SCI-SR 125-06.26
SCI County · est $1.8M
Bid dateThursday, March 12—
Awarded toCOMPLETE GENERAL CONSTRUCTION COMPANY$1.97M
SCI County · est $1.8M
Bid form · ODOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 515E12070 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 9 EACH | $25,500 | $230k | 12% |
| 511E44112 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT NOT INCLUD | 155 CY | $1,250 | $194k | 10% |
| 202E11002 STRUCTURE REMOVED, OVER 20 FOOT SPAN | 1 LS | $145,000 | $145k | 7% |
| 526E30010 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 240 SY | $480 | $115k | 6% |
| 511E31613 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, AS | 66 CY | $1,650 | $109k | 6% |
| 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING | 169 CY | $600 | $101k | 5% |
| 507E00301 STEEL PILES HP14X73, FURNISHED, AS PER PLAN | 880 FT | $110 | $97k | 5% |
| 624E10000 MOBILIZATION Section 8 - INCIDENTALS - Totals Awd $203,000.00 2 $162,600.00 3 $237,830.00 4 $208,500.00 5 $236,595.76 6 $228,800.00 7 $191,500.00 | 1 LS | $90,000 | $90k | 5% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 34,641 LB | $1.88 | $65k | 3% |
| 517E70100 RAILING (THREE STEEL TUBE BRIDGE RAILING) | 148 FT | $426 | $63k | 3% |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 64 more items below.
| Item | Quantity | R1Complete General Construction Company | R2R C Construction Company And Son INC | R3George J Igel & CO INC | R4Double Z Construction Company | R5Sunesis Construction CO | R6Axis Civil Construction LLC | R7D G M INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 515E12070 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 9 EACH | $25,500 | $24,000 | $28,350 | $30,700 | $26,220 | $25,500 | $30,300 | 14% |
| 511E44112 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT NOT INCLUD | 155 CY | $1,250 | $1,000 | $795 | $995 | $1,034 | $930 | $875 | 12% |
| 202E11002 STRUCTURE REMOVED, OVER 20 FOOT SPAN | 1 LS | $145,000 | $30,000 | $140,000 | $95,000 | $72,400 | $140,000 | $150,000 | 9% |
| 526E30010 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 240 SY | $480 | $275 | $500 | $475 | $486 | $540 | $400 | 7% |
| 511E31613 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, AS | 66 CY | $1,650 | $1,750 | $1,600 | $1,600 | $1,778 | $1,650 | $2,350 | 7% |
| 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING | 169 CY | $600 | $1,000 | $655 | $525 | $639 | $780 | $675 | 6% |
| 507E00301 STEEL PILES HP14X73, FURNISHED, AS PER PLAN | 880 FT | $110 | $110 | $73.00 | $70.00 | $80.77 | $74.00 | $70.00 | 6% |
| 624E10000 MOBILIZATION Section 8 - INCIDENTALS - Totals Awd $203,000.00 2 $162,600.00 3 $237,830.00 4 $208,500.00 5 $236,595.76 6 $228,800.00 7 $191,500.00 | 1 LS | $90,000 | $55,000 | $100,000 | $100,000 | $81,067 | $95,000 | $40,000 | 6% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 34,641 LB | $1.88 | $3.00 | $1.75 | $1.75 | $2.02 | $2.65 | $1.50 | 4% |
| 517E70100 RAILING (THREE STEEL TUBE BRIDGE RAILING) | 148 FT | $426 | $435 | $445 | $426 | $426 | $426 | $450 | 4% |
| 503E21320 UNCLASSIFIED EXCAVATION, INCLUDING ROCK | 1 LS | $60,000 | $25,000 | $56,250 | $73,000 | $92,981 | $28,000 | $50,000 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $60,000 | $45,000 | $92,000 | $64,000 | $72,448 | $75,000 | $85,000 | 4% |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $40,000 | $100,000 | $50,000 | $140,000 | $89,295 | $90,000 | $200,000 | 2% |
| 507E92201 PREBORED HOLES, AS PER PLAN | 484 FT | $80.00 | $300 | $310 | $260 | $429 | $390 | $286 | 2% |
| 516E44100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 36 EACH | $1,075 | $1,100 | $700 | $800 | $794 | $1,360 | $600 | 2% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 97 CY | $365 | $370 | $365 | $545 | $545 | $390 | $570 | 2% |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $35,000 | $25,000 | $17,500 | $25,000 | $11,999 | $8,500 | $25,000 | 2% |
| 203E20000 EMBANKMENT | 812 CY | $37.00 | $35.00 | $47.00 | $35.00 | $16.82 | $42.00 | $30.00 | 2% |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 211 SY | $142 | $150 | $90.00 | $120 | $93.47 | $100 | $200 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $27,000 | $20,000 | $33,750 | $8,000 | $15,000 | $10,000 | $50,000 | 2% |
| Item | Quantity | R1Complete General Construction Company | R2R C Construction Company And Son INC | R3George J Igel & CO INC | R4Double Z Construction Company | R5Sunesis Construction CO | R6Axis Civil Construction LLC | R7D G M INC |
|---|---|---|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 781 SY | $28.00 | $25.00 | $18.00 | $25.00 | $11.95 | $14.00 | $12.00 |
| 202E38000 GUARDRAIL REMOVED | 374 FT | $3.00 | $5.00 | $7.00 | $6.00 | $1.65 | $6.00 | $1.00 |
| 203E10000 EXCAVATION | 106 CY | $35.00 | $25.00 | $27.00 | $50.00 | $7.56 | $32.00 | $35.00 |
| 204E10000 SUBGRADE COMPACTION | 1,002 SY | $4.00 | $2.00 | $5.25 | $8.00 | $3.02 | $3.50 | $6.00 |
| 204E45000 PROOF ROLLING | 1 HOUR | $130 | $100 | $112 | $200 | $386 | $250 | $75.00 |
| 606E15050 GUARDRAIL, TYPE MGS | 87.5 FT | $43.00 | $45.00 | $32.00 | $42.80 | $42.80 | $42.80 | $50.00 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 62.5 FT | $46.00 | $48.00 | $35.00 | $45.98 | $45.98 | $46.00 | $55.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 3 EACH | $2,380 | $2,450 | $2,700 | $2,380 | $2,380 | $2,380 | $2,400 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $1,100 | $1,300 | $1,400 | $1,100 | $1,100 | $1,100 | $1,150 |
| 606E34600 MGS BRIDGE TERMINAL ASSEMBLY, TYPE TST-2 | 4 EACH | $2,340 | $2,500 | $2,800 | $2,340 | $2,340 | $2,340 | $2,400 |
| 623E12010 PRIMARY PROJECT CONTROL MONUMENT, TYPE B | 3 EACH | $1,500 | $1,000 | $2,000 | $450 | $1,240 | $1,500 | $1,000 |
| 623E38500 MONUMENT ASSEMBLY, TYPE C | 2 EACH | $1,800 | $1,000 | $1,100 | $1,200 | $2,537 | $2,800 | $1,250 |
| 623E40520 RIGHT-OF-WAY MONUMENT, TYPE B Section 1 - ROADWAY - Totals Awd $123,719.50 2 $113,556.50 3 $135,192.00 4 $104,573.75 5 $93,201.06 6 $103,651.00 7 $133,565.50 | 14 EACH | $250 | $600 | $320 | $350 | $1,240 | $350 | $600 |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 199 CY | $115 | $100 | $90.00 | $100 | $121 | $140 | $110 |
| 659E10000 SEEDING AND MULCHING | 1,670 SY | $1.93 | $10.00 | $4.15 | $6.00 | $4.17 | $2.00 | $4.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 84 SY | $1.93 | $0.20 | $1.93 | $1.93 | $7.60 | $2.00 | $0.05 |
| 659E20000 COMMERCIAL FERTILIZER | 0.23 TON | $1,250 | $2,900 | $1,250 | $1,250 | $500 | $1,250 | $1,500 |
| 659E31000 LIME | 0.35 ACRE | $150 | $2,200 | $150 | $150 | $100 | $150 | $300 |
| 659E35000 WATER | 9 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $32,984.22 2 $44,427.80 3 $31,716.62 4 $36,796.12 5 $38,215.25 6 $38,082.00 7 $35,398.20 | 6,365 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS Section 3 - DRAINAGE - Totals Awd $1,769.00 2 $1,525.00 3 $3,660.00 4 $1,525.00 5 $2,060.58 6 $1,464.00 7 $1,830.00 | 61 FT | $29.00 | $25.00 | $60.00 | $25.00 | $33.78 | $24.00 | $30.00 |
| 304E20000 AGGREGATE BASE | 162 CY | $135 | $150 | $110 | $100 | $113 | $135 | $110 |
| 407E20000 NON-TRACKING TACK COAT | 76 GAL | $4.10 | $10.00 | $4.10 | $4.50 | $4.50 | $7.00 | $4.50 |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 24 CY | $580 | $590 | $580 | $695 | $695 | $450 | $725 |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 Section 4 - PAVEMENT - Totals Awd $84,046.60 2 $87,815.00 3 $79,996.60 4 $106,712.00 5 $108,751.58 6 $84,892.00 7 $112,632.00 | 449 (33 CY | $380 | $385 | $380 | $625 | $625 | $420 | $660 |
| 626E00112 BARRIER REFLECTOR, TYPE 3 (BI-DIRECTIONAL) | 10 EACH | $10.00 | $10.00 | $14.00 | $10.00 | $13.98 | $10.00 | $12.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 51 FT | $12.00 | $30.00 | $18.00 | $12.00 | $12.00 | $12.00 | $20.00 |
| 630E08600 SIGN POST REFLECTOR | 1 EACH | $26.00 | $250 | $75.00 | $26.00 | $26.00 | $26.00 | $75.00 |
| 630E80100 SIGN, FLAT SHEET | 6.3 SF | $35.00 | $45.00 | $20.00 | $35.00 | $35.00 | $35.00 | $30.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 1 EACH | $10.00 | $100 | $40.00 | $10.00 | $10.00 | $10.00 | $50.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 4 EACH | $60.00 | $250 | $75.00 | $60.00 | $60.00 | $60.00 | $100 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 4 EACH | $15.00 | $100 | $45.00 | $15.00 | $15.00 | $15.00 | $50.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 (WHITE) | 0.23 MILE | $4,500 | $10,000 | $9,900 | $4,500 | $9,900 | $9,900 | $10,000 |
| 642E00300 CENTER LINE, TYPE 1 (DOUBLE SOLID) | 0.11 MILE | $4,500 | $18,500 | $13,200 | $4,500 | $13,200 | $13,200 | $15,000 |
| 642E00500 STOP LINE, TYPE 1 Section 5 - TRAFFIC CONTROL - Totals Awd $2,958.50 2 $8,398.50 3 $5,658.00 4 $2,958.50 5 $5,187.30 6 $5,147.50 7 $6,244.00 | 20 FT | $8.00 | $20.00 | $7.50 | $8.00 | $7.50 | $7.50 | $12.00 |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,000 | $3,000 | $2,200 | $1,989 | $2,200 | $2,450 | $1,500 |
| 614E13310 BARRIER REFLECTOR, TYPE 1(BI-DIRECTIONAL) | 21 EACH | $40.00 | $20.00 | $17.00 | $20.00 | $13.39 | $16.00 | $55.00 |
| 614E13314 BARRIER REFLECTOR, TYPE 3 (BI-DIRECTIONAL) | 3 EACH | $40.00 | $20.00 | $21.00 | $20.00 | $13.39 | $40.00 | $50.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 23 EACH | $20.00 | $50.00 | $20.00 | $20.00 | $19.88 | $35.00 | $50.00 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 0.56 MILE | $3,500 | $10,000 | $9,385 | $3,500 | $9,385 | $9,385 | $10,000 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 44 FT | $8.00 | $100 | $20.00 | $8.00 | $20.00 | $20.00 | $20.00 |
| 616E10000 WATER | 7 MGAL | $160 | $1.00 | $52.05 | $40.00 | $23.77 | $1.00 | $1.00 |
| 622E41100 PORTABLE BARRIER, UNANCHORED Section 6 - MAINTENANCE OF TRAFFIC - Totals Awd $108,572.50 2 $115,187.00 3 $96,639.95 4 $88,491.71 5 $84,423.32 6 $74,873.60 7 $119,942.00 | 740 FT | $33.60 | $35.00 | $50.50 | $28.00 | $40.84 | $28.00 | $45.00 |
| 202E22900 APPROACH SLAB REMOVED | 107 SY | $60.00 | $25.00 | $65.00 | $58.00 | $56.08 | $120 | $35.00 |
| 202E23500 WEARING COURSE REMOVED | 364 SY | $35.00 | $30.00 | $15.00 | $15.00 | $7.61 | $11.00 | $8.00 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 176 SY | $36.00 | $50.00 | $36.00 | $37.00 | $40.49 | $36.00 | $45.00 |
| 512E33000 TYPE 2 WATERPROOFING | 31 SY | $50.00 | $35.00 | $33.00 | $40.00 | $131 | $45.00 | $40.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 122 SF | $12.00 | $25.00 | $10.05 | $20.00 | $6.04 | $5.00 | $15.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 34 SF | $14.00 | $35.00 | $11.00 | $22.00 | $8.00 | $12.00 | $30.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 92 FT | $46.00 | $100 | $45.00 | $40.00 | $50.34 | $46.00 | $50.00 |
| 516E41100 1/8" PREFORMED BEARING PAD, TYPE CDP | 18 EACH | $90.00 | $25.00 | $120 | $50.00 | $106 | $80.00 | $50.00 |
| 518E20000 PREFABRICATED GEOCOMPOSITE DRAIN | 42 SY | $42.00 | $20.00 | $35.00 | $60.00 | $32.11 | $45.00 | $40.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 93 CY | $135 | $150 | $150 | $140 | $111 | $120 | $130 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 126 FT | $28.00 | $50.00 | $22.00 | $25.00 | $16.96 | $31.00 | $25.00 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 190 FT | $10.00 | $25.00 | $9.00 | $10.00 | $4.32 | $15.00 | $20.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 60 FT | $28.00 | $25.00 | $35.00 | $20.00 | $21.21 | $15.00 | $30.00 |
| 526E90010 TYPE A INSTALLATION | 77 FT | $260 | $200 | $260 | $230 | $241 | $450 | $275 |
| 613E41300 LOW STRENGTH MORTAR BACKFILL (TYPE 2) | 110 CY | $175 | $175 | $248 | $190 | $233 | $220 | $180 |
| 625E33000 STRUCTURE GROUNDING SYSTEM Section 7 - STRUCTURE OVER 20 FOOT SPAN (SCI-125-062 - Totals Awd $1,408,678.08 2 $1,445,763.00 3 $1,433,709.85 4 $1,484,197.75 5 $1,528,901.15 6 $1,591,477.65 7 $1,616,347.50 | 1 EACH | $17,000 | $20,000 | $9,852 | $9,852 | $8,536 | $21,000 | $15,000 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $13,000 | $47,000 | $10,000 | $12,000 | $11,671 | $18,000 | $50,000 |
| 619E16000 FIELD OFFICE, TYPE A | 6 MNTH | $2,600 | $100 | $1,605 | $2,000 | $1,585 | $3,200 | $750 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $20,000 | $12,000 | $17,000 | $19,500 | $59,900 | $20,000 | $10,000 |
| 623E50000 PRECONSTRUCTION SURVEY MONUMENT VERIFICATION AND R | 1 LS | $2,200 | $1,500 | $3,600 | $500 | $1,000 | $800 | $1,000 |
| 623E51000 POST CONSTRUCTION SURVEY MONUMENT VERIFICATION AND | 1 LS | $2,200 | $1,500 | $5,600 | $500 | $1,000 | $800 | $1,000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →