ASD-US 30-09.32L Bridge Hit
ASD County · est $0.2M
Bid dateThursday, March 27—
ASD County · est $0.2M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 18items by winning bid’s extended amount.
| Item | Quantity | R1Eius Company | R2Bcc Ohio INC | R3Adena Corporation | R4S E T INC | R5Stanley Miller Construction Company | % of bid |
|---|---|---|---|---|---|---|---|
| 517E72300 RAILING (DEEP BEAM RAIL WITH STEEL TUBULAR BACKUP | 118.75 FT | $207 | $216 | $312 | $225 | $219 | 25% |
| 511E31610 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 10 CY | $1,807 | $2,143 | $2,836 | $4,000 | $12,137 | 18% |
| 202E11301 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 10 CY | $1,560 | $1,614 | $2,946 | $7,050 | $7,568 | 16% |
| 517E75600 DEEP BEAM BRIDGE RETROFIT RAILING | 118.75 FT | $113 | $119 | $174 | $115 | $120 | 13% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $7,722 | $4,539 | $15,683 | $1,000 | $5,367 | 8% |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 138.5 FT |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $21.84 |
| $21.65 |
| $37.27 |
| $20.00 |
| $14.00 |
| 3% |
| 624E10000 MOBILIZATION | 1 LS | $2,661 | $4,345 | $12,887 | $20,000 | $20,334 | 3% |
| 642E30030 REMOVAL OF PAVEMENT MARKING | 0.47 MILE | $5,565 | $5,830 | $9,329 | $2,500 | $4,444 | 3% |
| 606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 4 | 2 EACH | $1,239 | $1,298 | $2,208 | $1,250 | $1,311 | 2% |
| 606E13000 GUARDRAIL, TYPE 5 | 93.75 FT | $25.20 | $26.40 | $45.27 | $26.00 | $27.00 | 2% |
| 642E00204 LANE LINE, 6", TYPE 1 | 0.33 MILE | $4,725 | $4,950 | $13,287 | $4,500 | $5,556 | 2% |
| 509E10001 EPOXY COATED STEEL REINFORCEMENT, AS PER PLAN | 176 LB | $8.11 | $9.34 | $4.85 | $2.50 | $5.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $1,246 | $1,325 | $3,887 | $3,500 | $4,000 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1,010 | $880 | $5,660 | $100 | $6,945 | 1% |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 1% |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 25 SY | $23.72 | $128 | $157 | $30.00 | $103 | 1% |
| 202E38000 GUARDRAIL REMOVED | 93.75 FT | $3.36 | $3.52 | $31.84 | $3.50 | $16.00 | 0% |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 2 EACH | $99.75 | $105 | $498 | $105 | $725 | 0% |
| Item | Qty | Unit price | Extended | % |
|---|
| 517E72300 RAILING (DEEP BEAM RAIL WITH STEEL TUBULAR BACKUP | 118.75 FT | $206.64 | $25k | 25% |
| 511E31610 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 10 CY | $1,807 | $18k | 18% |
| 202E11301 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 10 CY | $1,560 | $16k | 16% |
| 517E75600 DEEP BEAM BRIDGE RETROFIT RAILING | 118.75 FT | $113.4 | $13k | 13% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $7,722 | $8k | 8% |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 138.5 FT | $21.84 | $3k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $2,661 | $3k | 3% |
| 642E30030 REMOVAL OF PAVEMENT MARKING | 0.47 MILE | $5,565 | $3k | 3% |
| 606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 4 | 2 EACH | $1,239 | $2k | 2% |
| 606E13000 GUARDRAIL, TYPE 5 | 93.75 FT | $25.2 | $2k | 2% |