BID #260015 · ODOTRESULT · awarded Jan 15

HAM-SR 126-06.86

HAM County · est $4.5M

Bid dateThursday, January 15
Awarded toBARRETT PAVING MATERIALS INC$4.51M
read → connected → answeredcassandri

Project scope

Bid form · ODOT

63ITEMS
  • Guardrail & Barrier17%
  • Pavement Marking17%
  • Maintaining Traffic16%
  • Curb, Walk & Ramp8%
  • Asphalt Paving6%
  • Erosion & Landscaping3%
  • Other32%

Top items by winning bid

ItemQtyUnit priceExtended%
442E10301 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A (9,734 CY$240$2.34M52%
254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.75"232,758 SY$2.6$605k13%
614E11000 MAINTAINING TRAFFIC1 LS$422,000$422k9%
253E02000 PAVEMENT REPAIR500 CY$520$260k6%
442E00100 ANTI-SEGREGATION EQUIPMENT5,557 CY$18$100k2%
624E10000 MOBILIZATION Section 6 - INCIDENTALS - Totals Awd $545,682.90 2 $586,623.781 LS$100,000$100k2%
617E10100 COMPACTED AGGREGATE532 CY$180$96k2%
407E20000 NON-TRACKING TACK COAT21,026 GAL$4$84k2%
807E13010 WET REFLECTIVE SPRAY THERMOPLASTIC PAVEMENT MARKIN19.81 MILE$2,900$57k1%
889E10000 LONGITUDINAL DIAMOND GROOVING (ON S-CURVE, S.L.M. Section 3 - PAVEMENT - Totals Awd $3,497,554.30 2 $3,722,103.099,871 SY$4.4$43k1%

Per-bidder unit pricing

ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 43 more items below.

Rank 1Barrett Paving Materials INC$4.51MRank 2John R Jurgensen Company$4.80M
ItemQuantityR1Barrett Paving Materials INCR2John R Jurgensen Company
442E10301 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A (9,734 CY$240$277
254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.75"232,758 SY$2.60$2.01
614E11000 MAINTAINING TRAFFIC1 LS$422,000$324,207
253E02000 PAVEMENT REPAIR500 CY$520$565
442E00100 ANTI-SEGREGATION EQUIPMENT5,557 CY$18.00$10.00
624E10000 MOBILIZATION Section 6 - INCIDENTALS - Totals Awd $545,682.90 2 $586,623.781 LS$100,000$237,500
617E10100 COMPACTED AGGREGATE532 CY$180$166
407E20000 NON-TRACKING TACK COAT21,026 GAL$4.00$4.50
807E13010 WET REFLECTIVE SPRAY THERMOPLASTIC PAVEMENT MARKIN19.81 MILE$2,900$2,900
889E10000 LONGITUDINAL DIAMOND GROOVING (ON S-CURVE, S.L.M. Section 3 - PAVEMENT - Totals Awd $3,497,554.30 2 $3,722,103.099,871 SY$4.40$4.53
850E10010 GROOVING FOR 6" RECESSED PAVEMENT MARKING$1,370$1,370
621E00100 RPM823 EACH$39.00$39.00
614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST350 HOUR$90.00$133
808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY Section 5 - MAINTENANCE OF TRAFFIC - Totals Awd $101,064.30 2 $116,075.8024 SNMT$1,195$1,195
253E01001 PAVEMENT REPAIR, AS PER PLAN126 SY$200$25.00
618E40600 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE)19.81 MILE$1,150$700
608E52000 CURB RAMP345 SF$55.00$21.00
103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM1 LS$16,183$15,446
614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT20.23 MILE$665$665
807E13310 WET REFLECTIVE SPRAY THERMOPLASTIC PAVEMENT MARKIN7,601 FT$1.65$1.65
Show all 63 line items
ItemQuantityR1Barrett Paving Materials INCR2John R Jurgensen Company
202E30000 WALK REMOVED604 SF$10.00$11.00
202E32000 CURB REMOVED50 FT$20.00$25.00
202E38000 GUARDRAIL REMOVED288 FT$4.00$4.00
202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T1 EACH$125$125
202E42050 ANCHOR ASSEMBLY REMOVED, TYPE B3 EACH$150$150
202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED2 EACH$200$200
209E15000 RESHAPING UNDER GUARDRAIL4 STA$125$125
606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS325 FT$29.00$29.00
606E26050 ANCHOR ASSEMBLY, MGS TYPE B2 EACH$2,225$2,225
606E26150 ANCHOR ASSEMBLY, MGS TYPE E1 EACH$2,375$2,375
606E26550 ANCHOR ASSEMBLY, MGS TYPE T1 EACH$1,150$1,150
606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 12 EACH$2,350$2,350
608E10000 4" CONCRETE WALK221 SF$20.00$21.00
617E20000 SHOULDER PREPARATION9,576 SY$1.00$2.24
617E25000 WATER Section 1 - ROADWAY - Totals Awd $160,509.00 2 $154,177.1711 MGAL$1.00$7.59
659E14000 REPAIR SEEDING AND MULCHING8 SY$1.00$425
832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $1,008.00 2 $4,400.001,000 EACH$1.00$1.00
254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5"856 SY$2.60$8.92
254E01600 PATCHING PLANED SURFACE2,351 SY$4.00$4.29
609E26000 CURB, TYPE 627 FT$150$40.00
690E98400 SPECIAL - INTELLIGENT COMPACTION1 LS$2,500$28,604
690E98400 SPECIAL - PAVER MOUNTED THERMAL PROFILING1 LS$2,500$14,864
621E54000 RAISED PAVEMENT MARKER REMOVED932 EACH$8.00$12.05
626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL6 EACH$10.00$10.00
644E00500 STOP LINE100 FT$7.35$7.35
644E00630 CROSSWALK LINE, 24"652 FT$7.35$7.35
644E00720 CHEVRON MARKING1,253 FT$7.35$7.35
644E01300 LANE ARROW18 EACH$118$118
644E01360 WRONG WAY ARROW7 EACH$175$175
644E40000 SPEED MEASUREMENT MARKING8 EACH$300$673
645E00118 EDGE LINE, 6", TYPE A40.42 MILE$24,000$24,000
645E00220 LANE LINE, 6", TYPE A40.24 MILE$9,500$9,500
645E01522 DOTTED LINE, 6", TYPE A4371 FT$6.00$6.00
807E13110 WET REFLECTIVE SPRAY THERMOPLASTIC PAVEMENT MARKIN8.31 MILE$1,450$1,450
807E13410 WET REFLECTIVE SPRAY THERMOPLASTIC PAVEMENT MARKIN6,531 FT$1.00$1.00
850E10130 GROOVING FOR 12" RECESSED PAVEMENT MARKING$0.40$0.40
850E20010 GROOVING FOR 6" RECESSED PAVEMENT MARKING Section 4 - TRAFFIC CONTROL - Totals Awd $208,709.50 2 $215,471.54$3,000$3,000
614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN6 SNMT$995$995
614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT8.55 MILE$450$450
614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P7,601 FT$0.85$0.85
614E24612 WORK ZONE DOTTED LINE, CLASS III, 6", 642 PAINT6,902 FT$1.50$1.50
614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT100 FT$8.00$8.00
623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P1 LS$7,500$9,471

Project details

Description
HAM-SR 126-06.86
Type of work
Pavement

How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →