AUG-St Marys Indiana Walks SA22
AUG County · est $1.4M
Bid dateThursday, May 22—
AUG County · est $1.4M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 90 more items below.
| Item | Quantity | R1Perram Electric INC | R2Brumbaugh Construction INC | R3L J Deweese CO INC | R4R B Jergens Contractors INC | R5D L Smith Concrete LLC | % of bid |
|---|---|---|---|---|---|---|---|
| 608E10001 4" CONCRETE WALK, AS PER PLAN | 16,318 SF | $9.00 | $9.25 | $11.00 | $8.93 | $15.00 | 17% |
| 632E79151 COMBINATION SIGNAL SUPPORT, TYPE TC-81.22, DESIGN | 4 EACH | $21,190 | $21,190 | $23,000 | $25,894 | $26,950 | 10% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 8 EACH | $9,165 | $8,877 | $9,000 | $10,516 | $10,945 | 8% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $60,700 | $53,326 | $38,000 | $26,905 | $49,000 | 7% |
| 632E64011 SIGNAL SUPPORT FOUNDATION, AS PER PLAN | 7 EACH | $8,066 | $8,066 | $9,500 | $8,244 | $8,580 | 7% |
| Item | Quantity | R1Perram Electric INC | R2Brumbaugh Construction INC | R3L J Deweese CO INC | R4R B Jergens Contractors INC | R5D L Smith Concrete LLC |
|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1.00 | $5,000 | $2,500 | $11,462 | $10,500 |
| 202E30000 WALK REMOVED | 576 SF | $4.00 | $7.00 | $5.00 | $5.31 | $4.00 |
| 202E32000 CURB REMOVED | 276 FT | $12.00 | $28.00 | $15.00 | $10.71 | $15.00 |
| 202E75610 VALVE BOX REMOVED | 2 EACH | $250 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 657 SY |
| $77.00 |
| $110 |
| $135 |
| $87.25 |
| $115 |
| 6% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $70,000 | $38,000 | $55,000 | $45,500 | 5% |
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 4 EACH | $9,455 | $9,150 | $9,500 | $10,886 | $11,330 | 4% |
| 632E79141 COMBINATION SIGNAL SUPPORT, TYPE TC-81.22, DESIGN | 2 EACH | $18,855 | $18,855 | $21,000 | $22,618 | $23,540 | 4% |
| 203E10000 EXCAVATION | 881 CY | $40.00 | $40.00 | $35.00 | $30.66 | $60.00 | 4% |
| 633E65511 CABINET, TYPE TS-2, AS PER PLAN | 2 EACH | $17,340 | $16,720 | $18,000 | $21,032 | $21,890 | 4% |
| 202E23000 PAVEMENT REMOVED | 845 SY | $38.00 | $14.00 | $36.00 | $21.31 | $9.00 | 4% |
| 659E00300 TOPSOIL | 500 CY | $60.00 | $97.00 | $55.00 | $71.71 | $35.00 | 3% |
| 625E25909 CONDUIT, JACKED OR DRILLED, 725.052, AS PER PLAN, | 498 FT | $52.10 | $52.10 | $53.00 | $56.02 | $58.30 | 3% |
| 632E90400 SIGNALIZATION, MISC.:COMBINATION SIGNAL SUPPORT (S | 1 EACH | $24,430 | $24,430 | $26,000 | $29,857 | $31,075 | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $22,040 | $12,500 | $15,000 | $15,676 | $45,729 | 3% |
| 632E05007 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 23 EACH | $928 | $928 | $950 | $1,585 | $1,650 | 2% |
| 609E12001 COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN | 378 FT | $53.00 | $60.00 | $65.00 | $49.68 | $42.00 | 2% |
| 632E64011 SIGNAL SUPPORT FOUNDATION, AS PER PLAN | — | $18,130 | $18,130 | $21,000 | $25,894 | $26,950 | 2% |
| 632E20751 ACCESSIBLE PEDESTRIAN PUSHBUTTON, AS PER PLAN | 16 EACH | $1,018 | $1,018 | $1,200 | $1,004 | $1,045 | 2% |
