LOG-PAVE-FY26
LOG County · est $5.0M
Bid dateThursday, January 15—
LOG County · est $5.0M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 7 more items below.
| Item | Quantity | R1Shelly Company | % of bid |
|---|---|---|---|
| 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 15,244 CY | $230 | 65% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1 1/2" Depth | 363,034 SY | $1.75 | 12% |
| 251E01041 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 3,850 SY | $75.00 | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $200,000 | 4% |
| 617E10100 COMPACTED AGGREGATE | 1,441 CY | $100 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | 2% |
| 407E20000 NON-TRACKING TACK COAT | 30,863 GAL | $3.00 | 2% |
| 621E00100 RPM | 2,258 EACH | $36.00 | 2% |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 44.24 MILE | $1,200 | 1% |
| 642E00104 EDGE LINE, 6", TYPE 1 | 44.32 MILE | $1,000 | 1% |
| 301E56001 ASPHALT CONCRETE BASE, (449), AS PER PLAN, PG64-22 | 69 CY | $500 | 1% |
| 874E21000 LONGITUDINAL JOINT PREPARATION | 6.53 MILE | $5,000 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $30,000 | 1% |
| 642E00300 CENTER LINE, TYPE 1 | 22.12 MILE | $1,200 | 0% |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 3,958 EACH | $6.00 | 0% |
| 209E72050 PREPARING SUBGRADE FOR SHOULDER PAVING | 44.24 MILE | $450 | 0% |
| 614E12460 WORK ZONE MARKING SIGN | 143 EACH | $100 | 0% |
| 618E43000 RUMBLE STRIPES, CENTER LINE (ASPHALT CONCRETE) | 6.53 MILE | $2,015 | 0% |
| 618E41000 RUMBLE STRIPES, EDGE LINE (ASPHALT CONCRETE) | 8.56 MILE | $1,115 | 0% |
| 690E50350 SPECIAL - MAILBOX REMOVED AND RESET | 13 EACH | $400 | 0% |
| Item | Quantity | R1Shelly Company |
|---|---|---|
| 254E01601 PATCHING PLANED SURFACE, AS PER PLAN | 300 SY | $15.00 |
| 644E00500 STOP LINE | 273 FT | $10.00 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 546 FT | $3.00 |
| 516E31001 JOINT SEALER, AS PER PLAN | 91 FT | $32.25 |
| 516E31001 JOINT SEALER, AS PER PLAN | 74 FT | $32.25 |
| 516E31001 JOINT SEALER, AS PER PLAN | 68 FT | $32.25 |
| 516E31001 JOINT SEALER, AS PER PLAN | 67 FT | $32.25 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 15,244 CY | $230 | $3.51M | 65% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1 1/2" Depth | 363,034 SY | $1.75 | $635k | 12% |
| 251E01041 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 3,850 SY | $75 | $289k | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $200,000 | $200k | 4% |
| 617E10100 COMPACTED AGGREGATE | 1,441 CY | $100 | $144k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 2% |
| 407E20000 NON-TRACKING TACK COAT | 30,863 GAL | $3 | $93k | 2% |
| 621E00100 RPM | 2,258 EACH | $36 | $81k | 2% |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 44.24 MILE | $1,200 | $53k | 1% |
| 642E00104 EDGE LINE, 6", TYPE 1 | 44.32 MILE | $1,000 | $44k | 1% |