CHP-SR 55-15.02
CHP County · est $0.5M
Bid dateThursday, January 29—
Awarded toA & B ASPHALT CORPORATION$461,961.27
CHP County · est $0.5M
Bid form · ODOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 1,143 CY | $225.06 | $257k | 56% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1 1/2" DEPTH | 27,433 SY | $2.05 | $56k | 12% |
| 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN | 500 SY | $63.15 | $32k | 7% |
| 624E10000 MOBILIZATION Section 8 - INCIDENTALS - Totals Awd $47,597.90 2 $27,968.56 3 $46,000.00 | 1 LS | $24,062 | $24k | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $22,136 | $22k | 5% |
| 644E00300 CENTER LINE | 1.62 MILE | $5,825 | $9k | 2% |
| 617E10100 COMPACTED AGGREGATE, 1" AVERAGE THICKNESS Section 3 - PAVEMENT - Totals Awd $362,952.23 2 $392,133.30 3 $384,355.50 | 94 CY | $100 | $9k | 2% |
| 644E00100 EDGE LINE, 4" | 2.5 MILE | $3,150 | $8k | 2% |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 3.24 MILE | $2,186 | $7k | 2% |
| 407E20000 NON-TRACKING TACK COAT, 0.085 GAL/SY | 2,332 GAL | $3 | $7k | 2% |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 14 more items below.
| Item | Quantity | R1A & B Asphalt Corporation | R2Barrett Paving Materials INC | R3Shelly Company | % of bid |
|---|---|---|---|---|---|
| 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 1,143 CY | $225 | $240 | $230 | 56% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1 1/2" DEPTH | 27,433 SY | $2.05 | $2.10 | $1.50 | 12% |
| 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN | 500 SY | $63.15 | $78.00 | $115 | 7% |
| 624E10000 MOBILIZATION Section 8 - INCIDENTALS - Totals Awd $47,597.90 2 $27,968.56 3 $46,000.00 | 1 LS | $24,062 | $10,000 | $17,500 | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $22,136 | $16,000 | $25,000 | 5% |
| 644E00300 CENTER LINE | 1.62 MILE | $5,825 | $5,825 | $3,985 | 2% |
| 617E10100 COMPACTED AGGREGATE, 1" AVERAGE THICKNESS Section 3 - PAVEMENT - Totals Awd $362,952.23 2 $392,133.30 3 $384,355.50 | 94 CY | $100 | $160 | $130 | 2% |
| 644E00100 EDGE LINE, 4" | 2.5 MILE | $3,150 | $3,150 | $3,200 | 2% |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 3.24 MILE | $2,186 | $2,186 | $980 | 2% |
| 407E20000 NON-TRACKING TACK COAT, 0.085 GAL/SY | 2,332 GAL | $3.00 | $2.00 | $3.00 | 2% |
| 621E00100 RPM | 50 EACH | $94.40 | $94.40 | $115 | 1% |
| 614E22100 WORK ZONE EDGE LINE, CLASS I, 4", 642 PAINT | 5 MILE | $900 | $900 | $660 | 1% |
| 623E39500 MONUMENT ASSEMBLY ADJUSTED TO GRADE Section 1 - ROADWAY - Totals Awd $3,000.00 2 $2,400.00 3 $2,475.00 | 3 EACH | $1,000 | $800 | $825 | 1% |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 2 EACH | $1,200 | $1,455 | $1,455 | 1% |
| 611E99654 MANHOLE ADJUSTED TO GRADE Section 2 - DRAINAGE - Totals Awd $2,000.00 2 $3,400.00 3 $2,600.00 | 2 EACH | $1,000 | $1,700 | $1,300 | 0% |
| 644E00104 EDGE LINE, 6" | 0.4 MILE | $3,922 | $3,922 | $3,500 | 0% |
| 254E01601 PATCHING PLANED SURFACE, AS PER PLAN | 300 SY | $5.00 | $5.00 | $12.00 | 0% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 20 HOUR | $75.00 | $80.00 | $90.00 | 0% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $1,400 | $1,969 | $3,500 | 0% |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 50 EACH | $18.46 | $15.00 | $4.00 | 0% |
| Item | Quantity | R1A & B Asphalt Corporation | R2Barrett Paving Materials INC | R3Shelly Company |
|---|---|---|---|---|
| 638E10800 VALVE BOX ADJUSTED TO GRADE Section 4 - WATER WORK - Totals Awd $400.00 2 $2,000.00 3 $3,300.00 | 4 EACH | $100 | $500 | $825 |
| 644E00400 CHANNELIZING LINE, 8" | 192 FT | $2.50 | $2.50 | $2.00 |
| 644E00500 STOP LINE | 52 FT | $10.00 | $10.00 | $7.00 |
| 644E00620 CROSSWALK LINE, 12" | 64 FT | $5.00 | $5.00 | $4.00 |
| 644E00630 CROSSWALK LINE, 24" | 60 FT | $10.00 | $10.00 | $7.00 |
| 644E01300 LANE ARROW, LEFT | 2 EACH | $250 | $250 | $125 |
| 644E01300 LANE ARROW, RIGHT | 2 EACH | $250 | $250 | $125 |
| 644E20800 YIELD LINE Section 5 - TRAFFIC CONTROL - Totals Awd $28,193.30 2 $28,020.30 3 $23,804.70 | 15 FT | $50.00 | $50.00 | $5.00 |
| 632E27201 LOOP DETECTOR TIE IN, AS PER PLAN Section 6 - TRAFFIC SIGNALS - Totals Awd $2,700.00 2 $3,260.00 3 $3,260.00 | 2 EACH | $150 | $175 | $175 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 0.8 MILE | $1,114 | $1,114 | $700 |
| 614E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 642 PAIN | 384 FT | $1.00 | $1.00 | $0.55 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 104 FT | $5.00 | $5.00 | $4.00 |
| 614E30200 WORK ZONE ARROW, CLASS I, 642 PAINT, LEFT | 4 EACH | $30.00 | $30.00 | $50.00 |
| 614E30200 WORK ZONE ARROW, CLASS I, 642 PAINT, RIGHT Section 7 - MAINTENANCE OF TRAFFIC - Totals Awd $15,117.84 2 $15,217.84 3 $9,862.40 | 4 EACH | $30.00 | $30.00 | $50.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →