 | 10% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 59 CY | $400 | $325 | $450 | $650 | 9% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $20,000 | $36,000 | $6,500 | $25,000 | 8% |
| 304E20000 AGGREGATE BASE | 102 CY | $130 | $90.00 | $130 | $175 | 5% |
| Item | Quantity | R1Axis Civil Construction LLC | R2D G M INC | R3Scioto Valley Paving LLC | R4R C Construction Company And Son INC |
|---|---|---|---|---|---|
| 202E20010 HEADWALL REMOVED | 1 EACH | $850 | $500 | $250 | $1,500 |
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 50 FT | $25.00 | $25.00 | $125 | $100 |
| 202E98100 REMOVAL MISC.: METAL POST REMOVED | 5 EACH | $65.00 | $20.00 | $100 | $500 |
| 203E20000 EMBANKMENT | 90 CY | $40.00 | $40.00 | $100 | $50.00 |
| 204E10000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 202E11000 STRUCTURE REMOVED |
| 1 LS |
| $10,000 |
| $16,000 |
| $20,000 |
| $10,000 |
| 4% |
| 202E23000 PAVEMENT REMOVED | 592 SY | $15.00 | $15.00 | $18.00 | $45.00 | 3% |
| 611E98570 CATCH BASIN, NO. 2-5 | 1 EACH | $8,400 | $5,000 | $7,500 | $7,500 | 3% |
| 602E20000 CONCRETE MASONRY | 1.29 CY | $6,400 | $2,500 | $3,500 | $3,200 | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $8,000 | $12,000 | $4,500 | $2,500 | 3% |
| 611E99574 MANHOLE, NO. 3 | 1 EACH | $8,000 | $2,200 | $7,500 | $8,500 | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $8,000 | $4,000 | $6,500 | $15,000 | 3% |
| 611E05900 15" CONDUIT, TYPE B (SEE SHEET P.13 FOR ALLOWABLE | 41 FT | $145 | $160 | $300 | $300 | 2% |
| 611E04600 12" CONDUIT, TYPE C, 707.33 | 58 FT | $90.00 | $130 | $150 | $200 | 2% |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $5,000 | $500 | $10,000 | $15,000 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,000 | $18,000 | $10,000 | $16,500 | 2% |
| 611E06100 15" CONDUIT, TYPE C (SEE SHEET P.13 FOR ALLOWABLE | 31 FT | $145 | $170 | $350 | $300 | 2% |
| 614E12420 DETOUR SIGNING | 1 LS | $3,800 | $10,000 | $6,500 | $35,000 | 1% |
| 592 SY |
| $2.50 |
| $8.00 |
| $6.00 |
| $2.00 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 1 EACH | $355 | $250 | $300 | $400 |
| 690E50200 SPECIAL - MAILBOX SUPPORT SYSTEM, DOUBLE | 1 EACH | $355 | $350 | $300 | $650 |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 8 CY | $160 | $200 | $500 | $250 |
| 659E10000 SEEDING AND MULCHING | 425 SY | $5.00 | $7.00 | $4.50 | $10.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 22 SY | $5.00 | $0.05 | $4.50 | $0.20 |
| 659E20000 COMMERCIAL FERTILIZER | 0.06 TON | $1,250 | $2,000 | $1,200 | $2,500 |
| 659E31000 LIME | 0.1 ACRE | $650 | $300 | $1,200 | $2,000 |
| 659E35000 WATER | 2 MGAL | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E00406 4" CONDUIT, TYPE F | 20 FT | $45.00 | $10.00 | $40.00 | $25.00 |
| 611E07600 18" CONDUIT, TYPE C 707.33 | 6 FT | $250 | $325 | $400 | $375 |
| 253E02000 PAVEMENT REPAIR | 15 CY | $250 | $625 | $100 | $25.00 |
| 407E10000 TACK COAT | 47 GAL | $6.00 | $2.50 | $1.00 | $10.00 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 16 CY | $220 | $150 | $200 | $150 |
| 621E00100 RPM | 1 EACH | $2,500 | $2,500 | $1,200 | $2,500 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 1 EACH | $65.00 | $1.00 | $35.00 | $50.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 10 FT | $75.00 | $45.00 | $15.00 | $50.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $95.00 | $350 | $250 | $250 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.03 MILE | $24,500 | $26,000 | $53,366 | $65,000 |
| 642E00300 CENTER LINE, TYPE 1 | 0.02 MILE | $36,000 | $38,000 | $80,049 | $85,000 |
| 642E00500 STOP LINE, TYPE 1 | 16 FT | $12.00 | $15.00 | $50.00 | $100 |
| 616E10000 WATER | 1 MGAL | $1.00 | $1.00 | $1.00 | $1.00 |
| 623E50000 PRECONSTRUCTION SURVEY MONUMENT VERIFICATION AND R | 1 LS | $800 | $1,000 | $2,000 | $2,500 |
| 623E51000 POST CONSTRUCTION SURVEY MONUMENT VERIFICATION AND | 1 LS | $800 | $1,000 | $2,000 | $2,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E20900 48" CONDUIT, TYPE B, 706.02 | 76 FT | $590 | $45k | 15% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 116 CY | $350 | $41k | 14% |
| 624E10000 MOBILIZATION | 1 LS | $25,000 | $25k | 9% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 59 CY | $400 | $24k | 8% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $20,000 | $20k | 7% |
| 304E20000 AGGREGATE BASE | 102 CY | $130 | $13k | 5% |
| 202E11000 STRUCTURE REMOVED | 1 LS | $10,000 | $10k | 3% |
| 202E23000 PAVEMENT REMOVED | 592 SY | $15 | $9k | 3% |
| 611E98570 CATCH BASIN, NO. 2-5 | 1 EACH | $8,400 | $8k | 3% |
| 602E20000 CONCRETE MASONRY | 1.29 CY | $6,400 | $8k | 3% |