D12-PPM FY2026
D12 County · est $2.1M
Bid dateThursday, January 15—
Awarded toKARVO COMPANIES INC$2.38M
D12 County · est $2.1M
Bid form · ODOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 424E14100 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B | 449 (1286 CY | $325 | $418k | 18% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $300,000 | $300k | 13% |
| 442E22101 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 710 CY | $375 | $266k | 11% |
| 253E02001 PAVEMENT REPAIR, AS PER PLAN | 150 CY | $1,500 | $225k | 9% |
| 624E10000 MOBILIZATION Section 8 - INCIDENTALS - Totals Awd $485,000.00 2 $803,000.00 3 $465,199.86 4 $726,373.02 | 1 LS | $150,000 | $150k | 6% |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A | — | $3 | $139k | 6% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 700 HOUR | $125 | $88k | 4% |
| 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN | 526 SY | $150 | $79k | 3% |
| 254E01010 PAVEMENT PLANING, PORTLAND CEMENT CONCRETE(1.5") | 6,937 SY | $10 | $69k | 3% |
| 255E12001 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 177 SY | $325 | $58k | 2% |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 72 more items below.
| Item | Quantity | R1Karvo Companies INC | R2Geauga Highway CO | R3Ronyak Paving INC | R4Kokosing Construction Company INC | % of bid |
|---|---|---|---|---|---|---|
| 424E14100 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B | 449 (1286 CY | $325 | $290 | $305 | $417 | 20% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $300,000 | $742,000 | $250,000 | $523,279 | 14% |
| 442E22101 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 710 CY | $375 | $350 | $405 | $540 | 13% |
| 253E02001 PAVEMENT REPAIR, AS PER PLAN | 150 CY | $1,500 | $2,200 | $2,675 | $5,500 | 11% |
| 624E10000 MOBILIZATION Section 8 - INCIDENTALS - Totals Awd $485,000.00 2 $803,000.00 3 $465,199.86 4 $726,373.02 | 1 LS | $150,000 | $35,000 | $190,000 | $182,000 | 7% |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A | — | $3.00 | $1.75 | $2.50 | $3.70 | 7% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 700 HOUR | $125 | $100 | $100 | $135 | 4% |
| 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN | 526 SY | $150 | $80.00 | $170 | $275 | 4% |
| 254E01010 PAVEMENT PLANING, PORTLAND CEMENT CONCRETE(1.5") | 6,937 SY | $10.00 | $5.50 | $15.00 | $8.40 | 3% |
| 255E12001 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 177 SY | $325 | $180 | $400 | $207 | 3% |
| 608E52001 CURB RAMP, AS PER PLAN | 2,473 SF | $20.00 | $22.00 | $50.00 | $27.00 | 2% |
| 202E30000 WALK REMOVED | 2,639 SF | $18.00 | $3.00 | $5.00 | $11.00 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (1.5") | 10,125 SY | $3.50 | $2.00 | $5.50 | $2.05 | 2% |
| 252E01001 FULL DEPTH RIGID PAVEMENT REMOVAL AND FLEXIBLE REP | 100 SY | $350 | $350 | $475 | $950 | 2% |
| 252E01001 FULL DEPTH RIGID PAVEMENT REMOVAL AND FLEXIBLE REP | 100 SY | $350 | $350 | $750 | $950 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $25,000 | $25,000 | $17,700 | $14,500 | 1% |
| 202E32000 CURB REMOVED | 445 FT | $50.00 | $4.50 | $15.00 | $15.00 | 1% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 24 SNMT | $900 | $900 | $900 | $900 | 1% |
| 611E99900 DRAINAGE STRUCTURE, MISC.: CLEANOUT Section 3 - DRAINAGE - Totals Awd $76,250.00 2 $42,250.00 3 $63,075.00 4 $70,070.00 | 26 EACH | $750 | $300 | $475 | $945 | 1% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 150 CY | $125 | $100 | $250 | $125 | 1% |
| Item | Quantity | R1Karvo Companies INC | R2Geauga Highway CO | R3Ronyak Paving INC | R4Kokosing Construction Company INC |
|---|---|---|---|---|---|
| 203E10000 EXCAVATION | 25 CY | $25.00 | $80.00 | $60.00 | $50.00 |
| 209E60201 LINEAR GRADING, AS PER PLAN | 62 STA | $45.00 | $100 | $100 | $85.00 |
| 608E10000 4" CONCRETE WALK | 107 SF | $15.00 | $12.50 | $30.00 | $27.00 |
| 623E39501 MONUMENT ASSEMBLY ADJUSTED TO GRADE, AS PER PLAN | 6 EACH | $1,200 | $950 | $1,785 | $802 |
| 623E39601 MONUMENT ASSEMBLY RECONSTRUCTED TO GRADE, AS PER P Section 1 - ROADWAY - Totals Awd $135,932.00 2 $82,563.00 3 $170,840.00 4 $121,316.00 | 3 EACH | $1,500 | $1,000 | $1,900 | $1,540 |
| 832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $1,000.00 2 $1,000.00 3 $1,000.00 4 $1,000.00 | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 1 EACH | $2,000 | $1,100 | $2,100 | $1,750 |
| 611E98631 CATCH BASIN ADJUSTED TO GRADE, AS PER PLAN | 6 EACH | $2,000 | $1,150 | $2,100 | $1,675 |
| 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE | 3 EACH | $2,250 | $1,850 | $1,625 | $2,625 |
| 611E99151 INLET ADJUSTED TO GRADE, AS PER PLAN | 3 EACH | $3,000 | $1,100 | $1,475 | $1,675 |
| 611E99154 INLET RECONSTRUCTED TO GRADE | 3 EACH | $3,500 | $1,850 | $1,625 | $2,625 |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 3 EACH | $2,000 | $1,100 | $1,450 | $1,450 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 3,500 LB | $3.00 | $2.50 | $5.00 | $2.45 |
| 252E01001 FULL DEPTH RIGID PAVEMENT REMOVAL AND FLEXIBLE REP | 50 SY | $250 | $230 | $700 | $850 |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 104 FT | $5.00 | $8.50 | $20.00 | $4.00 |
| 304E20000 AGGREGATE BASE | 25 CY | $125 | $125 | $70.00 | $100 |
| 407E20000 NON-TRACKING TACK COAT | 5,075 GAL | $2.30 | $4.00 | $7.00 | $2.79 |
| 609E26000 CURB, TYPE 6 | 77 FT | $125 | $20.00 | $50.00 | $55.00 |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 40 CY | $200 | $200 | $200 | $75.00 |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 2,483 LB | $1.00 | $3.50 | $4.00 | $0.85 |
| 407E13900 TACK COAT, 702.13 Section 4 - PAVEMENT - Totals Awd $1,408,474.50 2 $1,292,078.25 3 $1,740,787.00 4 $2,436,851.95 | 555 GAL | $2.50 | $6.00 | $10.00 | $3.50 |
| 638E10801 VALVE BOX ADJUSTED TO GRADE, AS PER PLAN Section 5 - WATER WORK - Totals Awd $4,500.00 2 $1,950.00 3 $3,000.00 4 $4,620.00 | 3 EACH | $1,500 | $650 | $1,000 | $1,540 |
| 620E00500 DELINEATOR, POST GROUND MOUNTED | 35 EACH | $125 | $125 | $125 | $245 |
| 621E00100 RPM | 106 EACH | $96.00 | $50.00 | $96.00 | $96.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 92 EACH | $1.00 | $30.00 | $5.00 | $9.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 4 EACH | $50.00 | $150 | $75.00 | $50.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 8 EACH | $60.00 | $100 | $75.00 | $60.00 |
| 646E10000 EDGE LINE, 4" | 0.27 MILE | $3,900 | $5,000 | $3,900 | $3,900 |
| 646E10010 EDGE LINE, 6" | 1.34 MILE | $4,075 | $5,500 | $4,075 | $4,075 |
| 646E10100 LANE LINE, 4" | 2.91 MILE | $1,885 | $3,250 | $1,885 | $1,885 |
| 646E10200 CENTER LINE | 1.88 MILE | $4,755 | $5,750 | $4,755 | $4,755 |
| 646E10300 CHANNELIZING LINE, 8" | 1,745 FT | $1.65 | $2.50 | $1.65 | $1.65 |
| 646E10310 CHANNELIZING LINE, 12" | 395 FT | $2.25 | $3.50 | $2.25 | $2.25 |
| 646E10400 STOP LINE | 431 FT | $12.75 | $10.00 | $12.75 | $12.75 |
| 646E10510 CROSSWALK LINE, 12" | 1,756 FT | $5.30 | $9.50 | $5.30 | $5.30 |
| 646E10600 TRANSVERSE/DIAGONAL LINE | 511 FT | $9.00 | $10.00 | $9.00 | $9.00 |
| 646E10620 CHEVRON MARKING | 70 FT | $13.00 | $10.00 | $13.00 | $13.00 |
| 646E10800 ISLAND MARKING | 300 SF | $6.75 | $10.00 | $6.75 | $6.75 |
| 646E20300 LANE ARROW | 47 EACH | $165 | $185 | $165 | $165 |
| 646E20320 WRONG WAY ARROW | 1 EACH | $335 | $375 | $335 | $335 |
| 646E20502 DOTTED LINE, 4" | 135 FT | $1.99 | $2.00 | $1.99 | $1.99 |
| 690E98400 SPECIAL - INVENTORY EXISTING PAVEMENT MARKINGS | 1 LS | $2,800 | $1,250 | $2,800 | $2,800 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.95 MILE | $2,655 | $3,250 | $2,655 | $2,655 |
| 642E00204 LANE LINE, 6", TYPE 1 | 0.95 MILE | $1,175 | $2,500 | $1,175 | $1,175 |
| 642E00404 CHANNELIZING LINE, 12", TYPE 1 Section 6 - TRAFFIC CONTROL - Totals Awd $78,743.45 2 $95,972.00 3 $79,331.45 4 $83,679.45 | 620 FT | $2.55 | $2.50 | $2.55 | $2.55 |
| 614E12484 WORK ZONE INCREASED PENALTIES SIGN | 10 EACH | $175 | $175 | $175 | $175 |
| 614E20100 WORK ZONE LANE LINE, CLASS I, 4", 642 PAINT | 2.91 MILE | $775 | $675 | $775 | $775 |
| 614E20550 WORK ZONE LANE LINE, CLASS III, 4", 642 PAINT | 2.91 MILE | $750 | $675 | $750 | $750 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 1.88 MILE | $1,355 | $1,250 | $1,355 | $1,355 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 1.88 MILE | $1,175 | $1,250 | $1,175 | $1,175 |
| 614E22100 WORK ZONE EDGE LINE, CLASS I, 4", 642 PAINT | 0.27 MILE | $788 | $850 | $788 | $788 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 2.26 MILE | $888 | $1,250 | $888 | $888 |
| 614E22350 WORK ZONE EDGE LINE, CLASS III, 4", 642 PAINT | 0.27 MILE | $775 | $1,000 | $775 | $775 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 1.31 MILE | $775 | $1,250 | $775 | $775 |
| 614E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 642 PAIN | 1,745 FT | $0.76 | $0.75 | $0.76 | $0.76 |
| 614E23210 WORK ZONE CHANNELIZING LINE, CLASS I, 12", 642 PAI | 1,015 FT | $0.87 | $0.85 | $0.87 | $0.87 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 1,745 FT | $0.70 | $0.75 | $0.70 | $0.70 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 395 FT | $0.82 | $0.85 | $0.82 | $0.82 |
| 614E24200 WORK ZONE DOTTED LINE, CLASS I, 4", 642 PAINT | 135 FT | $0.88 | $0.65 | $0.88 | $0.88 |
| 614E24610 WORK ZONE DOTTED LINE, CLASS III, 4", 642 PAINT | 135 FT | $0.85 | $0.65 | $0.85 | $0.85 |
| 614E25200 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS I, 642 P | 581 FT | $2.75 | $3.75 | $2.75 | $2.75 |
| 614E25620 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS III, 642 | 581 FT | $2.55 | $3.75 | $2.55 | $2.55 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 396 FT | $3.20 | $3.75 | $3.20 | $3.20 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 396 FT | $3.00 | $3.75 | $3.00 | $3.00 |
| 614E27050 WORK ZONE CROSSWALK LINE, CLASS I, 12", 642 PAINT | 1,587 FT | $2.15 | $3.50 | $2.15 | $2.15 |
| 614E27250 WORK ZONE CROSSWALK LINE, CLASS III, 12", 642 PAIN | 1,587 FT | $1.95 | $3.50 | $1.95 | $1.95 |
| 614E30200 WORK ZONE ARROW, CLASS I, 642 PAINT | 47 EACH | $50.00 | $70.00 | $50.00 | $50.00 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT | 47 EACH | $45.00 | $70.00 | $45.00 | $45.00 |
| 630E97800 SIGNING, MISC.:ADDITIONAL SIGNS, GROUND MOUNTED, A | 1,400 SF | $10.00 | $17.50 | $17.50 | $17.50 |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 12 SNMT | $675 | $675 | $675 | $675 |
| 614E20110 WORK ZONE LANE LINE, CLASS I, 6", 642 PAINT Section 7 - MAINTENANCE OF TRAFFIC - Totals Awd $185,687.69 2 $184,736.00 3 $197,437.69 4 $203,187.69 | 0.95 MILE | $900 | $1,250 | $900 | $900 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $10,000 | $1,000 | $7,500 | $6,594 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →