BID #260090 · ODOTRESULT · awarded Feb 19

MOT-Trotwood Olive Rd Walks SA22

MOT County · est $0.9M

Bid dateThursday, February 19
Awarded toPerformance Site Development$828,510.81
read → connected → answeredcassandri

Project scope

Bid form · ODOT

110ITEMS
  • Signals & Lighting19%
  • Pavement Marking8%
  • Curb, Walk & Ramp7%
  • Signs7%
  • Drainage6%
  • Earthwork5%
  • Other46%

Top items by winning bid

ItemQtyUnit priceExtended%
608E10001 4" CONCRETE WALK, AS PER PLAN7,940 SF$8.85$70k8%
201E11000 CLEARING AND GRUBBING1 LS$44,150$44k5%
809E69101 STOP LINE RADAR DETECTION, AS PER PLAN4 EACH$10,308$41k5%
441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG36 CY$1,088$39k5%
832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $76,013.50 2 $61,585.00 3 $78,065.50 4 $57,055.00 5 $58,500.2530,000 EACH$1$30k4%
608E52000 CURB RAMP1,195 SF$22.25$27k3%
659E00300 TOPSOIL360 CY$68.3$25k3%
609E26000 CURB, TYPE 6 Section 4 - PAVEMENT - Totals Awd $134,260.10 2 $116,643.00 3 $129,907.35 4 $184,745.00 5 $175,415.00590 FT$39$23k3%
809E69001 ADVANCE RADAR DETECTION, AS PER PLAN2 EACH$10,734$21k3%
623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING1 LS$19,995$20k2%

Per-bidder unit pricing

ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 90 more items below.

Rank 1Performance Site Development$829kRank 2Brumbaugh Construction INC$845kRank 3Double Jay Construction INC$944kRank 4Perram Electric INC$1.11MRank 5Complete General Construction Company$1.16M
ItemQuantityR1Performance Site DevelopmentR2Brumbaugh Construction INCR3Double Jay Construction INCR4Perram Electric INCR5Complete General Construction Company
608E10001 4" CONCRETE WALK, AS PER PLAN7,940 SF$8.85$9.00$7.85$8.00$12.30
201E11000 CLEARING AND GRUBBING1 LS$44,150$46,000$45,550$32,500$50,000
809E69101 STOP LINE RADAR DETECTION, AS PER PLAN4 EACH$10,308$10,300$10,415$10,075$9,000
441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG36 CY$1,088$532$557$975$975
832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $76,013.50 2 $61,585.00 3 $78,065.50 4 $57,055.00 5 $58,500.2530,000 EACH$1.00$1.00$1.00$1.00$1.00
608E52000 CURB RAMP1,195 SF$22.25$23.00$18.00$26.00$13.50
659E00300 TOPSOIL360 CY$68.30$60.00$71.50$30.00$47.00
609E26000 CURB, TYPE 6 Section 4 - PAVEMENT - Totals Awd $134,260.10 2 $116,643.00 3 $129,907.35 4 $184,745.00 5 $175,415.00590 FT$39.00$45.00$43.15$56.00$38.00
809E69001 ADVANCE RADAR DETECTION, AS PER PLAN2 EACH$10,734$10,750$10,794$10,150$9,300
623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING1 LS$19,995$15,000$9,878$8,000$10,000
611E04400 12" CONDUIT, TYPE B200 FT$97.60$87.00$74.20$110$235
606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS682.5 FT$28.36$28.00$29.70$26.40$26.00
614E11000 MAINTAINING TRAFFIC1 LS$18,995$40,000$77,452$189,008$70,000
624E10000 MOBILIZATION Section 9 - INCIDENTALS - Totals Awd $73,965.00 2 $95,010.00 3 $132,041.85 4 $257,066.70 5 $174,000.001 LS$17,950$33,000$37,510$40,000$87,000
301E56000 ASPHALT CONCRETE BASE, PG64-22, (449)71 CY$242$490$513$575$575
103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM1 LS$17,025$7,010$7,202$20,059$7,000
633E65511 CABINET, TYPE TS-2, AS PER PLAN1 EACH$16,275$16,300$24,723$22,385$20,000
632E87140 COMBINATION STRAIN POLE, TYPE TC-81.11, DESIGN 121 EACH$16,270$16,300$15,431$14,340$14,000
631E97700 SIGN LIGHTING MISC.: WARNING SIGN FLASHER ASSEMBLY2 EACH$7,856$7,875$1,615$1,805$1,500
632E87130 COMBINATION STRAIN POLE, TYPE TC-81.11, DESIGN 101 EACH$14,717$14,750$14,101$13,285$12,000
Show all 110 line items
ItemQuantityR1Performance Site DevelopmentR2Brumbaugh Construction INCR3Double Jay Construction INCR4Perram Electric INCR5Complete General Construction Company
202E23000 PAVEMENT REMOVED613 SY$6.40$17.00$17.45$11.00$45.00
202E30000 WALK REMOVED925 SF$4.00$4.00$1.80$5.00$6.50
202E32000 CURB REMOVED210 FT$11.00$15.00$15.10$17.50$28.00
202E38000 GUARDRAIL REMOVED330 FT$6.35$7.00$6.60$2.40$2.50
202E75000 FENCE REMOVED70 FT$6.35$12.00$11.10$14.00$9.50
203E10000 EXCAVATION431 CY$29.55$30.00$30.10$50.00$150
203E20000 EMBANKMENT345 CY$25.00$38.00$31.20$45.00$11.50
204E10000 SUBGRADE COMPACTION417 SY$4.00$3.00$2.95$3.25$11.50
606E26550 ANCHOR ASSEMBLY, MGS TYPE T3 EACH$1,392$1,400$1,458$1,420$1,420
608E13000 6" CONCRETE WALK180 SF$12.25$12.00$9.90$11.50$21.50
608E15000 8" CONCRETE WALK460 SF$12.95$14.00$11.85$11.50$30.00
608E53020 DETECTABLE WARNING Section 1 - ROADWAY - Totals Awd $210,523.70 2 $229,047.00 3 $208,961.35 4 $214,613.25 5 $318,550.0080 SF$29.00$56.00$53.00$33.00$8.75
659E00510 SEEDING AND MULCHING, CLASS 23,235 SY$2.40$1.00$2.50$2.50$1.75
659E20000 COMMERCIAL FERTILIZER0.45 TON$800$1,400$840$750$1,500
659E35000 WATER18 MGAL$31.75$5.00$33.00$100$1.00
670E00500 SLOPE EROSION PROTECTION2,680 SY$4.75$2.25$4.95$2.25$1.95
602E20000 CONCRETE MASONRY3.46 CY$995$3,200$3,380$2,100$3,050
611E04600 12" CONDUIT, TYPE C25 FT$89.20$85.00$70.45$135$180
611E07400 18" CONDUIT, TYPE B110 FT$115$104$92.95$135$250
611E99574 MANHOLE, NO. 31 EACH$3,220$3,300$4,496$3,700$4,700
611E99654 MANHOLE ADJUSTED TO GRADE Section 3 - DRAINAGE - Totals Awd $42,796.20 2 $45,662.00 3 $44,919.55 4 $51,791.00 5 $95,803.001 EACH$1,750$325$1,903$600$1,550
254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5"249 SY$42.25$19.00$19.90$50.00$50.00
304E20000 AGGREGATE BASE71 CY$86.15$95.00$99.00$145$180
407E20000 NON-TRACKING TACK COAT87 GAL$31.55$12.00$13.20$10.00$10.00
442E22120 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A (14 CY$788$554$579$1,460$1,460
452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P28 SY$115$105$127$125$135
452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P85 SY$126$11.00$123$125$130
609E12000 COMBINATION CURB AND GUTTER, TYPE 2200 FT$53.00$60.00$63.85$88.00$78.50
638E10501 FIRE HYDRANT REMOVED AND RESET, AS PER PLAN Section 5 - WATER WORK - Totals Awd $1,125.00 2 $4,900.00 3 $2,660.00 4 $3,300.00 5 $2,600.001 EACH$1,125$4,900$2,660$3,300$2,600
630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST145.5 FT$18.95$20.00$19.80$23.90$17.00
630E08600 SIGN POST REFLECTOR8 EACH$47.26$64.00$49.50$125$45.00
630E79000 SIGN HANGER ASSEMBLY, SPAN WIRE13 EACH$302$298$317$160$500
630E79501 SIGN SUPPORT ASSEMBLY, POLE MOUNTED, AS PER PLAN14 EACH$242$373$253$135$395
630E80100 SIGN, FLAT SHEET160.25 SF$26.26$20.00$27.60$30.00$26.00
630E80500 SIGN, DOUBLE FACED, STREET NAME4 EACH$121$271$127$275$210
630E85000 REMOVAL OF GROUND MOUNTED SIGN AND STORAGE4 EACH$21.20$22.00$22.00$110$35.00
630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION4 EACH$26.26$71.00$27.50$220$65.00
630E86006 REMOVAL OF GROUND MOUNTED POST SUPPORT AND STORAGE5 EACH$31.55$30.00$33.00$110$50.00
630E86010 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT2 EACH$36.76$122$38.50$220$125
644E00104 EDGE LINE, 6"0.07 MILE$11,191$11,200$11,725$8,755$10,658
644E00300 CENTER LINE0.4 MILE$10,501$10,500$11,000$10,175$10,000
644E00404 CHANNELIZING LINE, 12"350 FT$2.16$2.00$2.20$2.25$2.00
644E00500 STOP LINE49 FT$8.46$8.00$8.80$5.25$8.00
644E00630 CROSSWALK LINE, 24"290 FT$8.45$8.00$8.80$5.20$8.00
644E00700 TRANSVERSE/DIAGONAL LINE, YELLOW155 FT$8.45$8.00$8.80$5.00$8.00
644E00720 CHEVRON MARKING, WHITE115 FT$8.45$8.00$8.80$5.00$8.00
644E01300 LANE ARROW5 EACH$158$158$165$175$150
644E30000 REMOVAL OF PAVEMENT MARKING460 FT$5.50$5.25$5.50$5.05$5.00
644E30020 REMOVAL OF PAVEMENT MARKING Section 6 - TRAFFIC CONTROL - Totals Awd $30,081.35 2 $31,650.00 3 $31,343.75 4 $29,248.55 5 $34,438.062 EACH$158$158$165$400$150
625E00450 CONNECTION, FUSED PULL APART2 EACH$89.26$89.00$203$175$150
625E00460 CONNECTION, UNFUSED PULL APART2 EACH$72.46$73.00$201$170$150
625E18400 BRACKET ARM, 20'2 EACH$1,122$1,125$1,372$1,010$2,000
625E23306 NO. 10 AWG 600 VOLT DISTRIBUTION CABLE1,320 FT$0.80$0.80$2.55$3.15$2.00
625E23400 NO. 10 AWG POLE AND BRACKET CABLE360 FT$0.63$0.60$2.50$1.10$3.25
625E25408 CONDUIT, 2", 725.051780 FT$1.25$1.25$6.70$12.90$11.25
625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 4"49 FT$57.76$58.00$179$152$100
625E26252 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), TYPE I2 EACH$624$626$680$660$500
625E29000 TRENCH780 FT$17.35$17.00$14.05$14.00$12.00
625E30700 PULL BOX, 725.08, 18"2 EACH$866$868$1,067$2,050$1,300
625E31510 PULL BOX REMOVED7 EACH$788$789$437$250$450
625E32000 GROUND ROD11 EACH$142$142$286$350$290
625E36010 UNDERGROUND WARNING MARKING TAPE780 FT$1.45$1.40$1.75$1.30$3.00
632E05006 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS,10 EACH$754$755$1,252$970$1,150
632E05064 VEHICULAR SIGNAL HEAD, (LED), 4-SECTION, 12" LENS,4 EACH$1,024$1,026$1,426$1,070$1,300
632E05086 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS,1 EACH$1,408$1,400$1,997$1,635$1,900
632E20731 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN,8 EACH$455$455$813$568$800
632E20751 ACCESSIBLE PEDESTRIAN PUSHBUTTON, AS PER PLAN8 EACH$1,415$1,420$1,242$1,300$1,250
632E25000 COVERING OF VEHICULAR SIGNAL HEAD14 EACH$47.26$47.00$93.80$10.00$38.00
632E25010 COVERING OF PEDESTRIAN SIGNAL HEAD8 EACH$47.26$47.00$93.80$5.00$32.00
632E30200 MESSENGER WIRE, 7 STRAND, 3/8" DIAMETER WITH ACCES410 FT$9.90$10.00$13.60$14.65$20.00
632E40300 SIGNAL CABLE, 3 CONDUCTOR, NO. 14 AWG200 FT$0.72$0.75$2.50$3.35$2.50
632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG3,200 FT$1.15$1.15$3.05$3.57$3.00
632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG2,120 FT$1.50$1.50$3.70$3.90$3.75
632E64000 STRAIN POLE FOUNDATION3 EACH$2,363$2,400$7,773$10,555$9,000
632E64020 PEDESTAL FOUNDATION8 EACH$788$790$1,312$1,610$1,500
632E67300 POWER CABLE, 3 CONDUCTOR, NO. 8 AWG60 FT$2.95$2.90$4.05$6.25$5.00
632E86130 STRAIN POLE, TYPE TC-81.11, DESIGN 101 EACH$13,908$13,950$13,408$12,740$12,000
632E89802 PEDESTAL, 5', TRANSFORMER BASE1 EACH$498$500$938$1,010$1,000
632E89904 PEDESTAL, 10', TRANSFORMER BASE5 EACH$612$613$1,147$1,090$1,000
632E90008 PEDESTAL, 15', TRANSFORMER BASE2 EACH$796$800$2,780$1,220$2,000
632E90100 REMOVAL OF TRAFFIC SIGNAL INSTALLATION1 EACH$6,300$6,300$7,458$7,040$6,000
632E90104 REUSE OF TRAFFIC CONTROL ITEM: PULL BOX1 EACH$788$790$746$490$275
632E90208 REUSE OF STRAIN POLE1 EACH$788$790$1,645$2,420$825
809E69123 ATC CONTROLLER, AS PER PLAN1 EACH$6,826$6,840$6,542$7,385$5,500
809E69200 EMERGENCY VEHICLE PREEMPTION1 EACH$995$1,000$1,880$850$1,200
809E69210 PREEMPT RECEIVING UNIT1 EACH$3,334$3,350$3,091$805$800
809E69220 PREEMPT DETECTOR CABLE700 FT$1.60$1.50$4.00$3.95$5.00
809E69230 PREEMPT PHASE SELECTOR1 EACH$5,453$5,470$1,480$2,455$6,000
809E69240 PREEMPT CONFIRMATION LIGHT Section 7 - TRAFFIC SIGNALS - Totals Awd $257,513.46 2 $257,635.00 3 $313,453.65 4 $312,680.50 5 $295,513.001 EACH$1,144$1,150$1,143$2,855$750
614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST Section 8 - MAINTENANCE OF TRAFFIC - Totals Awd $2,232.50 2 $2,500.00 3 $2,475.00 4 $3,000.00 5 $2,500.0025 HOUR$89.30$100$99.00$120$100

Project details

Description
MOT-Trotwood Olive Rd Walks SA22
Type of work
Safety

How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →