HAM-SR 126-06.86
HAM County · est $4.5M
Bid dateThursday, January 15—
Awarded toBARRETT PAVING MATERIALS INC$4.51M
HAM County · est $4.5M
Bid form · ODOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E10301 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 9,734 CY | $240 | $2.34M | 52% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.75" | 232,758 SY | $2.6 | $605k | 13% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $422,000 | $422k | 9% |
| 253E02000 PAVEMENT REPAIR | 500 CY | $520 | $260k | 6% |
| 442E00100 ANTI-SEGREGATION EQUIPMENT | 5,557 CY | $18 | $100k | 2% |
| 624E10000 MOBILIZATION Section 6 - INCIDENTALS - Totals Awd $545,682.90 2 $586,623.78 | 1 LS | $100,000 | $100k | 2% |
| 617E10100 COMPACTED AGGREGATE | 532 CY | $180 | $96k | 2% |
| 407E20000 NON-TRACKING TACK COAT | 21,026 GAL | $4 | $84k | 2% |
| 807E13010 WET REFLECTIVE SPRAY THERMOPLASTIC PAVEMENT MARKIN | 19.81 MILE | $2,900 | $57k | 1% |
| 889E10000 LONGITUDINAL DIAMOND GROOVING (ON S-CURVE, S.L.M. Section 3 - PAVEMENT - Totals Awd $3,497,554.30 2 $3,722,103.09 | 9,871 SY | $4.4 | $43k | 1% |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 43 more items below.
| Item | Quantity | R1Barrett Paving Materials INC | R2John R Jurgensen Company | % of bid |
|---|---|---|---|---|
| 442E10301 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 9,734 CY | $240 | $277 | 54% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.75" | 232,758 SY | $2.60 | $2.01 | 14% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $422,000 | $324,207 | 10% |
| 253E02000 PAVEMENT REPAIR | 500 CY | $520 | $565 | 6% |
| 442E00100 ANTI-SEGREGATION EQUIPMENT | 5,557 CY | $18.00 | $10.00 | 2% |
| 624E10000 MOBILIZATION Section 6 - INCIDENTALS - Totals Awd $545,682.90 2 $586,623.78 | 1 LS | $100,000 | $237,500 | 2% |
| 617E10100 COMPACTED AGGREGATE | 532 CY | $180 | $166 | 2% |
| 407E20000 NON-TRACKING TACK COAT | 21,026 GAL | $4.00 | $4.50 | 2% |
| 807E13010 WET REFLECTIVE SPRAY THERMOPLASTIC PAVEMENT MARKIN | 19.81 MILE | $2,900 | $2,900 | 1% |
| 889E10000 LONGITUDINAL DIAMOND GROOVING (ON S-CURVE, S.L.M. Section 3 - PAVEMENT - Totals Awd $3,497,554.30 2 $3,722,103.09 | 9,871 SY | $4.40 | $4.53 | 1% |
| 850E10010 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $1,370 | $1,370 | 1% |
| 621E00100 RPM | 823 EACH | $39.00 | $39.00 | 1% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 350 HOUR | $90.00 | $133 | 1% |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY Section 5 - MAINTENANCE OF TRAFFIC - Totals Awd $101,064.30 2 $116,075.80 | 24 SNMT | $1,195 | $1,195 | 1% |
| 253E01001 PAVEMENT REPAIR, AS PER PLAN | 126 SY | $200 | $25.00 | 1% |
| 618E40600 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 19.81 MILE | $1,150 | $700 | 1% |
| 608E52000 CURB RAMP | 345 SF | $55.00 | $21.00 | 0% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $16,183 | $15,446 | 0% |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 20.23 MILE | $665 | $665 | 0% |
| 807E13310 WET REFLECTIVE SPRAY THERMOPLASTIC PAVEMENT MARKIN | 7,601 FT | $1.65 | $1.65 | 0% |
| Item | Quantity | R1Barrett Paving Materials INC | R2John R Jurgensen Company |
|---|---|---|---|
| 202E30000 WALK REMOVED | 604 SF | $10.00 | $11.00 |
| 202E32000 CURB REMOVED | 50 FT | $20.00 | $25.00 |
| 202E38000 GUARDRAIL REMOVED | 288 FT | $4.00 | $4.00 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 1 EACH | $125 | $125 |
| 202E42050 ANCHOR ASSEMBLY REMOVED, TYPE B | 3 EACH | $150 | $150 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 2 EACH | $200 | $200 |
| 209E15000 RESHAPING UNDER GUARDRAIL | 4 STA | $125 | $125 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 325 FT | $29.00 | $29.00 |
| 606E26050 ANCHOR ASSEMBLY, MGS TYPE B | 2 EACH | $2,225 | $2,225 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 1 EACH | $2,375 | $2,375 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $1,150 | $1,150 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 2 EACH | $2,350 | $2,350 |
| 608E10000 4" CONCRETE WALK | 221 SF | $20.00 | $21.00 |
| 617E20000 SHOULDER PREPARATION | 9,576 SY | $1.00 | $2.24 |
| 617E25000 WATER Section 1 - ROADWAY - Totals Awd $160,509.00 2 $154,177.17 | 11 MGAL | $1.00 | $7.59 |
| 659E14000 REPAIR SEEDING AND MULCHING | 8 SY | $1.00 | $425 |
| 832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $1,008.00 2 $4,400.00 | 1,000 EACH | $1.00 | $1.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" | 856 SY | $2.60 | $8.92 |
| 254E01600 PATCHING PLANED SURFACE | 2,351 SY | $4.00 | $4.29 |
| 609E26000 CURB, TYPE 6 | 27 FT | $150 | $40.00 |
| 690E98400 SPECIAL - INTELLIGENT COMPACTION | 1 LS | $2,500 | $28,604 |
| 690E98400 SPECIAL - PAVER MOUNTED THERMAL PROFILING | 1 LS | $2,500 | $14,864 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 932 EACH | $8.00 | $12.05 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 6 EACH | $10.00 | $10.00 |
| 644E00500 STOP LINE | 100 FT | $7.35 | $7.35 |
| 644E00630 CROSSWALK LINE, 24" | 652 FT | $7.35 | $7.35 |
| 644E00720 CHEVRON MARKING | 1,253 FT | $7.35 | $7.35 |
| 644E01300 LANE ARROW | 18 EACH | $118 | $118 |
| 644E01360 WRONG WAY ARROW | 7 EACH | $175 | $175 |
| 644E40000 SPEED MEASUREMENT MARKING | 8 EACH | $300 | $673 |
| 645E00118 EDGE LINE, 6", TYPE A4 | 0.42 MILE | $24,000 | $24,000 |
| 645E00220 LANE LINE, 6", TYPE A4 | 0.24 MILE | $9,500 | $9,500 |
| 645E01522 DOTTED LINE, 6", TYPE A4 | 371 FT | $6.00 | $6.00 |
| 807E13110 WET REFLECTIVE SPRAY THERMOPLASTIC PAVEMENT MARKIN | 8.31 MILE | $1,450 | $1,450 |
| 807E13410 WET REFLECTIVE SPRAY THERMOPLASTIC PAVEMENT MARKIN | 6,531 FT | $1.00 | $1.00 |
| 850E10130 GROOVING FOR 12" RECESSED PAVEMENT MARKING | — | $0.40 | $0.40 |
| 850E20010 GROOVING FOR 6" RECESSED PAVEMENT MARKING Section 4 - TRAFFIC CONTROL - Totals Awd $208,709.50 2 $215,471.54 | — | $3,000 | $3,000 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 6 SNMT | $995 | $995 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 8.55 MILE | $450 | $450 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 7,601 FT | $0.85 | $0.85 |
| 614E24612 WORK ZONE DOTTED LINE, CLASS III, 6", 642 PAINT | 6,902 FT | $1.50 | $1.50 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 100 FT | $8.00 | $8.00 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $7,500 | $9,471 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →