Skip to content
Figure 0.1 · BRIEFING
BID #260024 · ODOTRESULT · awarded Jan 15

PAU-SR 49/SR 500/SR 613-Varies

PAU County · est $1.7M

Bid dateThursday, January 15
Awarded toSHELLY COMPANY$1.60M
read → connected → answeredcassandri

Project scope

Bid form · ODOT

36ITEMS
  • Pavement Marking28%
  • Maintaining Traffic14%
  • Erosion & Landscaping11%
  • Curb, Walk & Ramp8%
  • Mobilization & General8%
  • Removal & Demolition6%
  • Other25%

Top items by winning bid

ItemQtyUnit priceExtended%
441E10000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG4,326 CY$205$887k55%
254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T=1 1/4" / 1 1113,710 SY$1.45$165k10%
253E02000 PAVEMENT REPAIR200 CY$390$78k5%
614E11000 MAINTAINING TRAFFIC1 LS$75,000$75k5%
441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG196 CY$350$69k4%
617E10101 COMPACTED AGGREGATE, AS PER PLAN Section 3 - PAVEMENT - Totals Awd $1,315,966.50 2 $1,680,368.50889 CY$68$60k4%
202E23500 WEARING COURSE REMOVED6,604 SY$6$40k2%
624E10000 MOBILIZATION Section 6 - INCIDENTALS - Totals Awd $120,000.00 2 $256,000.001 LS$35,000$35k2%
608E52000 CURB RAMP Section 1 - ROADWAY - Totals Awd $73,472.50 2 $71,821.50583 SF$50$29k2%
407E20000 NON-TRACKING TACK COAT10,228 GAL$2.5$26k2%

Per-bidder unit pricing

ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 16 more items below.

Rank 1Shelly Company$1.60MRank 2Gerken Paving INC$2.10M
ItemQuantityR1Shelly CompanyR2Gerken Paving INC
441E10000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG4,326 CY$205$254
254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T=1 1/4" / 1 1113,710 SY$1.45$1.75
253E02000 PAVEMENT REPAIR200 CY$390$560
614E11000 MAINTAINING TRAFFIC1 LS$75,000$95,000
441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG196 CY$350$520
617E10101 COMPACTED AGGREGATE, AS PER PLAN Section 3 - PAVEMENT - Totals Awd $1,315,966.50 2 $1,680,368.50889 CY$68.00$108
202E23500 WEARING COURSE REMOVED6,604 SY$6.00$5.75
624E10000 MOBILIZATION Section 6 - INCIDENTALS - Totals Awd $120,000.00 2 $256,000.001 LS$35,000$145,000
608E52000 CURB RAMP Section 1 - ROADWAY - Totals Awd $73,472.50 2 $71,821.50583 SF$50.00$50.00
407E20000 NON-TRACKING TACK COAT10,228 GAL$2.50$2.50
304E20000 AGGREGATE BASE135 CY$150$180
621E00100 RPM442 EACH$40.20$40.20
254E01600 PATCHING PLANED SURFACE2,277 SY$5.00$10.00
642E00104 EDGE LINE, 6", TYPE 113.28 MILE$850$850
614E21400 WORK ZONE CENTER LINE, CLASS II19.36 MILE$500$350
614E21000 WORK ZONE CENTER LINE, CLASS I9.68 MILE$850$850
618E43000 RUMBLE STRIPES, CENTER LINE (ASPHALT CONCRETE)4.81 MILE$1,450$1,450
900E00100 RAILROAD FLAGGING SERVICES (SEE PROPOSAL) Section 5 - MAINTENANCE OF TRAFFIC - Totals Awd $29,078.00 2 $27,734.006,750 EACH$1.00$1.00
642E00300 CENTER LINE, TYPE 17.55 MILE$850$850
644E00630 CROSSWALK LINE, 24"734 FT$7.00$7.00
Show all 36 line items
ItemQuantityR1Shelly CompanyR2Gerken Paving INC
202E30000 WALK REMOVED583 SF$7.00$7.00
202E32000 CURB REMOVED47.5 FT$13.00$13.00
659E00300 TOPSOIL18 CY$80.00$80.00
659E10000 SEEDING AND MULCHING160 SY$4.00$4.00
659E20000 COMMERCIAL FERTILIZER0.1 TON$1,500$1,500
659E35000 WATER1.5 MGAL$50.00$50.00
832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $3,305.00 2 $3,305.001,000 EACH$1.00$1.00
621E54000 RAISED PAVEMENT MARKER REMOVED442 EACH$5.00$6.00
644E00500 STOP LINE154 FT$7.00$7.00
644E00620 CROSSWALK LINE, 12"922 FT$4.00$4.00
644E01000 RAILROAD SYMBOL MARKING3 EACH$500$500
644E01200 PARKING LOT STALL MARKING714 FT$1.00$1.00
644E01600 HANDICAP SYMBOL MARKING Section 4 - TRAFFIC CONTROL - Totals Awd $57,026.40 2 $57,468.402 EACH$125$125
614E12460 WORK ZONE MARKING SIGN52 EACH$85.00$115
100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY1 LS$5,000$5,000
103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM1 LS$5,000$11,000

Project details

Description
PAU-SR 49/SR 500/SR 613-Varies
Type of work
Pavement

How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →