JAC-SR 788-00.87
JAC County · est $1.2M
Bid dateThursday, February 19—
Awarded toD G M INC$984,961.9
JAC County · est $1.2M
Bid form · ODOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 515E12040 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 10 EACH | $16,500 | $165k | 17% |
| 524E94702 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK | 301 FT | $388 | $117k | 12% |
| 511E31611 CLASS QC2 CONCRETE, SUPERSTRUCTURE, AS PER PLAN | 43 CY | $2,150 | $92k | 9% |
| 517E70100 RAILING (THREE STEEL TUBE BRIDGE RAILING) | 131 FT | $425 | $56k | 6% |
| 511E43510 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING | 68 CY | $675 | $46k | 5% |
| 202E11202 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN | 1 LS | $42,500 | $43k | 4% |
| 526E15000 REINFORCED CONCRETE APPROACH SLABS (T=13") | 134 SY | $275 | $37k | 4% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 129 CY | $260 | $34k | 3% |
| 516E44000 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 40 EACH | $800 | $32k | 3% |
| 524E94604 DRILLED SHAFTS, 30" DIAMETER, INTO BEDROCK | 65 FT | $388 | $25k | 3% |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 57 more items below.
| Item | Quantity | R1D G M INC | R2R C Construction Company And Son INC | R3Double Z Construction Company | R4George J Igel & CO INC | R5Axis Civil Construction LLC | R6Complete General Construction Company | R7Shelly & Sands INC | R8Beaver Excavating Company | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|
| 515E12040 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 10 EACH | $16,500 | $16,000 | $15,000 | $18,225 | $17,500 | $15,000 | $17,264 | $14,500 | 20% |
| 524E94702 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK | 301 FT | $388 | $500 | $400 | $400 | $360 | $340 | $323 | $500 | 14% |
| 511E31611 CLASS QC2 CONCRETE, SUPERSTRUCTURE, AS PER PLAN | 43 CY | $2,150 | $1,200 | $1,570 | $1,705 | $1,650 | $1,500 | $2,300 | $1,950 | 11% |
| 517E70100 RAILING (THREE STEEL TUBE BRIDGE RAILING) | 131 FT | $425 | $425 | $421 | $421 | $421 | $421 | $440 | $425 | 7% |
| 511E43510 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING | 68 CY | $675 | $950 | $925 | $931 | $1,200 | $1,100 | $1,000 | $1,300 | 6% |
| 202E11202 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN | 1 LS | $42,500 | $20,000 | $60,000 | $45,000 | $36,000 | $95,000 | $38,070 | $70,000 | 5% |
| 526E15000 REINFORCED CONCRETE APPROACH SLABS (T=13") | 134 SY | $275 | $250 | $390 | $400 | $395 | $425 | $413 | $400 | 5% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 129 CY | $260 | $240 | $230 | $325 | $320 | $230 | $240 | $230 | 4% |
| 516E44000 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 40 EACH | $800 | $725 | $600 | $925 | $800 | $775 | $775 | $750 | 4% |
| 524E94604 DRILLED SHAFTS, 30" DIAMETER, INTO BEDROCK | 65 FT | $388 | $500 | $340 | $251 | $500 | $360 | $753 | $550 | 3% |
| 625E33000 STRUCTURE GROUNDING SYSTEM | 1 EACH | $20,000 | $20,000 | $13,776 | $13,776 | $17,500 | $14,000 | $17,500 | $19,500 | 2% |
| 624E10000 MOBILIZATION Section 8 - INCIDENTALS - Totals Awd $59,000.00 2 $98,000.00 3 $73,400.00 4 $80,350.00 5 $78,600.00 6 $76,400.00 7 $98,649.00 8 $114,000.00 | 1 LS | $20,000 | $25,000 | $50,000 | $54,950 | $40,000 | $40,000 | $56,438 | $60,000 | 2% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 78 CY | $250 | $400 | $255 | $346 | $390 | $255 | $400 | $255 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $19,000 | $35,000 | $7,600 | $5,600 | $12,000 | $8,000 | $6,311 | $30,000 | 2% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 13,908 LB | $1.30 | $3.00 | $2.00 | $1.75 | $2.30 | $2.20 | $1.50 | $1.69 | 2% |
| 304E20000 AGGREGATE BASE | 177 CY | $100 | $110 | $92.00 | $120 | $130 | $144 | $114 | $125 | 2% |
| 526E90010 TYPE A INSTALLATION | 60 FT | $250 | $200 | $220 | $250 | $390 | $250 | $246 | $240 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $14,000 | $20,000 | $5,000 | $1,800 | $15,000 | $6,000 | $3,500 | $5,000 | 2% |
| 202E23000 PAVEMENT REMOVED | 860 SY | $15.00 | $25.00 | $28.00 | $18.00 | $16.00 | $30.00 | $19.00 | $20.00 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $12,500 | $3,500 | $5,000 | $5,600 | $15,000 | $5,000 | $9,800 | $25,000 | 2% |
| Item | Quantity | R1D G M INC | R2R C Construction Company And Son INC | R3Double Z Construction Company | R4George J Igel & CO INC | R5Axis Civil Construction LLC | R6Complete General Construction Company | R7Shelly & Sands INC | R8Beaver Excavating Company |
|---|---|---|---|---|---|---|---|---|---|
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 110 FT | $25.00 | $50.00 | $8.00 | $18.00 | $28.00 | $40.00 | $15.00 | $24.00 |
| 202E38000 GUARDRAIL REMOVED | 278 FT | $1.00 | $5.00 | $6.00 | $5.00 | $8.00 | $3.00 | $4.00 | $10.00 |
| 203E10000 EXCAVATION | 246 CY | $30.00 | $25.00 | $30.00 | $35.00 | $32.00 | $30.00 | $25.00 | $27.00 |
| 203E20000 EMBANKMENT | 159 CY | $30.00 | $25.00 | $20.00 | $25.00 | $32.00 | $34.00 | $25.00 | $35.00 |
| 204E10000 SUBGRADE COMPACTION | 1,309 SY | $4.00 | $2.00 | $6.00 | $2.60 | $3.00 | $5.00 | $5.00 | $2.70 |
| 204E45000 PROOF ROLLING | 1 HOUR | $75.00 | $100 | $200 | $118 | $250 | $140 | $225 | $1,500 |
| 606E15050 GUARDRAIL, TYPE MGS | 300 FT | $28.00 | $26.00 | $24.98 | $24.98 | $25.00 | $24.98 | $22.00 | $25.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 1 EACH | $2,500 | $2,400 | $2,400 | $2,400 | $2,400 | $2,400 | $2,650 | $2,400 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 5 EACH | $1,000 | $1,000 | $1,000 | $1,000 | $1,000 | $1,000 | $1,300 | $1,000 |
| 606E34600 MGS BRIDGE TERMINAL ASSEMBLY, TYPE TST-2 | 3 EACH | $2,300 | $2,200 | $2,200 | $2,200 | $2,200 | $2,200 | $2,650 | $2,200 |
| 606E34601 MGS BRIDGE TERMINAL ASSEMBLY, TYPE TST-2, AS PER P | 1 EACH | $2,500 | $2,500 | $2,500 | $2,500 | $2,500 | $2,500 | $3,000 | $2,500 |
| 690E50350 SPECIAL - MAILBOX REMOVED AND RESET Section 1 - ROADWAY - Totals Awd $71,939.00 2 $69,783.00 3 $74,986.00 4 $65,375.40 5 $76,401.00 6 $80,399.00 7 $73,097.00 8 $89,836.30 | 3 EACH | $250 | $250 | $250 | $275 | $400 | $300 | $200 | $325 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 83 CY | $120 | $150 | $115 | $125 | $128 | $116 | $115 | $135 |
| 659E00300 TOPSOIL | 104 CY | $25.00 | $5.00 | $50.00 | $8.50 | $60.00 | $50.00 | $35.00 | $70.00 |
| 659E10000 SEEDING AND MULCHING | 940 SY | $4.00 | $5.00 | $8.00 | $5.65 | $2.80 | $5.00 | $3.20 | $3.20 |
| 659E20000 COMMERCIAL FERTILIZER | 0.13 TON | $1,500 | $2,000 | $1,250 | $1,250 | $560 | $700 | $1,250 | $1,250 |
| 659E31000 LIME | 0.19 ACRE | $300 | $2,000 | $150 | $150 | $320 | $100 | $150 | $150 |
| 659E35000 WATER | 5 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $26,077.00 2 $27,815.00 3 $31,961.00 4 $26,266.00 5 $29,134.60 6 $29,143.00 7 $25,889.00 8 $31,189.00 | 9,500 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 121 FT | $30.00 | $25.00 | $20.00 | $52.00 | $20.00 | $24.00 | $16.00 | $30.00 |
| 611E01400 6" CONDUIT, TYPE E | 25 FT | $8.00 | $5.00 | $8.00 | $44.60 | $22.00 | $35.00 | $20.00 | $53.00 |
| 611E01500 6" CONDUIT, TYPE F | 25 FT | $6.00 | $5.00 | $8.00 | $44.60 | $22.00 | $60.00 | $20.00 | $120 |
| 611E04900 12" CONDUIT, TYPE D | 76 FT | $100 | $125 | $80.00 | $62.00 | $65.00 | $90.00 | $53.00 | $85.00 |
| 611E10900 24" CONDUIT, TYPE D Section 3 - DRAINAGE - Totals Awd $17,580.00 2 $19,025.00 3 $14,900.00 4 $17,484.00 5 $12,710.00 6 $19,119.00 7 $11,564.00 8 $20,165.00 | 50 FT | $120 | $125 | $120 | $85.00 | $85.00 | $140 | $92.00 | $115 |
| 253E02000 PAVEMENT REPAIR | 25 CY | $330 | $25.00 | $380 | $185 | $300 | $480 | $350 | $480 |
| 407E10000 TACK COAT | 165 GAL | $4.70 | $10.00 | $4.70 | $8.90 | $7.00 | $4.70 | $3.50 | $4.70 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 44 CY | $120 | $110 | $125 | $142 | $130 | $150 | $120 | $140 |
| 441E70500 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449) | — | $1,150 | $900 | $1,150 | $160 | $465 | $1,150 | $900 | $1,150 |
| 617E10100 COMPACTED AGGREGATE Section 4 - PAVEMENT - Totals Awd $90,370.50 2 $94,195.00 3 $87,569.50 4 $104,312.75 5 $114,105.00 6 $101,623.50 7 $103,395.50 8 $97,445.50 | 25 CY | $75.00 | $110 | $100 | $52.35 | $145 | $150 | $150 | $135 |
| 621E00100 RPM | 4 EACH | $500 | $550 | $750 | $602 | $500 | $500 | $500 | $500 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 4 EACH | $1.00 | $100 | $50.00 | $30.00 | $50.00 | $55.00 | $16.00 | $5.00 |
| 626E00112 BARRIER REFLECTOR, TYPE 3 (BI-DIRECTIONAL) | 10 EACH | $15.00 | $10.00 | $20.00 | $11.00 | $11.00 | $11.00 | $12.50 | $11.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 20 FT | $45.00 | $20.00 | $15.00 | $15.00 | $15.00 | $15.00 | $45.00 | $15.00 |
| 630E08600 SIGN POST REFLECTOR | 2 EACH | $25.00 | $100 | $30.00 | $30.00 | $55.00 | $30.00 | $25.00 | $30.00 |
| 630E80100 SIGN, FLAT SHEET | 6 SF | $125 | $40.00 | $40.00 | $40.00 | $16.00 | $40.00 | $125 | $40.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 2 EACH | $175 | $100 | $15.00 | $15.00 | $20.00 | $15.00 | $175 | $15.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $175 | $100 | $15.00 | $15.00 | $25.00 | $15.00 | $175 | $15.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.14 MILE | $7,000 | $5,500 | $7,000 | $11,144 | $5,350 | $5,350 | $5,350 | $5,350 |
| 642E00300 CENTER LINE, TYPE 1 Section 5 - TRAFFIC CONTROL - Totals Awd $6,374.00 2 $5,424.00 3 $5,530.00 4 $6,418.11 5 $4,368.65 6 $4,452.65 7 $6,051.65 8 $4,252.65 | 0.07 MILE | $12,000 | $10,200 | $7,000 | $22,285 | $10,195 | $10,195 | $10,195 | $10,195 |
| 614E12420 DETOUR SIGNING | 1 LS | $4,000 | $20,000 | $9,000 | $7,135 | $3,950 | $3,950 | $3,950 | $10,000 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 50 CY | $160 | $25.00 | $140 | $282 | $250 | $300 | $275 | $250 |
| 616E10000 WATER Section 6 - MAINTENANCE OF TRAFFIC - Totals Awd $12,003.00 2 $21,253.00 3 $16,150.00 4 $21,343.90 5 $16,453.00 6 $19,430.00 7 $18,075.00 8 $22,845.00 | 3 MGAL | $1.00 | $1.00 | $50.00 | $41.30 | $1.00 | $160 | $125 | $115 |
| 202E23500 WEARING COURSE REMOVED | 126 SY | $10.00 | $25.00 | $15.00 | $18.00 | $12.00 | $28.00 | $16.00 | $14.50 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $500 | $15,000 | $30,000 | $100 | $26,000 | $8,000 | $17,000 | $45,000 |
| 503E21100 UNCLASSIFIED EXCAVATION | 188 CY | $25.00 | $25.00 | $190 | $260 | $35.00 | $125 | $190 | $215 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 70 SY | $40.00 | $50.00 | $40.00 | $50.00 | $50.00 | $50.00 | $50.00 | $100 |
| 512E33000 TYPE 2 WATERPROOFING | 10 SY | $50.00 | $35.00 | $50.00 | $52.00 | $100 | $60.00 | $67.00 | $80.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 27 SF | $25.00 | $50.00 | $20.00 | $15.00 | $15.00 | $16.00 | $20.00 | $28.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 71 FT | $50.00 | $100 | $40.00 | $49.00 | $65.00 | $49.00 | $49.00 | $40.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 52 CY | $135 | $110 | $135 | $160 | $125 | $140 | $145 | $120 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 68 FT | $25.00 | $50.00 | $30.00 | $16.00 | $25.00 | $30.00 | $16.00 | $25.00 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 90 FT | $25.00 | $50.00 | $12.00 | $12.00 | $11.00 | $14.00 | $5.00 | $19.00 |
| 518E40011 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 36 FT | $75.00 | $50.00 | $50.00 | $105 | $12.00 | $24.00 | $50.00 | $19.00 |
| 894E10000 THERMAL INTEGRITY PROFILING (TIP) TEST Section 7 - STRUCTURE OVER 20 FOOT SPAN (SFN 4004330 - Totals Awd $701,618.40 2 $729,669.00 3 $763,343.00 4 $783,313.35 5 $778,363.40 6 $781,221.60 7 $801,915.00 8 $889,156.52 | 2 EACH | $4,250 | $4,000 | $4,000 | $5,200 | $3,875 | $7,000 | $3,615 | $5,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $4,000 | $15,000 | $10,000 | $11,000 | $10,000 | $18,000 | $27,000 | $15,000 |
| 623E50000 PRECONSTRUCTION SURVEY MONUMENT VERIFICATION AND R | 1 LS | $1,000 | $1,500 | $400 | $3,600 | $800 | $2,200 | $2,700 | $2,000 |
| 623E51000 POST CONSTRUCTION SURVEY MONUMENT VERIFICATION AND | 1 LS | $1,000 | $1,500 | $400 | $3,400 | $800 | $2,200 | $2,700 | $2,000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →