BID #260188 · ODOTRESULT · awarded Apr 9

ASD-SR 60-14.97

ASD County · est $0.4M

Bid dateThursday, April 9
Awarded toADENA CORPORATION$389,830.31
read → connected → answeredcassandri

Project scope

Bid form · ODOT

49ITEMS
  • Drainage18%
  • Erosion & Landscaping16%
  • Earthwork12%
  • Mobilization & General10%
  • Maintaining Traffic10%
  • Structures / Bridge8%
  • Other24%

Top items by winning bid

ItemQtyUnit priceExtended%
611E53500 63" X 98" CONDUIT, TYPE A, 706.04112 FT$1,262$141k36%
442E22001 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 Section 4 - PAVEMENT - Totals Awd $74,499.29 2 $75,450.66 3 $65,703.51 4 $77,198.87 5 $72,129.0042 CY$681.68$29k7%
301E56000 ASPHALT CONCRETE BASE, PG64-22, (449)82 CY$325.79$27k7%
203E20000 EMBANKMENT773 CY$25.48$20k5%
602E20000 CONCRETE MASONRY Section 7 - STRUCTURE 20 FOOT SPAN AND UNDER (ASD-60 - Totals Awd $30,429.70 2 $20,318.57 3 $20,961.51 4 $28,231.26 5 $33,013.005.27 CY$3,236$17k4%
202E11001 STRUCTURE REMOVED, AS PER PLAN1 LS$14,589$15k4%
624E10000 MOBILIZATION Section 8 - INCIDENTALS - Totals Awd $36,438.80 2 $45,263.44 3 $52,700.00 4 $58,424.92 5 $50,900.001 LS$13,425$13k3%
503E11100 COFFERDAMS AND EXCAVATION BRACING1 LS$13,375$13k3%
304E20000 AGGREGATE BASE111 CY$99.57$11k3%
614E11000 MAINTAINING TRAFFIC1 LS$9,881$10k3%

Per-bidder unit pricing

ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 29 more items below.

Rank 1Adena Corporation$390kRank 2Eius Company$410kRank 3Brennstuhl Construction INC$426kRank 4Eclipse CO LLC$448kRank 5Rietschlin Construction INC$468k
ItemQuantityR1Adena CorporationR2Eius CompanyR3Brennstuhl Construction INCR4Eclipse CO LLCR5Rietschlin Construction INC
611E53500 63" X 98" CONDUIT, TYPE A, 706.04112 FT$1,262$1,098$1,140$1,016$1,350
442E22001 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 Section 4 - PAVEMENT - Totals Awd $74,499.29 2 $75,450.66 3 $65,703.51 4 $77,198.87 5 $72,129.0042 CY$682$578$416$543$594
301E56000 ASPHALT CONCRETE BASE, PG64-22, (449)82 CY$326$315$311$422$324
203E20000 EMBANKMENT773 CY$25.48$39.39$39.10$30.50$20.00
602E20000 CONCRETE MASONRY Section 7 - STRUCTURE 20 FOOT SPAN AND UNDER (ASD-60 - Totals Awd $30,429.70 2 $20,318.57 3 $20,961.51 4 $28,231.26 5 $33,013.005.27 CY$3,236$3,172$1,650$2,304$1,900
202E11001 STRUCTURE REMOVED, AS PER PLAN1 LS$14,589$5,160$6,706$10,112$47,100
624E10000 MOBILIZATION Section 8 - INCIDENTALS - Totals Awd $36,438.80 2 $45,263.44 3 $52,700.00 4 $58,424.92 5 $50,900.001 LS$13,425$12,999$11,070$34,176$30,000
503E11100 COFFERDAMS AND EXCAVATION BRACING1 LS$13,375$3,602$12,264$16,088$23,000
304E20000 AGGREGATE BASE111 CY$99.57$154$133$109$113
614E11000 MAINTAINING TRAFFIC1 LS$9,881$2,271$6,706$5,676$500
601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER60 CY$132$227$153$159$162
611E99574 MANHOLE, NO. 3 Section 3 - DRAINAGE - Totals Awd $160,157.84 2 $165,822.22 3 $153,924.18 4 $146,211.15 5 $180,420.002 EACH$3,509$7,480$3,265$5,739$4,900
201E11000 CLEARING AND GRUBBING1 LS$6,299$3,480$26,802$32,500$8,000
611E07600 18" CONDUIT, TYPE C110 FT$55.36$139$91.41$88.35$100
614E12420 DETOUR SIGNING1 LS$5,877$6,500$5,225$7,772$5,200
103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM1 LS$5,531$5,063$6,394$6,454$7,000
832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $26,276.53 2 $42,681.17 3 $45,560.55 4 $36,738.56 5 $33,303.605,000 EACH$1.00$1.00$1.00$1.00$1.00
254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (VARIES 0" TO 3160 SY$30.93$26.25$18.22$11.13$27.00
623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING1 LS$4,603$3,180$13,530$3,622$5,000
601E11000 RIPRAP, TYPE D16 SY$287$724$174$478$310
Show all 49 line items
ItemQuantityR1Adena CorporationR2Eius CompanyR3Brennstuhl Construction INCR4Eclipse CO LLCR5Rietschlin Construction INC
202E23000 PAVEMENT REMOVED327 SY$8.07$6.58$10.26$23.70$15.00
202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER48 FT$4.02$6.45$69.85$75.69$53.00
202E75000 FENCE REMOVED55 FT$7.01$5.16$15.24$12.14$30.00
203E10000 EXCAVATION51 CY$18.92$12.90$32.88$10.74$65.00
204E10000 SUBGRADE COMPACTION395 SY$3.90$2.58$2.83$2.08$5.00
623E38500 MONUMENT ASSEMBLY, TYPE C2 EACH$1,886$1,994$605$1,018$1,525
623E50000 PRECONSTRUCTION SURVEY MONUMENT VERIFICATION AND R1 LS$1,151$1,728$1,639$2,300$1,005
623E51000 POST CONSTRUCTION SURVEY MONUMENT VERIFICATION AND Section 1 - ROADWAY - Totals Awd $52,379.22 2 $50,953.53 3 $78,560.15 4 $86,244.32 5 $90,009.001 LS$1,151$1,728$1,639$2,300$1,005
659E00100 SOIL ANALYSIS TEST2 EACH$125$63.00$166$60.00$150
659E00300 TOPSOIL150 CY$23.88$51.86$116$65.00$48.00
659E10000 SEEDING AND MULCHING1,349 SY$2.86$2.52$4.31$2.40$3.00
659E14000 REPAIR SEEDING AND MULCHING67 SY$1.00$2.10$6.82$2.00$3.00
659E15000 INTER-SEEDING67 SY$1.00$0.74$6.82$0.70$3.00
659E20000 COMMERCIAL FERTILIZER0.19 TON$1,810$945$4,629$900$1,300
659E31000 LIME0.28 ACRE$698$50.39$3,220$1.00$100
659E35000 WATER7.46 MGAL$1.00$1.05$67.07$1.00$10.00
670E00520 SLOPE EROSION PROTECTION MAT, TYPE B212 SY$1.72$3.62$8.54$5.00$6.25
605E31100 AGGREGATE DRAINS156 FT$11.82$8.20$21.35$34.62$15.00
611E02000 8" CONDUIT, TYPE C8 FT$55.05$153$88.00$53.25$170
611E04600 12" CONDUIT, TYPE C16 FT$47.32$116$51.61$76.10$120
611E98510 CATCH BASIN, NO. 2-31 EACH$2,628$8,270$4,770$4,199$2,800
304E20000 AGGREGATE BASE (DRIVEWAYS)17 CY$99.56$152$204$121$126
407E10000 TACK COAT70 GAL$7.95$2.63$8.12$24.14$2.70
408E10001 PRIME COAT, AS PER PLAN86 GAL$10.51$15.75$12.00$24.14$16.50
621E54000 RAISED PAVEMENT MARKER REMOVED3 EACH$20.00$20.64$37.26$1,267$48.00
642E00104 EDGE LINE, 6", TYPE 10.08 MILE$12,373$9,975$11,000$9,500$10,800
642E00300 CENTER LINE, TYPE 1 Section 5 - TRAFFIC CONTROL - Totals Awd $1,544.74 2 $1,258.92 3 $1,431.78 4 $4,940.01 5 $1,440.000.04 MILE$12,373$9,975$11,000$9,500$10,800
614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN Section 6 - MAINTENANCE OF TRAFFIC - Totals Awd $8,104.19 2 $8,389.50 3 $7,205.00 4 $10,225.61 5 $7,144.002 SNMT$1,114$945$990$1,227$972
619E16010 FIELD OFFICE, TYPE B6 MNTH$500$3,625$2,500$1,416$1,400

Project details

Description
ASD-SR 60-14.97
Type of work
Drainage

How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →