| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 42,042 SF | $13.25 | $557k | 24% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $310,000 | $310k | 14% |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 42,042 SF | $5.5 | $231k | 10% |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 1,155 SF | $168 | $194k | 9% |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 42,042 SF | $3.3 | $139k | 6% |
| 624E10000 MOBILIZATION Section 9 - INCIDENTALS - Totals Awd $425,400.00 2 $285,000.00 | 1 LS | $100,000 | $100k | 4% |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 42,042 SF | $2.25 | $95k | 4% |
| 512E10001 SEALING OF CONCRETE SURFACES, AS PER PLAN (PERMANE | 1,321 SY | $60 | $79k | 3% |
| 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE | 1,587 SY | $35 | $56k | 2% |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 1,789 SY | $24 | $43k | 2% |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 53 more items below.
| Item | Quantity | R1Prus Construction Company | R2Vimas Painting Company INC | % of bid |
|---|---|---|---|---|
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 42,042 SF | $13.25 | $13.00 | 27% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $310,000 | $140,000 | 15% |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 42,042 SF | $5.50 | $4.00 | 11% |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 1,155 SF | $168 | $180 | 9% |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 42,042 SF | $3.30 | $4.00 | 7% |
| 624E10000 MOBILIZATION Section 9 - INCIDENTALS - Totals Awd $425,400.00 2 $285,000.00 | 1 LS | $100,000 | $100,000 | 5% |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 42,042 SF | $2.25 | $4.00 | 5% |
| 512E10001 SEALING OF CONCRETE SURFACES, AS PER PLAN (PERMANE | 1,321 SY | $60.00 | $62.00 | 4% |
| 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE | 1,587 SY | $35.00 | $36.00 | 3% |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 1,789 SY | $24.00 | $26.00 | 2% |
| 611E99114 INLET, NO. 3 FOR SINGLE SLOPE BARRIER, TYPE D Section 3 - DRAINAGE - Totals Awd $51,250.00 2 $56,150.00 | 2 EACH | $18,550 | $20,000 | 2% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST Section 7 - MAINTENANCE OF TRAFFIC - Totals Awd $67,902.00 2 $61,580.00 | 250 HOUR | $132 | $110 | 2% |
| 804E15030 FIBER OPTIC CABLE, 72 FIBER | 3,560 FT | $9.00 | $9.00 | 2% |
| 809E24500 CONDUIT, 4", MULTICELL, HDPE WITH 4 - 1? INNERDUCT | 520 FT | $55.00 | $55.00 | 1% |
| 607E98000 FENCE, MISC.: VANDAL PROTECTION FENCE REBUILT | 1,029 FT | $27.50 | $94.00 | 1% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 660 FT | $41.00 | $40.00 | 1% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $18,000 | $22,000 | 1% |
| 516E01300 ELASTOMERIC STRIP SEAL WITHOUT STEEL EXTRUSIONS | 100 FT | $180 | $200 | 1% |
| 518E43300 6" PIPE DOWNSPOUT, INCLUDING SPECIALS Section 8 - STRUCTURE REPAIR (HAM-71-0505 SFN 311460 - Totals Awd $1,557,248.10 2 $1,708,319.00 | 55 FT | $322 | $400 | 1% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $15,250 | $20,000 | 1% |
| Item | Quantity | R1Prus Construction Company | R2Vimas Painting Company INC |
|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 18 SY | $90.00 | $100 |
| 202E32000 CURB REMOVED | 79 FT | $25.00 | $30.00 |
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 25 FT | $68.00 | $72.00 |
| 202E38000 GUARDRAIL REMOVED | 262.5 FT | $10.00 | $3.00 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 1 EACH | $138 | $200 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 1 EACH | $110 | $200 |
| 202E58100 CATCH BASIN REMOVED | 2 EACH | $720 | $800 |
| 203E10000 EXCAVATION | 80 CY | $75.50 | $80.00 |
| 204E10000 SUBGRADE COMPACTION | 42 SY | $8.50 | $10.00 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $3,500 | $4,300 |
| 606E15050 GUARDRAIL, TYPE MGS | 237.5 FT | $34.15 | $24.00 |
| 606E17500 POST END ANCHOR (OR CONCRETE BLOCK END ANCHOR) | 1 EACH | $348 | $3,000 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $1,375 | $2,000 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 1 EACH | $2,695 | $4,000 |
| 606E98000 GUARDRAIL, MISC.: MGS GUARDRAIL, BURIED IN BACKSLO Section 1 - ROADWAY - Totals Awd $53,857.25 2 $59,166.98 | 124.04 FT | $53.00 | $37.00 |
| 659E00300 TOPSOIL | 134 CY | $87.00 | $50.00 |
| 659E10000 SEEDING AND MULCHING | 1,210 SY | $4.75 | $5.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 61 SY | $3.85 | $5.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.16 TON | $1,100 | $1,000 |
| 659E31000 LIME | 0.25 ACRE | $68.00 | $100 |
| 659E35000 WATER | 6.7 MGAL | $1.10 | $100 |
| 832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $22,840.72 2 $18,910.00 | 5,000 EACH | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 5 CY | $705 | $800 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 30 FT | $50.00 | $55.00 |
| 611E05900 15" CONDUIT, TYPE B | 25 FT | $365 | $420 |
| 304E20000 AGGREGATE BASE, 6" | 9.5 CY | $175 | $200 |
| 452E14050 10" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS Section 4 - PAVEMENT - Totals Awd $10,587.50 2 $12,400.00 | 35 SY | $255 | $300 |
| 626E00102 BARRIER REFLECTOR, TYPE 1 (ONE-WAY) | 3 EACH | $16.50 | $12.00 |
| 626E00116 BARRIER REFLECTOR, TYPE 5 (ONE-WAY) | 16 EACH | $15.50 | $17.00 |
| 642E00200 LANE LINE, 4", TYPE 1 | 0.12 MILE | $7,150 | $7,000 |
| 642E00300 CENTER LINE, TYPE 1 Section 5 - TRAFFIC CONTROL - Totals Awd $1,584.50 2 $1,568.00 | 0.06 MILE | $7,150 | $7,000 |
| 625E29011 TRENCH, 30" DEEP, AS PER PLAN | 520 FT | $18.15 | $18.00 |
| 625E31600 PULL BOX, MISC.: REUSE EXISTING PULL BOX | 9 EACH | $1,100 | $1,200 |
| 625E36010 UNDERGROUND WARNING MARKING TAPE | 520 FT | $1.95 | $2.00 |
| 809E01900 ITS PULL BOX WITH PAD AND STANDARD LID ASSEMBLY, 3 | 1 EACH | $3,905 | $4,000 |
| 809E10000 TRACER WIRE | 520 FT | $2.25 | $3.00 |
| 809E70000 MAINTAINING ITS DURING CONSTRUCTION Section 6 - TRAFFIC SURVEILLANCE - Totals Awd $86,068.10 2 $89,900.00 | 1 LS | $1.10 | $2,500 |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,465 | $2,400 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (BI-DIRECTIONAL) | 12 EACH | $13.50 | $15.00 |
| 614E13350 OBJECT MARKER, ONE WAY (BI-DIRECTIONAL) | 12 EACH | $23.75 | $25.00 |
| 202E32800 CONCRETE SLOPE PROTECTION REMOVED | 40 SY | $55.00 | $65.00 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 468 SY | $18.00 | $20.00 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 5 MNHR | $220 | $250 |
| 514E10000 FINAL INSPECTION REPAIR | 10 EACH | $220 | $400 |
| 516E12310 SIDEWALK COVER PLATE | 997 LB | $15.00 | $25.00 |
| 519E00100 SPECIAL - COMPOSITE FIBER WRAP SYSTEM (PROPOSAL NO | 112 SF | $65.00 | $70.00 |
| 601E21000 CONCRETE SLOPE PROTECTION | 40 SY | $150 | $180 |
| 622E25001 CONCRETE BARRIER END SECTION, TYPE D, AS PER PLAN | 1 EACH | $12,450 | $15,000 |
| 622E25051 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE | 1 EACH | $8,800 | $10,000 |
| 690E98600 SPECIAL - MISC.: DRAINAGE SYSTEM CLEANING, 36" AND | 10 HOUR | $450 | $500 |
| 844E20000 GALVANIC ANODE PROTECTION | 199 EACH | $70.00 | $80.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $8,900 | $40,000 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $6,500 | $5,000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →