D12-BH FY2026 Overlay
D12 County · est $2.2M
Bid dateThursday, February 19—
Awarded toOHIO CONCRETE MAINTENANCE LLC$1.84M
D12 County · est $2.2M
Bid form · ODOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 624E10000 MOBILIZATION Section 12 - INCIDENTALS - Totals Awd $232,000.00 2 $455,400.00 3 $324,578.00 4 $339,552.50 | 1 LS | $115,000 | $115k | 6% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 1,421 SY | $80 | $114k | 6% |
| 530E00600 SPECIAL - STRUCTURES: TIMBER SUBDECK | 7,293 SF | $14 | $102k | 6% |
| 517E70100 RAILING (THREE STEEL TUBE BRIDGE RAILING) | 192 FT | $500 | $96k | 5% |
| 848E10000 MICRO SILICA MODIFIED CONCRETE OVERLAY USING HYDRO | 1,421 SY | $63 | $90k | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $75,000 | $75k | 4% |
| 614E11300 SPECIAL - WORK ZONE TRAFFIC SIGNAL | 14 EACH | $5,000 | $70k | 4% |
| 202E11301 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 23 CY | $2,800 | $64k | 3% |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN Section 11 - STRUCTURE REPAIR (CUY-90-0595 or 1807730 - Totals Awd $103,900.00 2 $103,875.00 3 $201,210.00 4 $173,501.50 | 508 SF | $120 | $61k | 3% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 480 HOUR | $120 | $58k | 3% |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 78 more items below.
| Item | Quantity | R1Ohio Concrete Maintenance LLC | R2Great Lakes Construction CO | R3Catts Construction INC | R4Perk Company INC | % of bid |
|---|---|---|---|---|---|---|
| 624E10000 MOBILIZATION Section 12 - INCIDENTALS - Totals Awd $232,000.00 2 $455,400.00 3 $324,578.00 4 $339,552.50 | 1 LS | $115,000 | $117,500 | $142,728 | $92,089 | 9% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 1,421 SY | $80.00 | $90.00 | $80.00 | $120 | 9% |
| 530E00600 SPECIAL - STRUCTURES: TIMBER SUBDECK | 7,293 SF | $14.00 | $15.00 | $9.00 | $7.00 | 8% |
| 517E70100 RAILING (THREE STEEL TUBE BRIDGE RAILING) | 192 FT | $500 | $465 | $556 | $482 | 8% |
| 848E10000 MICRO SILICA MODIFIED CONCRETE OVERLAY USING HYDRO | 1,421 SY | $63.00 | $80.00 | $71.00 | $80.00 | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $75,000 | $268,000 | $145,000 | $190,000 | 6% |
| 614E11300 SPECIAL - WORK ZONE TRAFFIC SIGNAL | 14 EACH | $5,000 | $6,700 | $11,469 | $4,000 | 6% |
| 202E11301 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 23 CY | $2,800 | $7,500 | $5,400 | $3,100 | 5% |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN Section 11 - STRUCTURE REPAIR (CUY-90-0595 or 1807730 - Totals Awd $103,900.00 2 $103,875.00 3 $201,210.00 4 $173,501.50 | 508 SF | $120 | $125 | $244 | $205 | 5% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 480 HOUR | $120 | $100 | $90.00 | $125 | 5% |
| 511E34412 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE: REP | 28 CY | $2,000 | $1,850 | $2,851 | $2,843 | 5% |
| 848E10000 MICRO SILICA MODIFIED CONCRETE OVERLAY USING HYDRO | 356 SY | $150 | $235 | $133 | $173 | 4% |
| 516E10501 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC C | 72 FT | $650 | $1,500 | $1,590 | $1,933 | 4% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 356 SY | $102 | $130 | $103 | $171 | 3% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) (8" THICK) | 89 CY | $390 | $350 | $418 | $532 | 3% |
| 519E00100 SPECIAL - COMPOSITE FIBER WRAP SYSTEM | 912 SF | $35.00 | $35.00 | $66.00 | $56.00 | 3% |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,600 | $1,751 | $2,771 | $1,751 | 3% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 1,232 FT | $25.00 | $37.00 | $20.00 | $35.00 | 3% |
| 625E98000 LIGHTING, MISC.: SIGNAL SUPPORT MOUNTED Section 5 - MAINTENANCE OF TRAFFIC - Totals Awd $295,987.00 2 $265,112.89 3 $307,275.06 4 $260,135.75 | 6 EACH | $5,000 | $500 | $1,027 | $3,000 | 2% |
| 519E11100 PATCHING CONCRETE STRUCTURE | 236 SF | $125 | $125 | $244 | $205 | 2% |
| Item | Quantity | R1Ohio Concrete Maintenance LLC | R2Great Lakes Construction CO | R3Catts Construction INC | R4Perk Company INC |
|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED (FULL DEPTH) | 136 SY | $90.00 | $76.00 | $45.00 | $50.00 |
| 202E38000 GUARDRAIL REMOVED | 100 FT | $4.00 | $2.50 | $3.00 | $6.00 |
| 204E10000 SUBGRADE COMPACTION | 435 SY | $5.00 | $6.00 | $2.00 | $5.00 |
| 606E34600 MGS BRIDGE TERMINAL ASSEMBLY, TYPE TST-2 Section 1 - ROADWAY - Totals Awd $27,615.00 2 $24,736.00 3 $21,078.00 4 $20,975.00 | 4 EACH | $3,200 | $2,885 | $3,447 | $2,850 |
| 832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $10,000.00 2 $10,000.00 3 $10,000.00 4 $10,000.00 | 10,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1 1/2" DEPTH) | 107 SY | $22.00 | $20.00 | $24.00 | $85.00 |
| 304E20000 AGGREGATE BASE (6" THICK) | 73 CY | $130 | $150 | $136 | $125 |
| 407E20000 NON-TRACKING TACK COAT | 72 GAL | $2.25 | $2.00 | $2.40 | $6.00 |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 13 CY | $655 | $600 | $717 | $850 |
| 441E70101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), AS | 5 CY | $1,100 | $1,000 | $1,195 | $1,550 |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (18 CY | $450 | $400 | $478 | $1,325 |
| 618E43000 RUMBLE STRIPES, CENTER LINE (ASPHALT CONCRETE) Section 3 - PAVEMENT - Totals Awd $73,871.00 2 $65,434.00 3 $79,207.00 4 $115,650.00 | 0.07 MILE | $72,000 | $15,000 | $77,660 | $100,000 |
| 626E00112 BARRIER REFLECTOR, TYPE 3, BIDIRECTIONAL | 6 EACH | $20.00 | $15.00 | $18.00 | $13.00 |
| 646E10010 EDGE LINE, 6" | 1.03 MILE | $17,500 | $14,160 | $16,918 | $14,160 |
| 646E10200 CENTER LINE Section 4 - TRAFFIC CONTROL - Totals Awd $25,165.00 2 $21,484.20 3 $25,669.54 4 $21,472.20 | 0.36 MILE | $19,500 | $18,915 | $22,600 | $18,915 |
| 512E74500 REMOVAL OF EXISTING PAVEMENT MARKING | 3,096 FT | $6.50 | $1.65 | $2.00 | $1.75 |
| 614E12420 DETOUR SIGNING | 1 LS | $20,000 | $9,751 | $11,650 | $9,750 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 28 CY | $450 | $400 | $100 | $900 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, BIDIRECTIONAL | 35 EACH | $20.00 | $10.00 | $14.00 | $12.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 35 EACH | $30.00 | $17.71 | $21.00 | $18.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 2 SNMT | $1,200 | $1,154 | $1,378 | $1,100 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 0.74 MILE | $8,250 | $4,175 | $4,988 | $4,175 |
| 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" | 0.91 MILE | $6,000 | $2,875 | $3,434 | $2,875 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 136 FT | $5.50 | $5.00 | $6.00 | $5.00 |
| 622E41110 PORTABLE BARRIER, ANCHORED | 240 FT | $30.00 | $75.00 | $30.00 | $50.00 |
| 202E32801 CONCRETE SLOPE PROTECTION REMOVED, AS PER PLAN | 138 SY | $145 | $80.00 | $27.00 | $85.00 |
| 512E10600 CONCRETE REPAIR BY EPOXY INJECTION | 50 FT | $80.00 | $40.00 | $198 | $165 |
| 513E21500 REPLACEMENT OF DETERIORATED END CROSSFRAMES | 230 LB | $59.00 | $90.00 | $58.00 | $38.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 34 SF | $80.00 | $310 | $60.00 | $50.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 34 SF | $80.00 | $45.00 | $60.00 | $50.00 |
| 516E46701 RESET BEARING, AS PER PLAN | 5 EACH | $1,000 | $1,250 | $1,622 | $10,813 |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $11,000 | $12,000 | $11,971 | $14,000 |
| 519E11100 PATCHING CONCRETE STRUCTURE | 26 SF | $150 | $200 | $245 | $288 |
| 519E11600 SPECIAL - PATCHING CONCRETE STRUCTURE, MISC.: PARA | 180 SF | $100 | $105 | $245 | $200 |
| 519E11720 SPECIAL - PATCHING CONCRETE STRUCTURE, MISC.: SAFE | 151 FT | $70.00 | $105 | $126 | $175 |
| 601E21001 CONCRETE SLOPE PROTECTION, AS PER PLAN | 144 SY | $198 | $205 | $143 | $186 |
| 848E30000 MICRO SILICA MODIFIED CONCRETE OVERLAY (VARIABLE T | 10 CY | $350 | $350 | $369 | $300 |
| 848E50000 HAND CHIPPING | 180 SY | $130 | $265 | $180 | $125 |
| 848E50100 TEST SLAB | 1 LS | $500 | $2,000 | $2,353 | $100 |
| 848E50200 FULL-DEPTH REPAIR | 4 CY | $500 | $2,750 | $2,946 | $3,000 |
| 848E50321 EXISTING CONCRETE OVERLAY REMOVED, AS PER PLAN (1 Section 6 - STRUCTURE REPAIR (CUY-480-1686 or 181309 - Totals Awd $467,496.00 2 $574,278.00 3 $492,534.25 4 $598,153.00 | 1,421 SY | $9.00 | $18.00 | $14.75 | $20.00 |
| 202E23501 WEARING COURSE REMOVED, AS PER PLAN | 280 SY | $30.00 | $25.00 | $59.50 | $57.00 |
| 202E38501 BRIDGE RAILING REMOVED, AS PER PLAN | 58 FT | $9.00 | $8.00 | $10.00 | $50.00 |
| 407E10000 TACK COAT | 31 GAL | $2.25 | $2.00 | $2.40 | $6.00 |
| 441E70101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), AS | 21 CY | $900 | $800 | $955 | $860 |
| 512E33010 TYPE 3 WATERPROOFING | 133 SY | $35.00 | $57.00 | $65.00 | $100 |
| 517E72511 RAILING (DEEP BEAM RAIL WITH 3 STEEL TUBULAR BACKU | 61 FT | $155 | $142 | $170 | $167 |
| 518E22300 SPECIAL - STEEL DRIP STRIP Section 7 - STRUCTURE REPAIR (GEA-6-1067 or 2800071) - Totals Awd $43,665.75 2 $46,777.00 3 $59,304.00 4 $63,457.00 | 64 FT | $26.00 | $97.00 | $46.00 | $44.75 |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 1,301 LB | $2.00 | $4.75 | $5.00 | $5.00 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 166 SY | $40.00 | $45.00 | $57.00 | $66.50 |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 590 SF | $45.00 | $40.00 | $77.65 | $65.00 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 590 SF | $6.00 | $5.00 | $53.75 | $45.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 590 SF | $6.00 | $5.00 | $18.00 | $15.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 590 SF | $6.00 | $5.00 | $12.00 | $15.00 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 212 FT | $26.00 | $65.00 | $61.00 | $30.00 |
| 519E11100 PATCHING CONCRETE STRUCTURE | 4 SF | $200 | $500 | $597 | $500 |
| 848E30000 MICRO SILICA MODIFIED CONCRETE OVERLAY (VARIABLE T | 5 CY | $400 | $400 | $368 | $300 |
| 848E50000 HAND CHIPPING | 65 SY | $130 | $265 | $179 | $150 |
| 848E50100 TEST SLAB | 1 LS | $500 | $2,000 | $2,353 | $100 |
| 848E50321 EXISTING CONCRETE OVERLAY REMOVED, AS PER PLAN Section 8 - STRUCTURE REPAIR (GEA-166-0219 or 280107 - Totals Awd $385,806.00 2 $547,272.75 3 $554,494.60 4 $494,488.00 | 1 (356 SY | $45.00 | $58.00 | $49.00 | $25.00 |
| 202E23501 WEARING COURSE REMOVED, AS PER PLAN | 325 SY | $30.00 | $20.00 | $49.00 | $60.00 |
| 202E38501 BRIDGE RAILING REMOVED, AS PER PLAN | 106 FT | $9.00 | $8.00 | $9.00 | $50.00 |
| 407E10000 TACK COAT | 36 GAL | $2.25 | $2.00 | $2.00 | $6.00 |
| 441E70101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), AS | 33 CY | $675 | $600 | $715 | $1,160 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 3 SY | $150 | $500 | $597 | $1,428 |
| 512E10600 CONCRETE REPAIR BY EPOXY INJECTION | 68 FT | $80.00 | $40.00 | $197 | $165 |
| 512E33010 TYPE 3 WATERPROOFING | 205 SY | $35.00 | $65.00 | $65.00 | $76.00 |
| 517E72511 RAILING (DEEP BEAM RAIL WITH 3 STEEL TUBULAR BACKU | 106 FT | $156 | $141 | $168 | $163 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 114 FT | $26.00 | $70.00 | $50.00 | $62.00 |
| 519E11600 SPECIAL - PATCHING CONCRETE STRUCTURE: REPAIR CORR Section 9 - STRUCTURE REPAIR (GEA-306-0845 or 280126 - Totals Awd $145,050.00 2 $208,316.00 3 $273,730.00 4 $313,907.00 | 25 SF | $125 | $125 | $364 | $305 |
| 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 1 LS | $9,500 | $17,500 | $12,896 | $11,668 |
| 512E10600 CONCRETE REPAIR BY EPOXY INJECTION | 84 FT | $100 | $40.00 | $197 | $165 |
| 513E90000 STRUCTURAL STEEL, MISC.: EXPANSION JOINT COVER PLA Section 10 - STRUCTURE REPAIR (LAK-90-0243 or 4303482 - Totals Awd $31,769.00 2 $34,126.00 3 $43,916.00 4 $61,708.00 | 603 LB | $23.00 | $22.00 | $24.00 | $60.00 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 213 SY | $40.00 | $35.00 | $57.00 | $66.50 |
| 512E10600 CONCRETE REPAIR BY EPOXY INJECTION | 25 FT | $100 | $40.00 | $197 | $165 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $26,500 | $35,500 | $24,430 | $21,000 |
| 619E16011 FIELD OFFICE, TYPE B, AS PER PLAN | 7 MNTH | $1,500 | $4,200 | $1,433 | $2,352 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,000 | $5,000 | $2,389 | $20,000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →