POR-SR 82/VAR-10.64/VAR
POR County · est $4.6M
Bid dateThursday, January 15—
Awarded toRONYAK PAVING INC$4.05M
POR County · est $4.6M
Bid form · ODOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 4,057 CY | $200 | $811k | 20% |
| 424E14000 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B | 448 (3650 CY | $210 | $767k | 19% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (2592 CY | $160 | $415k | 10% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $196,725 | $197k | 5% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) (LONGITUDINAL) | 4,747 SY | $40 | $190k | 5% |
| 608E52000 CURB RAMP | 4,158 SF | $45 | $187k | 5% |
| 624E10000 MOBILIZATION Section 12 - INCIDENTALS - Totals Awd $391,791.88 2 $440,816.56 3 $451,961.29 4 $719,500.00 5 $352,569.53 | 1 LS | $148,860 | $149k | 4% |
| 253E01000 PAVEMENT REPAIR | 900 SY | $125 | $113k | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T=3.25") | 46,640 SY | $1.85 | $86k | 2% |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A (T=1") | 82,979 SY | $1 | $83k | 2% |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 95 more items below.
| Item | Quantity | R1Ronyak Paving INC | R2Karvo Companies INC | R3Kokosing Construction Company INC | R4Shelly Company | R5Shelly & Sands INC | % of bid |
|---|---|---|---|---|---|---|---|
| 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 4,057 CY | $200 | $215 | $225 | $185 | $222 | 23% |
| 424E14000 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B | 448 (3650 CY | $210 | $238 | $240 | $210 | $230 | 22% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (2592 CY | $160 | $155 | $175 | $140 | $155 | 12% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $196,725 | $208,355 | $201,361 | $571,500 | $212,570 | 6% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) (LONGITUDINAL) | 4,747 SY | $40.00 | $35.00 | $50.00 | $45.00 | $36.00 | 5% |
| 608E52000 CURB RAMP | 4,158 SF | $45.00 | $15.00 | $19.00 | $26.55 | $22.50 | 5% |
| 624E10000 MOBILIZATION Section 12 - INCIDENTALS - Totals Awd $391,791.88 2 $440,816.56 3 $451,961.29 4 $719,500.00 5 $352,569.53 | 1 LS | $148,860 | $184,462 | $215,000 | $100,000 | $100,000 | 4% |
| 253E01000 PAVEMENT REPAIR | 900 SY | $125 | $90.00 | $130 | $120 | $95.00 | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T=3.25") | 46,640 SY | $1.85 | $2.00 | $1.10 | $1.85 | $4.00 | 2% |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A (T=1") | 82,979 SY | $1.00 | $1.00 | $1.10 | $1.05 | $1.85 | 2% |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 21,150 LB | $3.00 | $2.50 | $1.00 | $3.50 | $4.00 | 2% |
| 646E10010 EDGE LINE, 6" | 22.15 MILE | $2,799 | $2,799 | $2,799 | $2,799 | $2,750 | 2% |
| 617E10100 COMPACTED AGGREGATE | 717 CY | $85.00 | $100 | $125 | $120 | $90.00 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T=1.5") | 52,425 SY | $1.00 | $1.00 | $1.10 | $1.25 | $2.00 | 2% |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 37 EACH | $1,395 | $1,300 | $1,650 | $1,400 | $1,800 | 1% |
| 646E10200 CENTER LINE | 13.45 MILE | $3,475 | $3,475 | $3,475 | $3,475 | $3,650 | 1% |
| 407E20000 NON-TRACKING TACK COAT | 23,129 GAL | $2.00 | $2.30 | $2.50 | $2.75 | $3.05 | 1% |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A (T=1.2 Section 4 - PAVEMENT - Totals Awd $2,774,472.10 2 $2,915,206.70 3 $3,146,201.50 4 $2,802,254.70 5 $3,210,125.90 | 38,726 SY | $1.10 | $1.00 | $1.10 | $1.50 | $2.30 | 1% |
| 515E10051 PRESTRESSED CONCRETE NON-COMPOSITE BOX BEAM BRIDGE | 1 EACH | $36,203 | $36,205 | $36,203 | $36,203 | $52,500 | 1% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) (TRANSVERSE) | 350 SY | $95.00 | $70.00 | $200 | $90.00 | $175 | 1% |
| Item | Quantity | R1Ronyak Paving INC | R2Karvo Companies INC | R3Kokosing Construction Company INC | R4Shelly Company | R5Shelly & Sands INC |
|---|---|---|---|---|---|---|
| 202E23500 WEARING COURSE REMOVED | 5,096 SY | $5.00 | $8.00 | $7.00 | $9.25 | $20.00 |
| 202E30000 WALK REMOVED | 4,232 SF | $4.00 | $10.00 | $4.25 | $10.00 | $3.75 |
| 202E32000 CURB REMOVED | 380 FT | $15.00 | $25.00 | $16.00 | $15.00 | $10.00 |
| 202E32500 CURB AND GUTTER REMOVED | 107 FT | $15.00 | $25.00 | $16.00 | $30.00 | $20.00 |
| 202E98100 REMOVAL MISC.: BARRIER REFLECTOR | 16 EACH | $5.00 | $5.00 | $5.00 | $20.00 | $5.00 |
| 203E10000 EXCAVATION (FOR PAVEMENT REPAIR) | 150 CY | $15.00 | $15.00 | $35.00 | $30.00 | $32.00 |
| 209E60200 LINEAR GRADING | 810 STA | $2.00 | $35.00 | $45.00 | $80.00 | $40.00 |
| 209E72000 PREPARING SUBGRADE FOR SHOULDER PAVING (SAFETY EDG | 336 STA | $4.00 | $25.00 | $7.00 | $75.00 | $50.00 |
| 608E10000 4" CONCRETE WALK | 144 SF | $35.00 | $12.00 | $19.00 | $12.30 | $15.00 |
| 623E39501 MONUMENT ASSEMBLY ADJUSTED TO GRADE, AS PER PLAN | 10 EACH | $1,485 | $1,400 | $685 | $1,000 | $1,400 |
| 690E91000 SPECIAL - AS-BUILT CONSTRUCTION PLANS Section 1 - ROADWAY - Totals Awd $264,507.00 2 $213,441.00 3 $195,170.00 4 $325,354.10 5 $289,525.00 | 1 LS | $2,500 | $1,000 | $1,000 | $10,000 | $2,000 |
| 832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $3,000.00 2 $3,000.00 3 $3,000.00 4 $3,000.00 5 $3,000.00 | 3,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE | 7 EACH | $1,800 | $1,775 | $2,250 | $1,700 | $2,000 |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 18 EACH | $1,200 | $1,500 | $1,150 | $1,600 | $1,500 |
| 611E99660 MANHOLE RECONSTRUCTED TO GRADE | 3 EACH | $1,625 | $2,000 | $1,850 | $1,700 | $2,000 |
| 638E10801 VALVE BOX ADJUSTED TO GRADE, AS PER PLAN Section 3 - DRAINAGE - Totals Awd $167,140.00 2 $162,000.00 3 $132,650.00 4 $182,025.00 5 $213,800.00 | 13 EACH | $1,000 | $1,200 | $650 | $800 | $1,200 |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 5,400 FT | $1.00 | $1.50 | $2.00 | $2.00 | $2.00 |
| 304E20000 AGGREGATE BASE (FOR PAVEMENT REPAIR) | 150 CY | $30.00 | $25.00 | $60.00 | $70.00 | $50.00 |
| 408E10001 PRIME COAT, AS PER PLAN @ 0.40 GAL/SY | 10,153 GAL | $2.50 | $5.00 | $4.00 | $5.00 | $3.50 |
| 411E10000 STABILIZED CRUSHED AGGREGATE BASE | 3 CY | $200 | $275 | $200 | $1,300 | $90.00 |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 65 FT | $90.00 | $75.00 | $50.00 | $65.55 | $60.00 |
| 609E26000 CURB, TYPE 6 | 240 FT | $65.00 | $55.00 | $50.00 | $41.30 | $40.00 |
| 618E40600 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 5 MILE | $1,050 | $1,550 | $1,140 | $1,050 | $1,550 |
| 618E43000 RUMBLE STRIPES, CENTER LINE (ASPHALT CONCRETE) | 3 MILE | $1,050 | $1,050 | $1,140 | $1,050 | $1,050 |
| 874E21000 LONGITUDINAL JOINT PREPARATION | 3 MILE | $3,000 | $5,375 | $1,250 | $8,000 | $1,000 |
| 621E00100 RPM | 549 EACH | $39.00 | $39.00 | $37.50 | $39.00 | $41.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 442 EACH | $5.00 | $1.00 | $2.00 | $4.00 | $5.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, (BI-DIRECTIONAL) | 65 EACH | $14.00 | $13.00 | $14.00 | $27.50 | $14.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 6 EACH | $10.00 | $25.00 | $10.00 | $25.00 | $12.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $15.00 | $25.00 | $15.00 | $25.00 | $18.00 |
| 630E97700 SIGNING, MISC.:SOLAR POWERED RECTANGULAR RAPID FLA | 2 EACH | $9,500 | $9,500 | $9,500 | $9,500 | $9,500 |
| 646E10300 CHANNELIZING LINE, 8" | 315 FT | $1.78 | $1.78 | $1.78 | $1.80 | $1.50 |
| 646E10400 STOP LINE | 226 FT | $11.50 | $11.50 | $11.50 | $11.50 | $10.00 |
| 646E10520 CROSSWALK LINE, 24", HIGH VISIBILITY | 1,100 FT | $10.50 | $10.50 | $10.50 | $10.50 | $10.00 |
| 646E10800 ISLAND MARKING | 96 SF | $7.25 | $7.25 | $7.25 | $7.25 | $5.00 |
| 646E10900 HANDICAP SYMBOL MARKING | 1 EACH | $295 | $295 | $295 | $295 | $275 |
| 646E20110 SCHOOL SYMBOL MARKING, 96" | 2 EACH | $645 | $645 | $645 | $645 | $500 |
| 646E20200 PARKING LOT STALL MARKING | 1,678 FT | $3.35 | $3.35 | $3.35 | $3.35 | $2.50 |
| 646E20300 LANE ARROW | 19 EACH | $165 | $165 | $165 | $165 | $185 |
| 646E20600 BIKE LANE SYMBOL MARKING Section 5 - TRAFFIC CONTROL - Totals Awd $183,029.60 2 $181,306.60 3 $180,880.10 4 $183,581.40 5 $183,564.50 | 25 EACH | $197 | $197 | $197 | $197 | $225 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 100 HOUR | $125 | $125 | $120 | $100 | $95.00 |
| 614E12420 DETOUR SIGNING | 1 LS | $7,700 | $4,500 | $4,500 | $4,500 | $4,500 |
| 614E12460 WORK ZONE MARKING SIGN, (ALL PHASES) | 9 EACH | $65.00 | $80.00 | $100 | $80.00 | $80.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 2 SNMT | $250 | $900 | $900 | $900 | $900 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 17.07 MILE | $977 | $977 | $977 | $900 | $1,250 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 13.45 MILE | $877 | $877 | $877 | $900 | $1,250 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 21.96 MILE | $585 | $585 | $400 | $500 | $450 |
| 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, 8" | 325 FT | $0.76 | $0.76 | $0.76 | $1.00 | $1.00 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 325 FT | $0.72 | $0.72 | $0.72 | $1.00 | $1.00 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 263 FT | $3.25 | $3.25 | $3.25 | $3.00 | $3.00 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT Section 6 - MAINTENANCE OF TRAFFIC - Totals Awd $64,681.29 2 $62,916.29 3 $58,533.69 4 $57,624.00 5 $66,708.00 | 239 FT | $3.10 | $3.10 | $3.10 | $3.00 | $3.00 |
| 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 1 LS | $17,385 | $17,385 | $17,385 | $17,385 | $10,000 |
| 202E23500 WEARING COURSE REMOVED | 249 SY | $35.00 | $18.00 | $30.00 | $16.25 | $25.00 |
| 202E23501 WEARING COURSE REMOVED, AS PER PLAN | 161 SY | $35.00 | $15.00 | $30.00 | $45.00 | $25.00 |
| 202E38000 GUARDRAIL REMOVED | 288 FT | $3.00 | $5.00 | $3.00 | $5.00 | $3.00 |
| 407E13900 TACK COAT, 702.13 | 9 GAL | $20.00 | $2.30 | $2.50 | $30.00 | $3.50 |
| 407E20000 NON-TRACKING TACK COAT | 58 GAL | $20.00 | $2.30 | $2.50 | $2.75 | $3.05 |
| 409E30000 SAWING AND SEALING ASPHALT CONCRETE PAVEMENT JOINT | 57 FT | $28.62 | $29.00 | $28.62 | $28.65 | $30.00 |
| 441E70100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 27 CY | $650 | $450 | $550 | $350 | $450 |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 123 LB | $8.72 | $9.00 | $8.72 | $8.75 | $5.00 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 20 EACH | $29.88 | $30.00 | $29.88 | $29.90 | $25.00 |
| 511E45710 CLASS QC1 CONCRETE, ABUTMENT | 1 CY | $4,127 | $4,127 | $4,127 | $4,127 | $4,000 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 17 SY | $47.97 | $48.00 | $47.97 | $48.00 | $50.00 |
| 512E33010 TYPE 3 WATERPROOFING | 174 SY | $57.45 | $58.00 | $57.45 | $57.45 | $50.00 |
| 515E30000 HIGH EARLY STRENGTH KEYWAY GROUT | 113 FT | $21.08 | $22.00 | $21.08 | $21.10 | $100 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 19 SF | $9.61 | $10.00 | $9.61 | $9.60 | $10.00 |
| 516E31010 2" DEEP JOINT SEALER | 57 FT | $28.62 | $29.00 | $28.62 | $28.60 | $30.00 |
| 516E43100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES ONLY ( | 4 EACH | $245 | $246 | $245 | $245 | $350 |
| 517E70100 RAILING (THREE STEEL TUBE BRIDGE RAILING) | 63 FT | $460 | $420 | $460 | $425 | $460 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 118 FT | $19.54 | $20.00 | $19.54 | $19.55 | $10.00 |
| 606E15050 GUARDRAIL, TYPE MGS | 137.5 FT | $24.40 | $25.00 | $24.40 | $25.00 | $24.40 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 2 EACH | $2,685 | $3,125 | $2,685 | $2,700 | $2,685 |
| 606E34600 MGS BRIDGE TERMINAL ASSEMBLY, TYPE TST-2 | 2 EACH | $2,575 | $2,875 | $2,575 | $2,700 | $2,575 |
| 621E00100 RPM | 2 EACH | $99.00 | $99.00 | $97.50 | $99.00 | $41.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 2 EACH | $5.00 | $1.00 | $2.00 | $10.00 | $5.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (Bl-DIRECTIONAL) | 5 EACH | $13.20 | $13.00 | $13.20 | $13.00 | $13.20 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 21 FT | $35.00 | $35.00 | $35.00 | $25.00 | $35.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 1 EACH | $15.00 | $25.00 | $15.00 | $25.00 | $25.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 3 EACH | $65.00 | $100 | $65.00 | $85.00 | $100 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 3 EACH | $20.00 | $25.00 | $20.00 | $25.00 | $25.00 |
| 646E10010 EDGE LINE, 6" | 0.04 MILE | $10,000 | $10,000 | $10,000 | $10,000 | $35,000 |
| 646E10200 CENTER LINE Section 7 - STRUCTURE REPAIR (POR-700-03359) - Totals Awd $158,349.08 2 $144,396.60 3 $152,417.58 4 $144,905.75 5 $165,075.40 | 0.02 MILE | $20,000 | $20,000 | $20,000 | $20,000 | $70,000 |
| 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE | 752 SY | $12.67 | $12.75 | $12.67 | $12.70 | $16.00 |
| 512E74500 REMOVAL OF EXISTING PAVEMENT MARKING Section 8 - STRUCTURE REPAIR (POR-82-10640) - Totals Awd $10,063.34 2 $10,113.00 3 $10,063.34 4 $10,075.40 5 $14,657.00 | 525 FT | $1.02 | $1.00 | $1.02 | $1.00 | $5.00 |
| 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE | 560 SY | $12.67 | $12.75 | $12.67 | $12.70 | $16.00 |
| 512E74500 REMOVAL OF EXISTING PAVEMENT MARKING Section 9 - STRUCTURE REPAIR (POR-82-15190) - Totals Awd $7,523.60 2 $7,560.00 3 $7,523.60 4 $7,532.00 5 $11,060.00 | 420 FT | $1.02 | $1.00 | $1.02 | $1.00 | $5.00 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 294 SY | $12.67 | $36.00 | $35.82 | $35.85 | $30.00 |
| 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE | 878 SY | $12.67 | $12.75 | $12.67 | $12.70 | $16.00 |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 294 SY | $21.08 | $22.00 | $21.08 | $21.10 | $20.00 |
| 512E74500 REMOVAL OF EXISTING PAVEMENT MARKING Section 10 - STRUCTURE REPAIR (POR-82-16802) - Totals Awd $21,422.12 2 $28,614.50 3 $28,228.22 4 $28,261.90 5 $30,588.00 | 368 FT | $1.02 | $1.00 | $1.02 | $1.00 | $5.00 |
| 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE | 401 SY | $12.67 | $12.75 | $12.67 | $12.70 | $17.00 |
| 512E74500 REMOVAL OF EXISTING PAVEMENT MARKING Section 11 - STRUCTURE REPAIR (POR-88-11956) - Totals Awd $5,606.99 2 $5,628.75 3 $5,606.99 4 $5,608.70 5 $9,397.00 | 516 FT | $1.02 | $1.00 | $1.02 | $1.00 | $5.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $25,107 | $25,000 | $18,000 | $20,000 | $12,000 |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $1,500 | $3,000 | $2,100 | $3,000 | $3,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $12,100 | $5,000 | $5,000 | $10,000 | $10,000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →