D03-PM FY2026
D03 County · est $4.9M
Bid dateThursday, January 29—
Awarded toAlpha Space Control LLC$3.89M
D03 County · est $4.9M
Bid form · ODOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 642E00104 EDGE LINE, 6", TYPE 1 | 2,662.08 MILE | $587.25 | $1.56M | 40% |
| 642E00300 CENTER LINE, TYPE 1 | 1,119.13 MILE | $428.15 | $479k | 12% |
| 807E10010 WET REFLECTIVE TRAFFIC PAINT, EDGE LINE, 6" | 136.76 MILE | $2,615 | $358k | 9% |
| 643E00500 STOP LINE | 68,457 FT | $2.65 | $181k | 5% |
| 643E00104 EDGE LINE, 6" | 298.88 MILE | $589.35 | $176k | 5% |
| 642E00204 LANE LINE, 6", TYPE 1 | 459.4 MILE | $327.65 | $151k | 4% |
| 807E10110 WET REFLECTIVE TRAFFIC PAINT, LANE LINE, 6" | 81.11 MILE | $1,485 | $120k | 3% |
| 643E01300 LANE ARROW | 2,194 EACH | $52.5 | $115k | 3% |
| 624E15001 MOBILIZATION, AS PER PLAN Section 4 - INCIDENTALS - Totals Awd $194,751.00 2 $85,597.71 3 $76,001.00 | 20 EACH | $5,000 | $100k | 3% |
| 643E00700 TRANSVERSE/DIAGONAL LINE | 42,123 FT | $2.2 | $93k | 2% |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 19 more items below.
| Item | Quantity | R1Alpha Space Control LLC | R2The Aero-mark Company LLC | R3Oglesby Construction INC | % of bid |
|---|---|---|---|---|---|
| 642E00104 EDGE LINE, 6", TYPE 1 | 2,662.08 MILE | $587 | $607 | $630 | 41% |
| 642E00300 CENTER LINE, TYPE 1 | 1,119.13 MILE | $428 | $518 | $635 | 13% |
| 807E10010 WET REFLECTIVE TRAFFIC PAINT, EDGE LINE, 6" | 136.76 MILE | $2,615 | $1,685 | $2,550 | 9% |
| 643E00500 STOP LINE | 68,457 FT | $2.65 | $4.00 | $4.00 | 5% |
| 643E00104 EDGE LINE, 6" | 298.88 MILE | $589 | $1,349 | $1,245 | 5% |
| 642E00204 LANE LINE, 6", TYPE 1 | 459.4 MILE | $328 | $300 | $280 | 4% |
| 807E10110 WET REFLECTIVE TRAFFIC PAINT, LANE LINE, 6" | 81.11 MILE | $1,485 | $679 | $800 | 3% |
| 643E01300 LANE ARROW | 2,194 EACH | $52.50 | $50.00 | $55.00 | 3% |
| 624E15001 MOBILIZATION, AS PER PLAN Section 4 - INCIDENTALS - Totals Awd $194,751.00 2 $85,597.71 3 $76,001.00 | 20 EACH | $5,000 | $1,000 | $500 | 3% |
| 643E00700 TRANSVERSE/DIAGONAL LINE | 42,123 FT | $2.20 | $2.75 | $2.50 | 2% |
| 643E00404 CHANNELIZING LINE, 12" | 149,751 FT | $0.50 | $0.53 | $0.60 | 2% |
| 643E00300 CENTER LINE | 140.96 MILE | $426 | $1,150 | $1,250 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $58,500 | $17,697 | $23,000 | 2% |
| 643E01350 TWO WAY LEFT TURN ARROW | 588 EACH | $95.00 | $75.00 | $100 | 1% |
| 643E01000 RAILROAD SYMBOL MARKING | 145 EACH | $315 | $365 | $355 | 1% |
| 643E00720 CHEVRON MARKING | 12,701 FT | $2.76 | $2.75 | $2.50 | 1% |
| 643E01310 WRONG WAY ARROW | 171 EACH | $195 | $225 | $180 | 1% |
| 807E10310 WET REFLECTIVE TRAFFIC PAINT, CHANNELIZING LINE, 1 | 21,420 FT | $1.47 | $1.43 | $1.25 | 1% |
| 624E10000 MOBILIZATION | 1 LS | $29,250 | $15,000 | $15,000 | 1% |
| 643E01510 DOTTED LINE, 6" | 45,960 FT | $0.47 | $0.53 | $0.85 | 1% |
| Item | Quantity | R1Alpha Space Control LLC | R2The Aero-mark Company LLC | R3Oglesby Construction INC |
|---|---|---|---|---|
| 832E30000 EROSION CONTROL Section 1 - EROSION CONTROL - Totals Awd $1,500.00 2 $1,500.00 3 $1,500.00 | 1,500 EACH | $1.00 | $1.00 | $1.00 |
| 618E43000 RUMBLE STRIPES, CENTER LINE (ASPHALT CONCRETE) Section 2 - PAVEMENT - Totals Awd $14,745.04 2 $7,074.55 3 $6,970.00 | 6.97 MILE | $2,116 | $1,015 | $1,000 |
| 643E00204 LANE LINE, 6" | 11.5 MILE | $314 | $527 | $470 |
| 643E00620 CROSSWALK LINE, 12" | 8,163 FT | $1.96 | $2.50 | $2.50 |
| 643E00900 ISLAND MARKING | 702 SF | $2.45 | $3.00 | $2.50 |
| 643E01110 SCHOOL SYMBOL MARKING, 96" | 81 EACH | $225 | $365 | $355 |
| 643E01410 WORD ON PAVEMENT, 96" | 51 EACH | $75.00 | $65.00 | $80.00 |
| 643E01602 BIKE LANE SYMBOL MARKING | 21 EACH | $65.00 | $400 | $55.00 |
| 643E20802 YIELD LINE | 838 FT | $8.50 | $6.00 | $5.00 |
| 643E30000 REMOVAL OF PAVEMENT MARKING | 200 FT | $2.35 | $5.00 | $2.00 |
| 643E30010 REMOVAL OF PAVEMENT MARKING | 100 SF | $2.50 | $5.00 | $2.00 |
| 643E30020 REMOVAL OF PAVEMENT MARKING | 50 EACH | $125 | $175 | $50.00 |
| 643E40000 SPEED MEASUREMENT MARKING | 15 EACH | $335 | $900 | $900 |
| 643E50100 PAVEMENT MARKING, MISC.: BIKE CROSSING | 15 EACH | $285 | $400 | $600 |
| 643E50100 PAVEMENT MARKING, MISC.: LANE REDUCTION ARROW | 40 EACH | $285 | $300 | $285 |
| 807E10410 WET REFLECTIVE TRAFFIC PAINT, DOTTED LINE, 6" Section 3 - TRAFFIC CONTROL - Totals Awd $3,674,842.34 2 $4,105,827.74 3 $4,409,951.15 | 825 FT | $1.00 | $1.00 | $0.70 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $2,500 | $29,000 | $25,000 |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $750 | $650 | $500 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1.00 | $1.00 | $1.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →