LAW-SR 7-13.63
LAW County · est $0.2M
Bid dateThursday, March 12—
Awarded toFILLMORE CONSTRUCTION$228,621
LAW County · est $0.2M
Bid form · ODOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E16401 36" CONDUIT, TYPE B, AS PER PLAN 706.01, 707.01, 7 | 90 FT | $1,000 | $90k | 39% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG Section 4 - PAVEMENT - Totals Awd $34,180.00 2 $35,600.00 3 $99,140.00 4 $76,275.00 | 38 CY | $400 | $15k | 7% |
| 624E10000 MOBILIZATION Section 7 - INCIDENTALS - Totals Awd $22,200.00 2 $59,900.00 3 $122,000.00 4 $150,200.00 | 1 LS | $14,500 | $15k | 6% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $10,000 | $10k | 4% |
| 611E98540 CATCH BASIN, NO. 2-4 Section 3 - DRAINAGE - Totals Awd $114,100.00 2 $158,380.00 3 $74,550.00 4 $109,300.00 | 1 EACH | $9,500 | $10k | 4% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC Section 6 - MAINTENANCE OF TRAFFIC - Totals Awd $11,950.00 2 $13,250.00 3 $13,750.00 4 $35,625.00 | 25 CY | $300 | $8k | 3% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 125 FT | $52 | $7k | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T=1.5") | 145 SY | $40 | $6k | 3% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 18 CY | $300 | $5k | 2% |
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 104 FT | $50 | $5k | 2% |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 23 more items below.
| Item | Quantity | R1Fillmore Construction | R2Axis Civil Construction LLC | R3Stanley Miller Construction Company | R4R C Construction Company And Son INC | % of bid |
|---|---|---|---|---|---|---|
| 611E16401 36" CONDUIT, TYPE B, AS PER PLAN 706.01, 707.01, 7 | 90 FT | $1,000 | $1,150 | $595 | $450 | 43% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG Section 4 - PAVEMENT - Totals Awd $34,180.00 2 $35,600.00 3 $99,140.00 4 $76,275.00 | 38 CY | $400 | $400 | $1,250 | $1,000 | 7% |
| 624E10000 MOBILIZATION Section 7 - INCIDENTALS - Totals Awd $22,200.00 2 $59,900.00 3 $122,000.00 4 $150,200.00 | 1 LS | $14,500 | $40,000 | $75,000 | $55,000 | 7% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $10,000 | $34,000 | $2,500 | $35,000 | 5% |
| 611E98540 CATCH BASIN, NO. 2-4 Section 3 - DRAINAGE - Totals Awd $114,100.00 2 $158,380.00 3 $74,550.00 4 $109,300.00 | 1 EACH | $9,500 | $15,000 | $9,000 | $25,000 | 5% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC Section 6 - MAINTENANCE OF TRAFFIC - Totals Awd $11,950.00 2 $13,250.00 3 $13,750.00 4 $35,625.00 | 25 CY | $300 | $330 | $150 | $25.00 | 4% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 125 FT | $52.00 | $38.00 | $50.00 | $65.00 | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T=1.5") | 145 SY | $40.00 | $25.00 | $45.00 | $65.00 | 3% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 18 CY | $300 | $420 | $1,250 | $1,000 | 3% |
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 104 FT | $50.00 | $200 | $100 | $100 | 2% |
| 203E10000 EXCAVATION | 51 CY | $100 | $35.00 | $125 | $25.00 | 2% |
| 832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $9,806.00 2 $8,023.50 3 $13,282.00 4 $11,424.00 | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 253E01000 PAVEMENT REPAIR | 50 SY | $100 | $120 | $300 | $25.00 | 2% |
| 614E12420 DETOUR SIGNING | 1 LS | $4,450 | $5,000 | $10,000 | $35,000 | 2% |
| 202E23000 PAVEMENT REMOVED | 78 SY | $50.00 | $20.00 | $30.00 | $35.00 | 2% |
| 611E04600 12" CONDUIT, TYPE C 706.01, 706.02, OR 707.33 | 12 FT | $300 | $140 | $500 | $400 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,500 | $4,500 | $12,000 | $35,000 | 2% |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 3 CY | $1,000 | $326 | $750 | $750 | 1% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 1 EACH | $2,800 | $2,500 | $3,000 | $3,500 | 1% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $2,500 | $5,500 | $8,000 | $35,000 | 1% |
| Item | Quantity | R1Fillmore Construction | R2Axis Civil Construction LLC | R3Stanley Miller Construction Company | R4R C Construction Company And Son INC |
|---|---|---|---|---|---|
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $1,500 | $3,500 | $1,000 | $20,000 |
| 202E38000 GUARDRAIL REMOVED | 192 FT | $10.00 | $6.00 | $10.00 | $5.00 |
| 202E58100 CATCH BASIN REMOVED | 1 EACH | $500 | $4,200 | $1,000 | $1,500 |
| 203E20000 EMBANKMENT | 2 CY | $1,000 | $120 | $150 | $65.00 |
| 204E10000 SUBGRADE COMPACTION | 85 SY | $10.00 | $4.41 | $5.00 | $2.00 |
| 204E45000 PROOF ROLLING | 1 HOUR | $150 | $250 | $80.00 | $100 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T Section 1 - ROADWAY - Totals Awd $31,920.00 2 $42,311.85 3 $35,590.00 4 $51,390.00 | 1 EACH | $1,500 | $1,200 | $2,500 | $2,500 |
| 659E10000 SEEDING AND MULCHING | 200 SY | $8.50 | $10.00 | $30.00 | $20.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.03 TON | $1,800 | $1,250 | $800 | $2,800 |
| 659E31000 LIME | 0.04 ACRE | $800 | $150 | $150 | $2,200 |
| 659E35000 WATER | 2 MGAL | $10.00 | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 1 CY | $1,000 | $4,200 | $3,500 | $4,000 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 61 FT | $10.00 | $6.00 | $25.00 | $100 |
| 304E20000 AGGREGATE BASE | 14 CY | $100 | $165 | $160 | $195 |
| 407E10000 TACK COAT | 77 GAL | $10.00 | $7.00 | $50.00 | $10.00 |
| 626E00112 BARRIER REFLECTOR, TYPE 3 (TWO-WAY) | 4 EACH | $12.50 | $12.00 | $50.00 | $25.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 50 FT | $18.50 | $12.00 | $50.00 | $25.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 6 EACH | $150 | $40.00 | $50.00 | $300 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 4 EACH | $25.00 | $15.00 | $50.00 | $1,000 |
| 644E00104 EDGE LINE, 6" | 0.02 MILE | $83,000 | $25,000 | $200,000 | $95,000 |
| 644E00300 CENTER LINE Section 5 - TRAFFIC CONTROL - Totals Awd $4,465.00 2 $1,868.00 3 $9,200.00 4 $10,150.00 | 0.01 MILE | $83,000 | $42,000 | $200,000 | $110,000 |
| 619E16000 FIELD OFFICE, TYPE A | 2 MNTH | $100 | $2,200 | $1,000 | $100 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1,500 | $5,500 | $25,000 | $25,000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →