| Item | Quantity | R1Sand Ridge Excavating | R2Vernon Nagel INC | R3Fenson Contracting LLC | % of bid |
|---|---|---|---|---|---|
| 611E28000 84" CONDUIT, TYPE A, 706.02, 707.35 or 707.01 w/ C | 50 FT | $1,064 | $1,600 | $1,355 | 18% |
| 602E20000 CONCRETE MASONRY | 50 CY | $744 | $1,200 | $1,090 | 13% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 57 CY | $638 | $425 | $485 | 13% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 41 CY | $683 | $455 | $522 | 10% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $15,000 | $6,000 | $3,625 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $15,000 | $14,000 | $10,000 | 5% |
| 253E02000 PAVEMENT REPAIR | 20 CY | $552 | $460 |
| Item | Quantity | R1Sand Ridge Excavating | R2Vernon Nagel INC | R3Fenson Contracting LLC |
|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,000 | $1,000 | $5,000 |
| 202E23000 PAVEMENT REMOVED | 493 SY | $6.00 | $16.00 | $18.00 |
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 75 FT | $30.00 | $14.00 | $43.75 |
| 203E10000 EXCAVATION | 382 CY | $8.00 | $20.00 | $45.25 |
| 203E20000 EMBANKMENT | 65 CY | $15.00 | $20.00 | $27.25 |
| 204E10000 SUBGRADE COMPACTION | 550 SY |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $615 |
| 4% |
| 613E41201 LOW STRENGTH MORTAR BACKFILL, AS PER PLAN | 73 CY | $146 | $120 | $153 | 4% |
| 304E20000 AGGREGATE BASE | 114 CY | $89.05 | $75.00 | $80.00 | 4% |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1.00 | $1.00 | $1.00 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $10,000 | $3,500 | $9,000 | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $10,000 | $3,500 | $4,600 | 3% |
| 202E11000 STRUCTURE REMOVED | 1 LS | $6,500 | $20,000 | $12,000 | 2% |
| 202E20010 HEADWALL REMOVED | 2 EACH | $3,000 | $850 | $750 | 2% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 10 CY | $600 | $500 | $585 | 2% |
| 659E10000 SEEDING AND MULCHING | 1,086 SY | $5.04 | $3.00 | $5.85 | 2% |
| 617E10100 COMPACTED AGGREGATE | 50 CY | $105 | $100 | $56.00 | 2% |
| 621E00100 RPM | 3 EACH | $1,530 | $900 | $1,425 | 2% |
| 611E04400 12" CONDUIT, TYPE B | 70 FT | $60.33 | $100 | $70.25 | 1% |
| 623E38550 MONUMENT ASSEMBLY, TYPE D | 4 EACH | $916 | $600 | $1,300 | 1% |
| $4.00 |
| $1.00 |
| $4.00 |
| 623E40520 RIGHT-OF-WAY MONUMENT, TYPE B | 3 EACH | $306 | $800 | $1,200 |
| 623E50000 PRECONSTRUCTION SURVEY MONUMENT VERIFICATION AND R | 1 LS | $1,500 | $1,500 | $3,350 |
| 623E51000 POST CONSTRUCTION SURVEY MONUMENT VERIFICATION AND | 1 LS | $1,500 | $1,500 | $3,350 |
| 601E32110 ROCK CHANNEL PROTECTION, TYPE B WITH AGGREGATE FIL | 26 CY | $115 | $125 | $135 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 2 CY | $857 | $170 | $350 |
| 659E00300 TOPSOIL | 121 CY | $15.00 | $25.00 | $61.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 54 SY | $2.64 | $3.00 | $3.40 |
| 659E20000 COMMERCIAL FERTILIZER | 0.15 TON | $744 | $850 | $950 |
| 659E31000 LIME | 0.22 ACRE | $60.00 | $35.00 | $39.00 |
| 659E35000 WATER | 6 MGAL | $1.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 48 FT | $30.00 | $14.00 | $24.50 |
| 611E01500 6" CONDUIT, TYPE F | 20 FT | $27.80 | $12.00 | $23.25 |
| 611E02500 8" CONDUIT, TYPE E | 10 FT | $34.00 | $14.00 | $46.25 |
| 611E03700 10" CONDUIT, TYPE F | 23 FT | $38.40 | $75.00 | $42.50 |
| 407E20000 NON-TRACKING TACK COAT | 54 GAL | $3.75 | $2.50 | $2.80 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 3 EACH | $30.00 | $30.00 | $5.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.06 MILE | $10,500 | $20,732 | $7,850 |
| 642E00300 CENTER LINE, TYPE 1 | 0.03 MILE | $21,000 | $27,747 | $15,700 |
| 407E20000 NON-TRACKING TACK COAT | 20 GAL | $3.00 | $2.50 | $2.80 |
| 614E21400 WORK ZONE CENTER LINE, CLASS II | 0.03 MILE | $18,000 | $27,747 | $16,800 |
| 616E10000 WATER | 1 MGAL | $1.00 | $1.00 | $165 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E28000 84" CONDUIT, TYPE A, 706.02, 707.35 or 707.01 w/ C | 50 FT | $1,064 | $53k | 17% |
| 602E20000 CONCRETE MASONRY | 50 CY | $744.07 | $37k | 12% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 57 CY | $637.5 | $36k | 11% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 41 CY | $682.5 | $28k | 9% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $15,000 | $15k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $15,000 | $15k | 5% |
| 253E02000 PAVEMENT REPAIR | 20 CY | $552 | $11k | 3% |
| 613E41201 LOW STRENGTH MORTAR BACKFILL, AS PER PLAN | 73 CY | $146.12 | $11k | 3% |
| 304E20000 AGGREGATE BASE | 114 CY | $89.05 | $10k | 3% |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1 | $10k | 3% |