| $330 |
| $250 |
| $533 |
| $500 |
| 202E98100 REMOVAL MISC.:BOULDER | 1 EACH | $425 | $250 | $25.00 | $4,420 | $500 |
| 203E20000 EMBANKMENT | 284 CY | $35.00 | $40.00 | $55.00 | $21.44 | $35.00 |
| 204E10000 SUBGRADE COMPACTION | 347 SY | $3.50 | $4.00 | $3.00 | $15.43 | $2.50 |
| 608E52000 CURB RAMP | 1,554 SF | $9.00 | $28.00 | $22.00 | $20.63 | $20.00 |
| 623E40900 MONUMENT, MISC.:POST CONSTRUCTION MONUMENT VERIFIC | 1 EACH | $1,560 | $4,000 | $5,000 | $2,466 | $4,000 |
| 623E40900 MONUMENT, MISC.:RECONSTRUCTION MONUMENT VERIFICATI | 1 EACH | $1,960 | $4,000 | $5,000 | $2,466 | $4,000 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 4,500 SY | $2.05 | $2.00 | $2.00 | $2.11 | $4.50 |
| 659E14000 REPAIR SEEDING AND MULCHING | 225 SY | $3.00 | $1.00 | $10.00 | $1.06 | $3.00 |
| 659E15000 INTER-SEEDING | 225 SY | $3.00 | $1.00 | $5.00 | $1.06 | $2.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.61 TON | $1,500 | $1,000 | $1,200 | $634 | $650 |
| 659E31000 LIME | 0.1 ACRE | $1,200 | $5.00 | $1,200 | $106 | $200 |
| 659E35000 WATER | 12.15 MGAL | $50.05 | $5.00 | $50.00 | $10.57 | $25.00 |
| 832E30000 EROSION CONTROL | 15,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 1 CY | $900 | $1,575 | $3,500 | $2,475 | $650 |
| 605E06000 4" BASE PIPE UNDERDRAINS | 162 FT | $20.00 | $40.00 | $10.00 | $12.97 | $20.00 |
| 611E04600 12" CONDUIT, TYPE C | 10 FT | $130 | $105 | $250 | $127 | $95.00 |
| 611E97400 CONDUIT, MISC.:TYPE B FOR DRAINAGE DISCHARGE CONTI | 10 FT | $130 | $35.00 | $30.00 | $72.99 | $68.00 |
| 611E97400 CONDUIT, MISC.:TYPE C FOR DRAINAGE DISCHARGE CONTI | 10 FT | $130 | $27.00 | $30.00 | $72.99 | $68.00 |
| 611E97400 CONDUIT, MISC.:TYPE E FOR DRAINAGE DISCHARGE CONTI | 10 FT | $130 | $35.00 | $30.00 | $72.99 | $68.00 |
| 611E97400 CONDUIT, MISC.:TYPE F FOR DRAINAGE DISCHARGE CONTI | 10 FT | $130 | $27.00 | $30.00 | $72.99 | $68.00 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 2 EACH | $1,100 | $450 | $900 | $808 | $1,850 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 4 EACH | $1,100 | $500 | $1,200 | $1,378 | $1,500 |
| 611E99720 INSPECTION WELL | 1 EACH | $1,000 | $1,100 | $1,500 | $2,581 | $1,500 |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 5 CY | $545 | $950 | $600 | $575 | $305 |
| 304E20000 AGGREGATE BASE | 147 CY | $80.00 | $115 | $125 | $102 | $78.00 |
| 407E20000 NON-TRACKING TACK COAT | 12 GAL | $5.25 | $100 | $50.00 | $5.55 | $15.00 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 162 CY | $80.00 | $115 | $125 | $190 | $85.00 |
| 442E22100 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 7 CY | $627 | $950 | $800 | $663 | $365 |
| 442E22120 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 2 CY | $627 | $950 | $800 | $663 | $365 |
| 442E22400 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 12 CY | $576 | $950 | $800 | $609 | $335 |
| 442E22420 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 3 CY | $576 | $950 | $800 | $609 | $335 |
| 452E13010 9" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 45 SY | $102 | $150 | $175 | $329 | $130 |
