BID #260011 · ODOTRESULT · awarded Feb 19

CUY-IR 480-18.42 Deck Sealing

CUY County · est $2.1M

Bid dateThursday, February 19
Awarded toRAM CONSTRUCTION SERVICES OF MICHIGAN,$1.39M
read → connected → answeredcassandri

Project scope

Bid form · ODOT

33ITEMS
  • Maintaining Traffic33%
  • Structures / Bridge27%
  • Pavement Marking15%
  • Drainage9%
  • Mobilization & General9%
  • Guardrail & Barrier3%
  • Other3%

Top items by winning bid

ItemQtyUnit priceExtended%
512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE37,109 SY$8.98$333k24%
512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE34,375 SY$8.98$309k22%
512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE33,660 SY$8.98$302k22%
614E11000 MAINTAINING TRAFFIC1 LS$135,290$135k10%
624E10000 MOBILIZATION Section 6 - INCIDENTALS - Totals Awd $220,996.11 2 $365,000.00 3 $530,420.00 4 $365,000.00 5 $290,000.00 6 $443,000.001 LS$52,481$52k4%
614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST500 HOUR$70$35k3%
614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN32 SNMT$1,015$32k2%
645E30000 REMOVAL OF PAVEMENT MARKINGS Section 1 - TRAFFIC CONTROL - Totals Awd $75,558.00 2 $90,544.50 3 $130,197.60 4 $75,558.00 5 $113,106.50 6 $155,881.5068,270 FT$0.4$27k2%
646E10010 EDGE LINE, 6"6.4 MILE$2,755$18k1%
614E12420 DETOUR SIGNING Section 2 - MAINTENANCE OF TRAFFIC - Totals Awd $115,220.99 2 $61,070.00 3 $194,884.40 4 $133,584.99 5 $143,255.41 6 $183,580.501 LS$15,482$15k1%

Per-bidder unit pricing

ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 13 more items below.

Rank 1Ram Construction Services Of Michigan,$1.39MRank 2INC Aad Contracting INC$1.72MRank 3Catts Construction INC$1.94MRank 4Corrosion Resistance LTD$1.96MRank 5Athos Contracting$1.97MRank 6Ohio Concrete Maintenance LLC$2.59M
ItemQuantityR1Ram Construction Services Of Michigan,R2INC Aad Contracting INCR3Catts Construction INCR4Corrosion Resistance LTDR5Athos ContractingR6Ohio Concrete Maintenance LLC
512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE37,109 SY$8.98$10.80$9.75$11.50$13.00$16.41
512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE34,375 SY$8.98$10.80$9.75$11.50$13.00$16.41
512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE33,660 SY$8.98$10.80$9.75$11.50$13.00$16.41
614E11000 MAINTAINING TRAFFIC1 LS$135,290$320,000$327,225$260,000$125,000$270,000
624E10000 MOBILIZATION Section 6 - INCIDENTALS - Totals Awd $220,996.11 2 $365,000.00 3 $530,420.00 4 $365,000.00 5 $290,000.00 6 $443,000.001 LS$52,481$38,000$175,000$75,000$105,000$130,000
614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST500 HOUR$70.00$30.00$125$110$75.00$120
614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN32 SNMT$1,015$300$1,000$1,015$1,015$1,200
645E30000 REMOVAL OF PAVEMENT MARKINGS Section 1 - TRAFFIC CONTROL - Totals Awd $75,558.00 2 $90,544.50 3 $130,197.60 4 $75,558.00 5 $113,106.50 6 $155,881.5068,270 FT$0.40$1.00$1.00$0.40$0.95$1.50
646E10010 EDGE LINE, 6"6.4 MILE$2,755$1,000$3,550$2,755$2,755$3,000
614E12420 DETOUR SIGNING Section 2 - MAINTENANCE OF TRAFFIC - Totals Awd $115,220.99 2 $61,070.00 3 $194,884.40 4 $133,584.99 5 $143,255.41 6 $183,580.501 LS$15,482$16,000$85,000$15,482$15,482$20,000
103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM1 LS$14,000$4,000$21,000$20,000$45,000$27,000
646E10111 LANE LINE, 6", AS PER PLAN6 MILE$1,985$1,000$2,550$1,985$1,985$2,200
614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT6.4 MILE$1,815$1,000$1.00$1,625$3,750$4,200
623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING1 LS$10,000$1,000$750$5,000$5,000$5,000
100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY1 LS$9,225$2,000$6,445$5,000$10,000$11,000
630E97800 SIGNING, MISC.:ADDITIONAL SIGNS, GROUND MOUNTED, A300 SF$22.16$22.16$28.50$22.16$22.16$25.00
646E20510 DOTTED LINE, 12"5,018 FT$1.30$0.75$1.70$1.30$1.30$1.50
614E24618 WORK ZONE DOTTED LINE, CLASS III, 12", 642 PAINT5,018 FT$1.25$1.00$1.00$1.25$2.00$2.25
614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT6 MILE$835$100$1.00$765$2,175$2,500
512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE)150 SY$32.80$50.00$57.00$40.00$55.00$50.00
Show all 33 line items
ItemQuantityR1Ram Construction Services Of Michigan,R2INC Aad Contracting INCR3Catts Construction INCR4Corrosion Resistance LTDR5Athos ContractingR6Ohio Concrete Maintenance LLC
621E00301 RPM REFLECTOR, AS PER PLAN50 EACH$70.15$35.00$91.00$70.15$70.15$78.00
626E00102 BARRIER REFLECTOR, TYPE 1, (1WAY)100 EACH$20.50$10.00$26.50$20.50$20.50$23.00
646E10310 CHANNELIZING LINE, 12"1,804 FT$1.35$0.75$1.75$1.35$1.35$1.50
646E10620 CHEVRON MARKING502 FT$8.35$4.00$10.00$8.35$8.35$9.25
614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P1,804 FT$1.50$1.00$1.00$1.50$2.25$2.50
512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE150 SY$28.70$50.00$52.00$40.00$55.00$30.00
518E62200 STRUCTURE DRAINAGE, MISC.: SCUPPER CLEANOUT Section 3 - STRUCTURE REPAIR (CUY-480-17.723R) - Totals Awd $320,792.50 2 $395,250.00 3 $353,456.25 4 $453,812.50 5 $466,375.00 6 $591,093.7530 EACH$96.00$300$65.00$1,550$100$500
512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE)150 SY$32.80$50.00$57.00$40.00$55.00$50.00
512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE150 SY$28.70$50.00$52.00$40.00$55.00$30.00
518E62200 STRUCTURE DRAINAGE, MISC.: SCUPPER CLEANOUT Section 4 - STRUCTURE REPAIR (CUY-480-18.723C) - Totals Awd $345,343.82 2 $424,777.20 3 $380,112.75 4 $485,253.50 5 $501,917.00 6 $635,958.6930 EACH$96.00$300$65.00$1,550$100$500
512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE)150 SY$32.80$50.00$57.00$40.00$55.00$50.00
512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE150 SY$28.70$50.00$52.00$40.00$55.00$30.00
518E62200 STRUCTURE DRAINAGE, MISC.: SCUPPER CLEANOUT Section 5 - STRUCTURE REPAIR (CUY-480-18.723L) - Totals Awd $314,371.80 2 $387,528.00 3 $346,485.00 4 $445,590.00 5 $457,080.00 6 $579,360.6030 EACH$96.00$300$65.00$1,550$100$500

Project details

Description
CUY-IR 480-18.42 Deck Sealing
Type of work
Bridge

How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →