JAC-SR 279-02.59
JAC County · est $0.3M
Bid dateThursday, June 26—
JAC County · est $0.3M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 28 more items below.
| Item | Quantity | R1Fillmore Construction | R2Scioto Valley Paving LLC | R3Alan Stone CO INC | R4Axis Civil Construction LLC | R5D G M INC | % of bid |
|---|---|---|---|---|---|---|---|
| 624E10000 MOBILIZATION | 1 LS | $27,000 | $25,000 | $15,000 | $30,000 | $11,000 | 11% |
| 611E20700 48" CONDUIT, TYPE A, 706.02 | 64 FT | $400 | $800 | $540 | $640 | $1,200 | 11% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 43 CY | $400 | $350 | $420 | $450 | $300 | 7% |
| 611E21100 48" CONDUIT, TYPE C, 706.02 (CLASS V) | 32 FT | $500 | $500 | $580 | $640 | $960 | 7% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 32 CY | $500 | $375 | $530 | $550 | $330 | 7% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG |
| Item | Quantity | R1Fillmore Construction | R2Scioto Valley Paving LLC | R3Alan Stone CO INC | R4Axis Civil Construction LLC | R5D G M INC |
|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,500 | $6,000 | $8,000 | $3,000 | $12,000 |
| 202E23000 PAVEMENT REMOVED | 245 SY | $10.00 | $12.00 | $15.00 | $48.00 | $12.00 |
| 202E58100 CATCH BASIN REMOVED | 1 EACH | $250 | $3,500 | $550 | $1,400 | $1,000 |
| 202E75000 FENCE REMOVED | 210 FT | $10.00 | $12.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 30 CY |
| $500 |
| $50.00 |
| $350 |
| $220 |
| $380 |
| 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $15,000 | $5,500 | $2,300 | $10,000 | $25,000 | 6% |
| 253E02000 PAVEMENT REPAIR | 30 CY | $400 | $2.00 | $470 | $200 | $570 | 5% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 30 CY | $400 | $50.00 | $980 | $220 | $150 | 5% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $10,000 | $5,500 | $4,000 | $5,000 | $15,000 | 4% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $10,000 | $10,000 | $8,100 | $7,000 | $4,000 | 4% |
| 623E40500 REFERENCE MONUMENT, TYPE A | 6 EACH | $1,500 | $908 | $2,300 | $750 | $500 | 4% |
| 611E98570 CATCH BASIN, NO. 2-5 | 1 EACH | $7,500 | $6,500 | $4,300 | $6,000 | $7,000 | 3% |
| 607E15000 FENCE, TYPE 47 | 210 FT | $35.00 | $40.00 | $50.00 | $60.00 | $50.00 | 3% |
| 202E35200 PIPE REMOVED, OVER 24" DIAMETER | 70 FT | $100 | $150 | $190 | $420 | $150 | 3% |
| 602E20000 CONCRETE MASONRY | 2.2 CY | $3,000 | $1,500 | $2,200 | $2,800 | $2,000 | 3% |
| 614E12420 DETOUR SIGNING | 1 LS | $6,200 | $9,645 | $13,000 | $6,200 | $16,500 | 3% |
| 203E20000 EMBANKMENT | 117 CY | $50.00 | $50.00 | $50.00 | $45.00 | $25.00 | 2% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $5,000 | $30,000 | $500 | $7,500 | $500 | 2% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $5,000 | $8,500 | $7,500 | $4,500 | $7,500 | 2% |
| $2.50 |
| $6.00 |
| $5.00 |
| 202E75250 GATE REMOVED | 1 EACH | $100 | $25.00 | $550 | $350 | $200 |
| 203E10000 EXCAVATION | 31 CY | $100 | $45.00 | $20.00 | $45.00 | $35.00 |
| 204E10000 SUBGRADE COMPACTION | 347 SY | $5.00 | $2.00 | $8.50 | $4.00 | $10.00 |
| 607E40500 GATE, TYPE 47 | 1 EACH | $800 | $500 | $3,300 | $1,500 | $1,700 |
| 659E10000 SEEDING AND MULCHING | 378 SY | $4.25 | $8.00 | $4.50 | $8.00 | $8.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 19 SY | $2.00 | $8.00 | $10.00 | $8.00 | $0.05 |
| 659E20000 COMMERCIAL FERTILIZER | 0.05 TON | $1,800 | $1,250 | $730 | $1,250 | $1,500 |
| 659E31000 LIME | 0.08 ACRE | $700 | $150 | $1,000 | $150 | $300 |
| 659E35000 WATER | 2 MGAL | $10.00 | $1.00 | $130 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 601E32110 ROCK CHANNEL PROTECTION, TYPE B WITH AGGREGATE FIL | 9 CY | $200 | $285 | $210 | $200 | $175 |
| 611E06400 15" CONDUIT, TYPE D, 706.02 (CLASS V) | 18 FT | $100 | $250 | $210 | $200 | $170 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 46 FT | $10.00 | $12.00 | $5.50 | $9.00 | $15.00 |
| 304E20000 AGGREGATE BASE | 45 CY | $100 | $150 | $140 | $180 | $110 |
| 407E10000 TACK COAT | 39 GAL | $10.00 | $1.00 | $5.50 | $6.00 | $2.50 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 20 CY | $80.00 | $150 | $190 | $190 | $150 |
| 621E00100 RPM | 7 EACH | $475 | $416 | $660 | $475 | $475 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 7 EACH | $10.00 | $12.00 | $35.00 | $55.00 | $1.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 15.3 FT | $50.00 | $20.00 | $20.00 | $50.00 | $50.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $650 | $150 | $80.00 | $650 | $650 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.08 MILE | $11,250 | $18,444 | $43,000 | $11,250 | $12,000 |
| 642E00300 CENTER LINE, TYPE 1 | 0.04 MILE | $22,250 | $36,888 | $43,000 | $22,250 | $23,000 |
| 407E10000 TACK COAT | 30 GAL | $10.00 | $1.00 | $5.50 | $6.00 | $2.50 |
| 616E10000 WATER | 1 MGAL | $10.00 | $1.00 | $1.50 | $1.00 | $1.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 624E10000 MOBILIZATION | 1 LS | $27,000 | $27k | 10% |
| 611E20700 48" CONDUIT, TYPE A, 706.02 | 64 FT | $400 | $26k | 10% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 43 CY | $400 | $17k | 6% |
| 611E21100 48" CONDUIT, TYPE C, 706.02 (CLASS V) | 32 FT | $500 | $16k | 6% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 32 CY | $500 | $16k | 6% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 30 CY | $500 | $15k | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $15,000 | $15k | 6% |
| 253E02000 PAVEMENT REPAIR | 30 CY | $400 | $12k | 4% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 30 CY | $400 | $12k | 4% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $10,000 | $10k | 4% |