| 609E26001 CURB, TYPE 6, AS PER PLAN | 225 FT | $38.00 | $45.00 | $55.00 | $35.78 | $38.00 |
| 638E10200 6" FIRE HYDRANT | 1 EACH | $11,500 | $12,500 | $9,800 | $7,148 | $8,500 |
| 638E10480 FIRE HYDRANT REMOVED | 1 EACH | $5,000 | $1,500 | $1,200 | $1,190 | $1,500 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 4 EACH | $250 | $150 | $800 | $665 | $950 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 83 FT | $22.30 | $17.00 | $15.00 | $21.68 | $16.50 |
| 630E79101 SIGN HANGER ASSEMBLY, MAST ARM, AS PER PLAN | 24 EACH | $380 | $445 | $400 | $525 | $440 |
| 630E80100 SIGN, FLAT SHEET | 45 SF | $28.00 | $27.00 | $24.00 | $21.45 | $26.40 |
| 630E80101 SIGN, FLAT SHEET, AS PER PLAN | 115 SF | $36.85 | $36.00 | $32.00 | $25.04 | $64.24 |
| 630E80511 SIGN, STREET NAME, AS PER PLAN | 8 EACH | $515 | $305 | $275 | $411 | $303 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 15 EACH | $54.65 | $30.00 | $25.00 | $17.52 | $27.50 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 9 EACH | $56.95 | $30.00 | $25.00 | $23.37 | $27.50 |
| 642E30000 REMOVAL OF PAVEMENT MARKING | 1,045 FT | $3.00 | $3.00 | $3.00 | $4.91 | $3.30 |
| 644E00500 STOP LINE | 360 FT | $10.00 | $8.00 | $7.00 | $5.76 | $7.70 |
| 644E00620 CROSSWALK LINE, 12" | 1,458 FT | $3.00 | $4.00 | $4.00 | $4.39 | $4.40 |
| 644E01300 LANE ARROW | 1 EACH | $200 | $125 | $125 | $275 | $110 |
| 611E00400 4" CONDUIT, TYPE E | 180 FT | $4.80 | $4.80 | $5.00 | $5.28 | $5.50 |
| 625E18201 BRACKET ARM, 15', AS PER PLAN | 9 EACH | $1,065 | $1,065 | $1,200 | $1,163 | $1,210 |
| 625E25408 CONDUIT, 2", 725.051 | 171 FT | $11.85 | $11.80 | $12.00 | $12.68 | $13.20 |
| 625E25504 CONDUIT, 3", 725.051 | 112 FT | $15.15 | $15.15 | $16.00 | $14.80 | $15.40 |
| 625E25604 CONDUIT, 4", 725.051 | 92 FT | $19.65 | $19.65 | $20.00 | $21.14 | $22.00 |
| 625E25909 CONDUIT, JACKED OR DRILLED, 725.052, AS PER PLAN, | 449 FT | $33.55 | $33.55 | $34.00 | $48.62 | $50.60 |
| 625E25909 CONDUIT, JACKED OR DRILLED, 725.052, AS PER PLAN, | 285 FT | $47.82 | $47.82 | $48.00 | $49.67 | $51.70 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 9 EACH | $515 | $515 | $520 | $581 | $605 |
| 625E29000 TRENCH | 329 FT | $19.35 | $19.35 | $20.00 | $15.85 | $16.50 |
| 625E30700 PULL BOX, 725.08, 18" | 6 EACH | $1,855 | $1,855 | $2,000 | $1,110 | $1,155 |
| 625E30706 PULL BOX, 725.08, 24" | 3 EACH | $2,055 | $2,055 | $2,200 | $1,427 | $1,485 |
| 625E32000 GROUND ROD | 20 EACH | $340 | $340 | $350 | $317 | $330 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 329 FT | $1.30 | $1.30 | $1.30 | $3.17 | $3.30 |
| 625E75400 LIGHT POLE REMOVED | 2 EACH | $615 | $615 | $620 | $370 | $385 |
| 625E75500 LIGHT POLE FOUNDATION REMOVED | 2 EACH | $615 | $615 | $620 | $264 | $275 |
| 632E05065 VEHICULAR SIGNAL HEAD, (LED), 4-SECTION, 12" LENS, | 4 EACH | $1,125 | $1,125 | $1,200 | $1,850 | $1,925 |
| 632E20731 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN, | 16 EACH | $600 | $600 | $600 | $951 | $990 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 27 EACH | $10.00 | $10.00 | $10.00 | $42.28 | $44.00 |
| 632E25010 COVERING OF PEDESTRIAN SIGNAL HEAD | 16 EACH | $5.00 | $5.00 | $5.00 | $31.71 | $3.30 |
| 632E40300 SIGNAL CABLE, 3 CONDUCTOR, NO. 14 AWG | 3,438 FT | $2.40 | $2.40 | $2.50 | $3.06 | $3.19 |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 4,505 FT | $2.86 | $2.86 | $3.00 | $3.38 | $3.52 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 3,513 FT | $3.30 | $3.30 | $3.40 | $3.59 | $3.74 |
| 632E42300 SIGNAL CABLE, 3 CONDUCTOR, NO. 12 AWG | 2,408 FT | $2.93 | $2.93 | $3.00 | $2.75 | $2.86 |
| 632E64020 PEDESTAL FOUNDATION | 10 EACH | $1,520 | $1,520 | $1,700 | $1,533 | $1,595 |
| 632E68300 POWER CABLE, 3 CONDUCTOR, NO. 6 AWG | 58 FT | $7.60 | $7.60 | $8.00 | $9.51 | $9.90 |
| 632E69350 POWER CABLE, MISC.:1/0, 600 VOLTS | 496 FT | $16.15 | $16.15 | $17.00 | $10.57 | $11.00 |
| 632E70001 POWER SERVICE, AS PER PLAN | 2 EACH | $3,920 | $3,920 | $5,000 | $2,642 | $2,750 |
| 632E79111 COMBINATION SIGNAL SUPPORT, TYPE TC-81.22, DESIGN | 1 EACH | $11,550 | $11,550 | $13,000 | $13,317 | $13,860 |
| 632E89803 PEDESTAL, 5', TRANSFORMER BASE, AS PER PLAN | 1 EACH | $1,115 | $1,115 | $1,300 | $661 | $688 |
| 632E89901 PEDESTAL, 8', TRANSFORMER BASE, AS PER PLAN | 9 EACH | $1,133 | $1,133 | $1,300 | $846 | $880 |
| 632E90101 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, AS PER PLA | 2 EACH | $6,560 | $6,560 | $7,500 | $4,016 | $4,180 |
| 633E67100 CABINET FOUNDATION | 2 EACH | $3,550 | $3,550 | $4,000 | $3,382 | $3,520 |
| 633E67201 CONTROLLER WORK PAD, AS PER PLAN | 2 EACH | $630 | $630 | $700 | $666 | $693 |
| 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS | 2 EACH | $5,735 | $5,735 | $6,000 | $6,658 | $6,930 |
| 809E69123 ATC CONTROLLER, AS PER PLAN | 2 EACH | $5,765 | $5,545 | $5,750 | $7,715 | $8,030 |
| 815E30001 SPREAD SPECTRUM RADIO, AS PER PLAN | 2 EACH | $3,495 | $3,495 | $3,700 | $4,228 | $4,400 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 16 HOUR | $100 | $100 | $120 | $159 | $75.00 |
| 616E10000 WATER | 15 MGAL | $50.00 | $5.00 | $50.00 | $194 | $1.00 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $10,550 | $18,500 | $15,000 | $36,498 | $15,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 608E10001 4" CONCRETE WALK, AS PER PLAN | 16,318 SF | $9 | $147k | 11% |
| 632E79151 COMBINATION SIGNAL SUPPORT, TYPE TC-81.22, DESIGN | 4 EACH | $21,190 | $85k | 6% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 8 EACH | $9,165 | $73k | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $60,700 | $61k | 5% |
| 632E64011 SIGNAL SUPPORT FOUNDATION, AS PER PLAN | 7 EACH | $8,066 | $56k | 4% |
| 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 657 SY | $77 | $51k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 3% |
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 4 EACH | $9,455 | $38k | 3% |
| 632E79141 COMBINATION SIGNAL SUPPORT, TYPE TC-81.22, DESIGN | 2 EACH | $18,855 | $38k | 3% |
| 203E10000 EXCAVATION | 881 CY | $40 | $35k | 3% |